05000266/LER-1998-010, Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl
ML20236Y227
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 08/03/1998
From: Kaminskas V
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236Y229 List:
References
NPL-98-0650, NPL-98-650, NUDOCS 9808120012
Download: ML20236Y227 (1)


LER-2098-010, Forwards LER 98-010-01,re Containment Spray Channel Functional Testing.Commitments Made within Ltr,Encl
Event date:
Report date:
2662098010R00 - NRC Website

text

_ . - - - - _ - - . . ---- - - - - - - - - _ _- --- _ _ ._--- _ -----

e

, l Wisconsin \

' Electnc

,, POWER COMPANY

\

Poin Beach NuclearPlant (920) 755-2321 66 h + Nuclear Rd.. Two Rivers. WI 5424 i l NPL 98-0650 10 CFR 50.73 August 3,1998 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mai! Station PI-137 Washington,DC 20555 Ladies / Gentlemen:

DOCKETS 50-266 AND 50-301 SUPPLEMENTAL LICENSEE EVENT REPORT 98-010-01 4

INADEOUATE TECHNICAL SPECIFICATIONS {

SURVEILLANCE OF CONTAINMENT SPRAY LOGIC  !

POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l 1

Enclosed is supplement Licensee Event Report 98-010-01 for Point Beach Nuclear Plant, Units 1

]

and 2. This report is provided in accordance with 10 CFR 50.73(a)(2)(i)(B),"Any operation or "

condition prohibited by the plant's Technical Specifications." The original report describes the discovery that Technical Specification surveillance of the containment spray channel functional test was not adequate. Subsequent to the completion of the corrective actions proposed in that report, licensee personnel determined that the testing for continuity of the containment spray logic test switches was incomplete. The testing did not independently verify test L.Geh continuity to both Train A and Train B containment spray logic relays.

New commitments within the report are indicated in italics. ,

1 If you require additional information, please contact us.

Sincerely, V

Vito A. Kaminskas Y2 926 W 6 / f Manager, Regulatory Services & Licensing l

Attachment 1.. v C d Ei cc: NRC Resident Inspector NRC Project Manager NRC Regional Administrator INPO Support Services 9808120012 980803 8 i PDR ADOCK 05000266 [ I S

PDR g asawwwsunmuuamnurauur

),

L _____ _ ______--- __ ------- _ - - _ _ _ - - _ _ _ - - - I