ML20207B820

From kanterella
Jump to navigation Jump to search
Informs Licensee of Individual Exam Results for Applicants on Initial & Retake Exams Conducted on 990510-11 at Licensee Facility.Without Encls
ML20207B820
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/25/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finn B
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 9906020129
Download: ML20207B820 (2)


Text

l .

May 25, 1999 l

i Mr. Brian Finn Manager - Training Vermont Yankee Nuclear Power Station l

P. O. Box 157 Governor Hunt Road Vernon, VT 05354

Dear Mr. Finn:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial and retake examinations conducted on May 10-11,1999, at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. This information is considered to be " proprietary" in accordance with 10 CFR 2.790 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

Enclosure 1 is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results.

Enclosure 2 contains the individual results ES-303-1 and 303-2, Operator License Examination Report, (NRC Form 157) for the applicant. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individualindependent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398. -

i Enclosure 3 is a copy of the licenses issued.

Thank you for your cooperation in this matter. Please refer any questions you have to me at 610-337-5183.

Sincerely, Original signed by Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch I Division of Reactor Safety (

Docket Nos. 50-271 -( }

OFFICIAL RECORD COPY

,.- i. a -,

f 9906020129 990525 /

i PDR ADOCK 05000271 d V PDR

[e u

4 Mr. Brian Finn

Enclosures:

1.. ES-501-2, Power Plant Licensing Examination Results Summary

2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/o encls:

M. Balduzzi, Plant Manager PUBLIC bec w/o encis:

Master Exam File DOCUMENT NAME: A:\innotvt. d Ta receive a copy of this document, Indicate he box: "C" = Co >y without attachrnent/ enclosure "E" = Copy with ettschment/ enclosure "N" = No copy 0FFICE RI/DRS / l RI/MS / l l l NAME- Curley ((/ Silk \

DATE 05/18/99 05/ /9K 05/ /99 05/ /99 05/ /99

'dFICIALRECORDCOPY DOCUME T NAME: A:\initno.

T2 receive a e of this document. Indiegte in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE RIMS l' RI/DRS l RI/DRS / l l NAME Curleh Dhtonio Conte #

DATE 05/18/99\ 05/ \ /99 05/4/99 05/ /99 05/ /99

\ \0FFICIALREC4RDCOPY

<