05000266/LER-1998-007, Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on

From kanterella
Jump to navigation Jump to search
Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on 980112
ML20203E313
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 02/20/1998
From: Dante Johnson
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20203E317 List:
References
REF-PT21-98 NPL-98-0123, NPL-98-123, NUDOCS 9802270022
Download: ML20203E313 (1)


LER-2098-007, Forwards LER 98-007-00 Re Event or Condition That Resulted in Condition of Nuclear Plant,Including Principal Safety Barriers,Being Seriously Degraded.Mfg Deficiency Previously Reported to Commission Via 10CFR21 Notification on 980112
Event date:
Report date:
2662098007R00 - NRC Website

text

- - - - . ..

1 Wisconsin 1

Electnc POWER COMPANY Point Beach Nuclear Nant (920) 7W2321 6610 Nuclear Qd , Iwo Rivers. WI 54241 NPL 98 0123 February 20,1P98 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Wtshingtor, DC 20$55 Ladies / Gentlemen:

DD_CKET 50-266 1,1CENSliliJiVJXTJ1EPORT 98-007-00 REBICIlYE TURBJEE-DltlVJIN_AUXILl6RY FEEpWATFAEUME 1,DESUfTJON PRESSUREl1UfllMEEJMYJ1ELAY EDiEIJUMCll NUC15AR_PlAF1 UNIT 1 Enclosed is Licensee Event Report 98 007-00 for Point Beach Nuclear Plant, Unit 1. This report is provided in accordance with 10 CFR 50 73(a)(2)(ii)(B),"Any event or condition that resulted in the condition of the nuclear plant, includir;its principal safety barriers, being seriously degraded; or that resulted in tre nuclear power plant being in a condition that was outside the design hasis of the plant." This report describes the discovery that the Unit I turbine-driven auxiliary feedwater pump (TDAFWP) low suction pressure trip time delay relay was discovered to not have a complete solder joint. This manufacturing deficiency was previously reported to the Commission via a 10 CFR 21 notification submitted by the vendor, Thomas & Betts, on s January 12,1998, if you require additional information, please contact us. [

Sincerely, Or- -_ ~

Douglas F. Johnson d# .C 7 hlanager, Regulatory Services & Licensin j 980227ti:X!2 980220 Enclosure PDR A1/dCK 05000266 S PDR cc: NRC Resident Inspector NRC Regional Administrator q INPO Support Services ;h ,un p iu J Lg' ] i -

NRC Project Manager PSCW A suwuyornimmv Eww avpauw