IR 05000266/2023004 | 1 February 2024 | Integrated Inspection Report 05000266/2023004 and 05000301/2023004 | |
IR 05000266/2023402 | 14 November 2023 | Security Baseline Inspection Report 05000266/2023402 and 05000301/2023402 | |
IR 05000266/2023003 | 16 October 2023 | Integrated Inspection Report 05000266/2023003 and 05000301/2023003 | Functionality Assessment FLEX Operability Determination Fire Protection Program |
IR 05000266/2023501 | 29 August 2023 | Emergency Preparedness Biennial Exercise Inspection Report 05000266/2023501 and 05000301/2023501 | Siren |
IR 05000266/2023005 | 24 August 2023 | Updated Inspection Plan for Point Beach Nuclear Plant (Report 05000266/2023005 and 05000301/2023005) | |
IR 05000266/2023002 | 18 July 2023 | Integrated Inspection Report 05000266/2023002 and 05000301/2023002 | Boric Acid Internal Flooding Past operability Functionality Assessment Operability Determination License Renewal Maintenance Rule Program Fire Protection Program |
IR 05000266/2023401 | 13 July 2023 | Public-Point Beach Nuclear Plant-Security Baseline Inspection Report 05000266/2023401; 05000301/2023401; Independent Spent Fuel Storage Security Inspection Report 07200005/2023401 | Affidavit |
IR 05000266/2023001 | 1 May 2023 | Integrated Inspection Report 05000266/2023001 and 05000301/2023001 | Boric Acid Internal Flooding Nondestructive Examination Temporary Modification Nuclear Accident Reporting System Functionality Assessment FLEX Significance Determination Process Foreign Material Exclusion Operability Determination Liquid penetrant Fire Protection Program Power change Operability Assessment |
IR 05000266/2023301 | 28 March 2023 | NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 | Job Performance Measure |
IR 05000266/2022006 | 1 March 2023 | Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022006 and 05000301/2022006) | Commercial Grade Dedication Exemption Request COVID-19 |
IR 05000266/2023010 | 23 February 2023 | Comprehensive Engineering Team Inspection Report 05000266/2023010 and 05000301/2023010 | Safe Shutdown Unanalyzed Condition Boric Acid Stroke time Probabilistic Risk Assessment Functionality Assessment Incorporated by reference Aging Management Significance Determination Process Operability Determination Time Critical Operator Action License Renewal Flow Induced Vibration Weak link GOTHIC Power Uprate |
ML23009B700 | 24 January 2023 | Review of the Spring 2022 Steam Generator Tub Inspections Report | |
IR 05000266/2022004 | 24 January 2023 | Integrated Inspection Report 05000266/2022004 and 05000301/2022004 | Safe Shutdown Boric Acid Reactor Vessel Water Level Ultimate heat sink Stroke time Post Accident Monitoring Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Operability Determination Severe Accident Management Guideline Maintenance Rule Program Fire Protection Program Siren |
IR 05000266/2022401 | 8 December 2022 | Security Baseline Inspection Report 05000266/2022401 and 05000301/2022401 | Safeguards Contingency Plan |
IR 05000266/2022404 | 2 December 2022 | Cyber Security Inspection Report 05000266/2022404 and 05000301/2022404 | Cyber Security Affidavit |
IR 05000266/2022003 | 7 November 2022 | Integrated Inspection Report 05000266/2022003 and 05000301/2022003 | Grab sample Offsite Dose Calculation Manual Internal Flooding Functionality Assessment Operability Determination Through-Wall Leak Through Wall Leak Fire Protection Program Substantial potential for an overexposure Overexposure |
ML22298A297 | 27 October 2022 | Review of the Fall 2021 Steam Generator Tube Inspections Report | |
IR 05000266/2022012 | 29 September 2022 | Biennial Problem Identification and Resolution Inspection Report 05000266/2022012 and 05000301/2022012 | Boric Acid Aging Management License Renewal Liquid penetrant Through Wall Leak Preliminary White Finding Operability Assessment |
IR 05000266/2022005 | 26 August 2022 | Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) | Commercial Grade Dedication Exemption Request Coronavirus |
IR 05000266/2022011 | 3 August 2022 | Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011 | Safe Shutdown Fire Barrier Significance Determination Process Fire Protection Program |
IR 05000266/2022002 | 27 July 2022 | Integrated Inspection Report 05000266/2022002 and 05000301/2022002 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area FLEX Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Scaffolding Substantial potential for an overexposure Overexposure |
IR 05000266/2022001 | 4 May 2022 | Integrated Inspection Report 05000266/2022001 and 05000301/2022001 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Fire Protection Program Power change |
IR 05000266/2021006 | 2 March 2022 | Annual Assessment Letter for Point Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021006 and 05000301/2021006) | Exemption Request Coronavirus |
IR 05000266/2022010 | 9 February 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000266/2022010 and 05000301/2022010 | Power-Operated Valves Power Operated Valves |
IR 05000266/2021004 | 28 January 2022 | Integrated Inspection Report 05000266/2021004 and 05000301/2021004 and Exercise of Enforcement Discretion | Safe Shutdown Unanalyzed Condition Boric Acid High Radiation Area Fire Barrier Internal Flooding Enforcement Discretion Temporary Modification Tornado-Generated Missile Tornado Generated Missile Tornado Missile Protection Liquid penetrant Through Wall Leak Fire Protection Program |
IR 05000266/2021402 | 10 November 2021 | Security Baseline Inspection Report 05000266/2021402 and 05000301/2021402 | Safeguards Contingency Plan Coronavirus COVID-19 |
