Ack Receipt of Petition Pursuant to 10CFR2.206 Submitted on 961206 on Behalf of Citizens Awareness Network,Inc.Nrc Will Take Action W/Regard to Issues Raised in Petition within Reasonable Time
ML20134L553
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/12/1997
From: Miraglia F
NRC (Affiliation Not Assigned)
To: Block J
CITIZENS AWARENESS NETWORK
Shared Package
ML20134L556 List:
References
2.206, NUDOCS 9702190196
Download: ML20134L553 (4)


Text

.- - . .. - - - - - - -. - .-- .- - - - _ . - - ~ _ -

, g ..,\ "

UNITED STATES g  ;

NUCLEAR REGULATORY COMMISSION WASHINGTON. o.C. sese64em

\*e.* February 12, 1997 Jonathan M. Block, Esq.

Main Street P. O. Box 566 Putney, VT 05346-0566

Dear Mr. Block:

This letter acknowledges receipt of a Petition pursuant to 10 CFR 2.206 i submitted by you on December 6,1996, on behalf of Citizens Awareness Network, j Inc. (CAN or Petitioner). The Petition was submitted to the Secretary of the U.S. Nuclear Regulatory Conunission (NRC) and requested avaluation of cert .in documents relating to the Vermont Yankee Nuclear Power Station operated by the Vermont Yankee Nuclear Power Corporation (Licensee). The Petition was forwarded to my office for response.

The first document included in the Petition is a CAN memorandum dated December 5, 1996, that reviews information' presented by the Licensee at an enforcement conference held on July 23, 1996, involving the Vermont Yankee residual heat removal system minimum flow valves. CAN raises a concern that the corrective action taken by the Licensee in opening these valves may have introduced an unreviewed safety question with regard to containment isolation.

The minimum flow valves open a flow path from the pump discharge to below the surface in the suppression pool. The piping containing these valves penetrating containment is seismic Category I, with a water seal and does not connect to containment atmosphere. There is a check valve upstream in each individual pump line. The minimum flow valve, though open, can be remotely operated. The staff's preliminary review indicates that the water seal a' i check valves meet Appendix J requirements with the minimum flow valve init.a1 position open. These valves are required to be open for automatic low pressure coolant injection initiation during an accident. They are not required to close automatically for containment isolation.

1 The second document included in the Petition is a CAN memorandum dated December 6,1996, that contains a review of certain licensee event reports (LERs) submitted by the Licensee in the latter part of 1996. A variety of ,

issues are presented, including fire protection, tornado protection, thereal '

protection for piping lines, equipment operability, and equipment testing. On the basis of its analysis of the LERs, CAN reaches certain conclusions regarding the performance of the Licensee and actions that should be taken.

On the basis of these documents, CAN requests that the NRC determine whether

! enforcement action is warranted pursuant to 10 CFR 2.206.

(

190021 9702190196 970212 PDR ADOCK 05000271 G PDR

_ . . .. . .. .. _- . . - - - - - __ - _ - ~ - . - . . .. .-

l Jonathan M. Block In accordance with 10 CFR 2.206, the NRC will take action with regard to the

issues raised in the Petition within a reasonable time. For your information, I have enclosed a copy of the notice that is being filed with the Office of the Federal Register for publication. For your information, Mr. Vernon Rooney (415-3045), has been designated as the Petition Manager for this Petition. I have also enclosed for your information a pamphlet on the public petition process.

Sincerely,

- ', V' Frank J. ag Acting Director l Office af Nuclear Reactor Regulation l

Enclosures:

1. Federal Reaister Notice
2. Public Petition Process cc w/encls: See next page I

i w

n Jonathan M. Block' . February 12, 1997

.In accordance :.;th 10 CFR 2.206, the NRC will take action with regard to the issues raised in the Petition within a reasonable time. For your information,

, I have enclosed a copy of the' notice that is being filed with the Office of

, the-Federal Register for publication. For your information, Mr. Vernon Rooney (415-3045), has been designated as the Petition Manager for this Petition. I l have also enclosed for your information a pamphlet on the public petition process.

