Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115
ML20211Q343
Person / Time
Site: Beaver Valley FirstEnergy icon.png
Issue date: 09/08/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cross J
DUQUESNE LIGHT CO.
References
NUDOCS 9909150047
Download: ML20211Q343 (3)


Text

i F

3 4

September 8, 1999 i

Mr. J. E. Cross President Generation Group Duquesne Light Company Beaver Valley Power Station Post Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - BEAVER VALLEY 1 1

Dear Mr. Cross:

In a telephone conversation on September 3,1999, Mr. L. Briggs, Examiner / inspector, and Mr.

T. Kuhar, Supervisor of Licensed Operator Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Beaver Valley Unit 1 Station. The inspection is planned for the week of November 15,1999, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the l requalification examinations in accordance with your NRC-approved requalification program. j In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to

)

support the NRC's inspection program needs. In order for the NRC to adequately prepare for  ;

this inspection, please fumish the exam seek schedule and the written examinations and l operating tests scheduled for the week of the inspection to the NRC by November 1,1999.

Mr. Kuhar has been advised of this request and was provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of O Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the .

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail atBJS18NRC. GOV: and to the j Desk Officer, Office of information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

f {

l The NRC may not conduct or spensor, and a person is not required to respond to, a collection of information unless it displays a currently vaM OMB control number.

9909150047 990909 PDR ADOCK 05000334 V PDR L

4 Mr. J. E. Cross Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact L. Briggs at (610) 337-5366.

Sincerely, ORIGINAL SIGNED BY:

Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety Docket No. 50-334 cc:

Sushil C. Jain, Senior Vice President, Nuclear Services Group Mr. L. W. Myers, Executive Vice President, Generation Group K. Ostrowski, Vice President, Nuclear Operations Group and Plant Manager R. Brandt, Vice President, Operations Support Group i B. Tuite, General Manager, Nuclear Operations Unit W. Kline, Manager, Nuclear Engineering Department M. Pearson, Manager, Quality Services Unit M. Ackerman, Manager, Safety & Licensing Department

( J. Macdonald, Manager, System and Performance Engineering i J. A. Hultz, Manager, Projects and Support Services, FirstEnergy M. Clancy, Mayor, Shippingport, PA l Commonwealth of Pennsylvania l - State of Ohio l State of West Virginia l

T. Kuhar, Supervisor of Licensed Operator Training

' Mr. J. E. Cross Distribution:

~ Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

PUBLIC NRC Resident inspector H. Miller, RA/J, Wiggins, DRA P. Eselgroth, DRP N. Perry, DRP C. O'Daniell, DRP W. Lanning, DRS B. Holian, DRS R. Conte, DRS L. Briggs, DRS OL Facility File (V. Curley, DRS)

DRS File Distribution w/enci NIA E-MAIL).

M. Tschiltz, OEDO E. Adensam, PD1, NRR S. Bajwa, NRR D. Collins, NRR V Nerses, NRR

~

R. Correia, NRR '

DOCDESK Inspection Program Branch, NRR (IPAS) '

i i

l DOCUMENT NAME: G:\HPEPB\ BRIGGS \BV160DAYRPl.WPD To receive a copy of this document. Indicate in the box: "C" = Co n without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS ., l Rl/DRS A f; / l l l NAME LBriggs 77// RCon))bW/

DATE 09 % /96 09/)"/99 I/ 09/ /99 09/ /99 09/ /99 8 OFFICIAL RECORD COPY