IR 05000266/2021003 | 20 October 2021 | Integrated Inspection Report 05000266/2021003 and 05000301/2021003 | Fire Barrier Internal Flooding Enforcement Discretion Functionality Assessment Job Performance Measure Process Control Program Operability Determination Coronavirus COVID-19 Preliminary White Finding Fire Protection Program |
IR 05000266/2021501 | 5 October 2021 | Emergency Preparedness Biennial Exercise Inspection Report 05000266/2021501 and 05000301/2021501 | Pandemic Coronavirus COVID-19 |
IR 05000266/2021301 | 14 September 2021 | NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 | Job Performance Measure |
IR 05000266/2021005 | 1 September 2021 | Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2021005 and 05000301/2021005) | Cyber Security Exemption Request Coronavirus |
IR 05000266/2021403 | 4 August 2021 | Security Baseline Inspection Report 05000266/2021403 and 05000301/2021403 | Fitness for Duty Coronavirus COVID-19 |
IR 05000266/2021002 | 29 July 2021 | Integrated Inspection Report 05000266/2021002, 05000301/2021002, and 07200005/2021001 | Safe Shutdown Non-Destructive Examination Offsite Dose Calculation Manual Tornado Missile Functionality Assessment Aging Management Significance Determination Process Operability Determination Coronavirus COVID-19 Liquid penetrant Fire Protection Program Scaffolding Substantial potential for an overexposure Overexposure |
IR 05000266/2021010 | 1 July 2021 | Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000266/2021010 and 05000301/2021010 | Packing leak Coronavirus COVID-19 Power Uprate |
IR 05000266/2021001 | 21 April 2021 | Integrated Inspection Report 05000266/2021001 and 05000301/2021001 | Boric Acid High winds Enforcement Discretion Temporary Modification Functionality Assessment FLEX Significance Determination Process Operability Determination Spent Fuel Pool Instrumentation Coronavirus COVID-19 Liquid penetrant Pressure Boundary Leakage Pressure boundary leak Through Wall Leak Fire Protection Program Power change Unidentified leakage |
IR 05000266/2021401 | 16 March 2021 | Security Baseline Inspection Report 05000266/2021401; 05000301/2021401; Independent Spent Fuel Storage Security Inspection Report 07200005/2021401 | |
IR 05000266/2020006 | 4 March 2021 | Annual Assessment Letter for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020006 and 05000301/2020006) | Exemption Request Coronavirus |
IR 05000266/2020090 | 9 February 2021 | Final Significance Determination of a Green Finding; NRC Inspection Report 05000266/2020090 and 05000301/2020090 | Preliminary White Finding |
IR 05000266/2020004 | 8 February 2021 | Integrated Inspection Report 05000266/2020004 and 05000301/2020004 | Safe Shutdown Boric Acid Stroke time Time to boil Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Aging Management Operability Determination License Renewal Coronavirus COVID-19 Liquid penetrant Fire Protection Program |
IR 05000266/2020402 | 14 December 2020 | Security Baseline Inspection Report 05000266/2020402 and 05000301/2020402 | Coronavirus COVID-19 |
IR 05000266/2020003 | 4 November 2020 | Integrated Inspection Report 05000266/2020003 and 05000301/2020003 | Safe Shutdown High winds Internal Flooding Temporary Modification Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program Siren |
IR 05000266/2020010 | 24 September 2020 | Biennial Problem Identification and Resolution Inspection Report 05000266/2020010 and 05000301/2020010 | Cyber Security Condition Adverse to Quality Tornado Missile Protection Coronavirus COVID-19 Siren |
IR 05000266/2020005 | 1 September 2020 | Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2020005 and 05000301/2020005) | Fitness for Duty Cyber Security Exemption Request Coronavirus |
IR 05000266/2020002 | 6 August 2020 | Integrated Inspection Report 05000266/2020002 and 05000301/2020002 | Enforcement Discretion Temporary Modification Functionality Assessment Aging Management Operability Determination Coronavirus COVID-19 Fire Protection Program |
IR 05000266/2020012 | 3 August 2020 | NRC Inspection Report 05000266/2020012 and 05000301/2020012; Preliminary White Finding and Apparent Violations | Significance Determination Process Coronavirus COVID-19 Preliminary White Finding |
IR 05000266/2020011 | 29 July 2020 | Design Basis Assurance Inspection (Teams) Inspection Report 05000266/2020011 and 05000301/2020011 | Boric Acid Mission time Internal Flooding Past operability Large early release frequency Coronavirus COVID-19 Weak link Power Uprate |
IR 05000266/2020001 | 13 May 2020 | Integrated Inspection Report 05000266/2020001 and 05000301/2020001 | Boric Acid Reactor Vessel Water Level Packing leak Fire Barrier Hydrostatic Nondestructive Examination VT-2 Functionality Assessment FLEX Operability Determination Coronavirus COVID-19 Fire Protection Program Power change Unidentified leakage |
ML20100G890 | 7 April 2020 | Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000266/2020-011 and 05000301/2020-011 | Stroke time Temporary Modification Aging Management Job Performance Measure |
IR 05000266/2020401 | 30 March 2020 | Security Baseline Inspection Report 05000266/2020401 and 05000301/2020401 | |
IR 05000266/2019006 | 3 March 2020 | Annual Assessment Letter for Point Beach Nuclear Plants, Units 1 and 2 (Report 05000266/2019006 and 05000301/2019006) | License Renewal |
IR 05000266/2019004 | 5 February 2020 | Integrated Inspection Report 05000266/2019004 and 05000301/2019004 | Boric Acid Packing leak Ultimate heat sink Fire Barrier Commercial Grade Dedication Internal Flooding Temporary Modification Functionality Assessment Significance Determination Process Job Performance Measure Foreign Material Exclusion Fire Protection Program Downpower |