ML20137X674

From kanterella
Jump to navigation Jump to search
Informs That Region IV Will Host Operator Licensing Exam Development Workshop in Arlington,Tx on 970529-30
ML20137X674
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/16/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
References
GL-95-06, GL-95-6, NUDOCS 9704220119
Download: ML20137X674 (6)


Text

. - -

-

  • p t>8 M00g UNITED STATES

.7$ t NUCLEAR REGULATORY COMMISSION j- R EGloN IV i

' k s' [ 611 RYAN PLAZA DRIVE, SUITE 400 *

'h....., AR LINGToN, TEXAS 76011-8064 APR I 61997 i

4 ,

Otto L. Maynard, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 l Burlington, Kansas 66839 .l l

SUBJECT:

OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP l i

Dear Mr. Maynard:

j i

in recent weeks, after an internal audit, Region IV has recognized the need for enhanced l expectations for the quality of initiallicensing examinations developed under the pilot process j of Generic Letter 95-06 or the " Operator Licensing Examination Standards for Power Reactors," Interim Revision 8. These new expectations represent a significant increase in NRC expectations regarding initial licensing examination quality than has been previously communicated by the Region to facility licensees. In several recent meetings with Region IV facilitylicensee representatives fro ~.' operations and training organizations, regional management has presented these clarified expectations with regard to facility licensee- l developed initial licensing examinations. i l

Additionally, chief examiners have been communicating these expectations at the staff level l to individual facility licensee personnel for facility licensees that have initial examinations l scheduled to be administered over the next few months. The thrust of these expectations is j that facility licensees will be held to a higher level of quality at the individual test item level than has been previously required. in response to these communications, facility licensee ,

representatives have requested that the NRC provide a forum in which facility licensee l personnelinvolved in examination development can better understand how these expectations translate into actual test items, i i

On May 29 and 30,1997, Region IV will host a workshop in its Arlington, Texas, office on )

test item and examination development to meet agency expectations of facility licensee- J developed initiallicensing examinations. The workshop will start at 8:30 a.m.on May 29 and ]

conclude by 1 p.r, . on May 30. A tentative workshop agenda is attached. Cornments are welcome. This v+.xsnop w.6be open to the public.

l 220019 I 97 42 g { $7 2 Qp BBB w -

I

Wolf Creek Nuclear Operating Corporation You areinvited and encouraged to send representatives from your organization who are likely to be directly involved in initial licensing examination development. Our facility can accommodate a large number of attendees. However, if you expect to send more than four attendees, please inform us so that we may ensure the room arrangement is appropriate.

Please direct comments or questions to John Pellet, Chief, Operations Branch, Division of Reactor Safety at (817)860-8159 or Stephen McCrory, Workshop Coordinator, Operations Branch at (817)860-8265, or via electronic mail to jlp@nrc. gov and sim@nrc. gov, respectively.

Sincerely,

,Xbh 0. lb/

p Arthur T. Howell lil, Director Division of Reactor Safoty j Docket No.: 50 482 License No.: NPF-42

Enclosure:

Tentative Workshop Agenda cc w/

Enclosure:

Chief Operating Officer Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, Kansas 66839 Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, D.C. 20037 Supervisor Licensing Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, Kansas 66839 Chief Engineer Utilities Division Kansas Corporation Commission 1500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027

c-q

.' j; Wolf Creek Nuclear' '

. Operating' Corporation :

i i

bffice of the Governor-  ;

State'of Kansas

? Topeka, Kansas _' 66612 L Attorney General Judicial Center ,

- 301 S.W.10th -;

?2nd Floor: )

. Topeka, Kansas 66612-1597-LCounty. Clerk -

W -:Coffey County Courthouse

' l

Burlington, Kansas . 668391798 Public Health Physicist Division of Environment. , '!

)

Kansas Department of Health and Environment H Bureau ~of Air & Radiation Forbes Field Building 283

. Topeka, Kansas 66620 i g .Mr. Frank Moussa

Division of Emergency Preparedness 2800 SW Topeka Blvd.

. Topeka, Kansas 66611-1287 1

by f

5

)

f u_

~

+- e-3

.u . .

y1

'I

-F t

~

' Wolf Creek Nuclear '

~

- Operating Corporation

bec to DCD (IE42) 4

. bec oistrib. by RIV' :-  ;

Regional Administra' tor . Resident inspector + -l DRP Director - SRI (Callaway, RIV) ,

' Branch Chief (DRP/B) DRS-PSB Project Engineer (DRP/B) ' MIS System Branch Chief (DRP/TSS) RIV File

~S. Richards'(MS 10D22) I u  !

l l

i t

'I

, j

'l i l

4-

-l

. i i

DOCUMENT NAME: R:\_WC\WCLT416.imb To receive copy of A- n :% indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy.

RIV:RE:OB C:OB D:DRS l SLMcCrory/Imby[g JLPellet .. .g' ATHowell,g72 I 04/p/97 . e/ev 04////97 p 04//t/97 feu .]

OFFICIAL RECORD COPY j y _4 l '

l

~.

, _ , . -. - _ _ a

V 1 e

Wolf Creek Nuclear Operating Corporation l

bcc to DCD (IE42)'

bec distrib. by RIV:

Regional Administrator Resident inspector j DRP Director SRI (Callaway, RIV)

Branch Chief (DRP/B) DRS PSB j Project Engineer (DRP/B) MIS System Branch Chief (DRP/TSS) RIV File S. Richards (MS 10D22)

DOCUMENT NAME: R:\_WC\WCLT416. lmb To receive copy of document, indicate in box: "C" = Copy wthout enclosures "E" = Copy with enclosures "N" = No copy RIV:RE:OB C:OB D:DRS SLMcCroryllmb y!,r' JLPellet yfj/' ATHowell yff>

04fbl97 v 04l(tl97 lW 041/l/97 y'*-v

~

OFFIClAL RECORD COPY

+

ENCLOSURE OPERATOR LICENSING EXAMINATION DEVELOPMENT WORKSHOP AGENDA DAY 1 - MAY 29,1997 l 1

Introduction (8:30-9 a.m.)-

Session 1 (9-10 a.m.) Generic Attributes of Good Test items l Session 2 (10:15-11:30 a.m.) Written Examination Questions Session 3 (12:30-2 p.m.) Open Reference Oral Questions (Job Performance Measure and Administrative)

I Session 4 (2-3 p.m.) ' Administrative Job Performance Measures Session 5 (3:15-4:30) System Job Performance Measures and Job Performance Measure Sets Session 6 (4:30-5 p.m.) Questions and Answers DAY 2 - MAY 30,1997 Session 7 (8:30-9:30 a.m.) Scenarios and Scenario Sets Session 8 (9:30-10:15 a.m.) Breadth, Depth, Overlap, and Examination Outlines Session 9 (10:30-12 noon) Questions and Answers Closing Remarks (12-12:30 p.m.)

5 n