Sincerely, orfsinnt eignea M

! .. Frad J. E1:041% '

Frank J. Miraglia, Acting Director

. Office of Nuclear Reactor Regulation i

L

Enclosures:

1. Federal Reaister Notice
2. Pamphlet on the Petition Process
cc w/encls
See next page I

Distribution

Docket File;(50-271) (w/ original incoming letter) j PUBLIC (w/ incoming letter)

EDO# G960950 OPA

.. EDO Reading OCA-i PDI-3 Reading (w/ incoming) CNorsworthy 4- HThompson (A) '

JGoldberg l JBlaha  ;

, i RConte l

.JLieberman RMiller i

! FMiraglia/AThadani '

4 WReamer 1 RZimmerman BSheron i WTravers.. -^ ,

'~ '

JKennedy ' - w n y SVarga , .

JZwolinski , .

PMilano

+ -

Slittle ,

VRooney >

4 V .'

1, "

MBoyle (MLB4) .

I NRR Mailroom (EDO#- G960950 w/ incoming) ,

,n DOCUMENT NA,ME: G:\R00NEY

. =v. m.4=.n.m. + n\ACK.129 m. m.= c - p., *SEE' -e.m .n PREVIOUSn-.ne.ne vCONCURRENCE

- c.,y m .n=h-.nu.nm. v - w my ,

0FFICE PM:PDI-SfJ/l LA:PDIfB1V l (A)D:PDb3 . L TECH ED l 004 i f /21/ L NAME VRooney/ M '

Slitt W PMil and"' i BCalure* K-H2WT1 %

DATE 02 o 97- 01 30 97-0FFICE DD:DRPE D:DRPE ADPR/NRR ) D:NIE NAME JZwolinski* SVarga* RZimmermanp(Q- FMWglia DATE 02/04/97 02/04/97 02/fl/97 vi 02/h/37-0FFICIAL RECORD COPY 9

l

e i

. 1 l

. D. Reid Vermont Yankee Nuclear Power Station l l Vermont Yankee Nuclear Power  !

! Corporation j cc:

l Regional Administrator, Region I Mr. David Rodham, Director

U. S. Nuclear Regulatory Commission ATTN
James Muckerheide 475 Allendale Road Massachusetts Civil Defense Agency i

King of Prussia, PA 19406 400 Worcester Rd.

l P.O. Box 1496

. R. K. Gad, III Framingham, MA 01701-0317 l Ropes & Gray One International Place Mr. Raymond N. McCandless i Boston, MA 02110-2624 Vermont Division of Occupational  ;

l and Radiological Health 4 Mr. Richard P. Sedano, Commissioner Administration Building

! Vermont Department of Public Service Montpelier, VT 05602 i 120 State Street, 3rd Floor j j Montpelier, VT 05602 Mr. J. J. Duffy 1 i

Licensing Engineer 1 i Public Service Board Vermont Yankee Nuclear Power

{ State of Vermont Corporation i 120 State Street 580 Main Street

Montpelier, VT 05602 Bolton, MA 01740-1398 l Chainsan, Board of Selectmen 1

! lown of Vernon

! P.O. Box 116 Vernon, VT 05354-0116

{

i Mr. Richard E. McCullough i Operating Experience Coordinator

Vermont Yankee Nuclear Power Station i

P.O. Box 157 i Governor Hunt Road i Vernon, VT 05354 I

I G. Dana Bisbee, Esq.

i Deputy Attorney General i' 33 Capitol Street Concord, NH 03301-6937

?

Resident Inspector j Vermont Yankee Nuclear Power Station i U.S. Nuclear Regulatory Commission

} P.O. Box 176 Vernon, VT 05354 j

j Chief, Safety Unit i Office of the Attorney General 4 One Ashburton Place,19th Floor j Boston, MA 02108 4

. ~ . - _ - . - _ . _ _ _ _ _ - -, - _.

t r

i Mr. Robert J. Wanczyk, Plant Manager Vermont Yankee Nuclear Power Station P.O. Box 157, Governor Hunt Road Vernon, VT 05354 Mr. Ross B. Barkhurst, President Vermont Yankee Nuclear Power Corporation Ferry Road j Brattleboro, VT 05301 i

l 1

l l

4 l

i l

i I

?

i

)

1 1

i i

. .