ML16341F594

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 11 to EPIP EP G-4, Personnel Accountability & Assembly. W/900305 Release Memo
ML16341F594
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 02/14/1990
From: Womack L
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML16341F595 List:
References
DCL-90-045, DCL-90-45, GL-81-27, NUDOCS 9003090300
Download: ML16341F594 (6)


Text

. ACCELERATED DISTIUBUTION DEMONSTjRATION SYSIXlVI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RXDS)

ACCESSION NBR: 9003090300 DOC. DATE: 90/02/14 NOTARXZED: NO DOCKET FACIL:50-275 Diablo Canyon Nuclear Power Plant, Unit 1, Pacific Ga 05000275 50-323 Diablo Canyon Nuclear Power Plant, Unit 2, Pacific Ga 05000323 AUTH. NAME AUTHOR AFFILIATION WOMACK,L.F. Pacific Gas & Electric Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards public version of Rev ll to EPIP EP G-4, "Personnel Accountability 6 Assembly." W/900305 release memo.

DISTRIBUTION CODE: DF01D COPIES RECEIVED:LTR ENCL , SXZE:

TITLE: Direct Flow Distribution: 50 Docket (PD Avail)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL INTERNAL: NUDOCS-ABSTRACT 1 1 EG FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 "1" NOTE TO ALL "RIDS" RECIPIENIS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE.DOCUMENT CONIROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 5 ENCL 5

t C

~ k

1 i '

)a j ~4

'.'acific Gas ano iiecuic Company February 14, 1990 PG&E Letter No. DCL-90-045 U.S. Nuclear Regulatory Commission t

ATTN: Document Control Desk Washington, D.C. 20555 gi Re: Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Emergency Plan Implementing Procedures Update Gentlemen:

PG&E is submitting one copy of the Update to the Detailed Implementing Procedures for the Diablo Canyon Power Plant Units 1 and 2 Emergency Plan (Enclosure 2). This update is an on-the-spot-change (OTSC) that was implemented on January 17, 1990.

Concurrently, two copies of the update are being submitted to the NRC, Region V office, and one copy is being submitted to the NRC Resident Inspector.

This update contains some privacy/proprietary information that is identified in Enclosure 1 and bracketed in accordance with NRC Generic Letter 81-27.

Kindly acknowledge receipt of this material on the enclosed copy of this letter and return it in the enclosed addressed envelope.

Sincerely, L. F. Womack Enclosures cc w/encs.: J ~ B. Hartin/R. F. Fish (2) w/acknowledgement copy P. P. Narbut cc w/enc. 2 (cover only):

A. P. Modgdon H. H. Hendonca M. Rood CPUC Diablo Distribution 3063S/0078K/BJB/1345 9003090300 900214 PDR ADOCK Q5000275 F PDC DR> I Ij I

l P

~ 'fi c'E Js

~ Pw+<

~S 4EPp

+ 0 UNITED STATES I'y O

NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 0

March 5, 1990

~O

+%*4+

50-275/323 Diablo Canyon MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available.

yP~ ~8 Donni e H. Grims 1 ey, Director Division of Rules and Rec rds Office of Administration

Attachment:

As stated

'e

'0

/ y+ ~