Forwards Addl Info Re TS Change Request 96-11-2,revising TS Section 2.1, SL, to Change MCPR SL Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE for Plant Cycle 5
ML20133M132
Person / Time
Site: Limerick Constellation icon.png
Issue date: 01/15/1997
From: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9701220275
Download: ML20133M132 (5)


Text

__ _ _

, ~

I'

^ steuen support separtment 4 10CFR50.90 m

r PECO NUCLEAR- mco~c-  :

A Unit of PECO Energy . Np%Nf*" l i

January 15,1997

- Docket No. 50453 License No. NPF-85 ,

U.S. Nuclear Regulatory Commission

.. Attn: Document Control Desk Washington, DC 20555 -

P

Subject:

Limerick Generating Station, Unit 2 .

Technical Specifications Change Request No.96-112

. AdditionalInformation Gentlemen-

' Attached is additional information regardt.g the Technical Specifications (TS) Change Request .

4 No. 96-11-2 which was forwarded to b , . RC via PECO letter dated December 6,1996. This t proposed change wi'l revise TS Section 2.1, " Safety Umits," to change the Minimum Critical Power Ratio (MCPR) Safety Limit due to the use of GE13 fuel product line and the cycle-specific 1 analysis performed by General Electric Co. (GE), for Limerick Generating Station (LGS) Unit 2  :'

Cycle 5. Based on recent information provided by GE in Attachment 1, please substitute the reference to GE Technical Design Procedure ("GETA8 Safety Limit", TDP-0049, Revision 0, July

. 1996) with thu " Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A 3 i

4 (GESTAR ll) on Cycle Specific Safety Limit MCPR", which was submitted by GE to the NRC on P December 13,1996. Proposed Amendment 25 to GESTAR ll includes the relevant information provided in the Technical Design Procedure. This additional information is being submitted under affirmation, and the required affidavit is enclosed.

Attachment 1, Letter R. M. Butrovich (GE) to H. J. Diamond (PECO), " Limerick Unit 2 Cycle 5 )

Safety Limit MCPR ", dated January 13,1997 confirms this additional information. 1 If you have any questions, please do not hesitate to contact us. j

^

Very truly yours,

. -h Fwc

G. A. Hunger, Jr., I j
. Director f Licensing ,

Enclosure, Attachment '

cci H J. Miller, Administrator, Region I, USNRC (w/ enclosure, attachment) '

. N. S. Perry, USNRC Senior Resident inspector, LGS (w/ enclosure, attachment)

R. R. Janati, PA Bureau of Radiological Protection (w/ enclosure, attachment) ,

e i91 w _

- 9701220275 970115 /

l 6 POR:.ADOCK'05000353 P- 'POR [ '

r-

9 COMMONWEALTH OF PENNSYLVANIA  :

ss.

COUNTY OF CHESTER D. B. Fetters, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Compan'f, the Applicant herein; that he has read the additional information related to the Application for Amendment of Facility Operating Ucense No. NPF-85 (Technical Specifications Change Request No.

96-11-2), to change the Minimum Critical Power Ratio (MCPR) Safety Limit due to the use of GE13 fuel product line and the cycle-specific analysis performed by General Electric Co. for Limerick Generating Station, Unit 2 Cycle 5, and knows the contents thereof; and that the statements and matters set forth are true and correct to the best of his knowledge, information a lief.

h. y .k_1 -

v- - J Vice President 1

l Subscribed and sworn to

-4L-before me this /6 day of W 1997.

L c N ;;uig , 1 g r

~

-i= ~

i

.- \

l l

l 1

5 ATTACHMENT 1 LIMERICK GENERATING STATION UNIT 2 DOCKET NO. 50-353 LICENSE NO. NPF-85 TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 96-11-2 (ADDITIONAL INFORMATION)

Letter, R. M. Butrovich (GE) to H. J. Diamond (PECO Energy),

" Limerick Unit 2 Cycle 5 Safety Limit  ;

MCPR ," dated January 13,1997

~ ._ - _ _ __ __ . . . . - _ . _ - ._ _ _ _ . _

((

.. \.'

GENuclearEnergy

__ _. - _ _ i. _ j

. Richard M. Butrovoch ..ctear i.- AmertA

  • s hea .'snager Jenerar icc Camoey lastle Hwe Road 0 Bo< ::2. M C A33

,idmme;rcn NC 285)! Ci&&

70675 U56

.alComm i'292-6266 January 13,1997  :, gro675ase RMB:97-005 Mr. H. J. Diamond, Director Fuel & Services Division PECO NUCLEAR 965 Chesterbrook Boulevard

. Wayne, PA 19087-5691

SUBJECT:

Limerick Unit 2 Cycle 5 Safety Limit MCPR

REFERENCE:

1. Letter, R. M. Butrovich to H. J. Diamond, Limerick Unit 2 Cycle 5 Safety Limit MCPR, November 11,1996.
2. Letter R. J. Reda(GE) to T. E. Collins (NRC), Proposed Amendment 25 to GE Licensing Topical Report NEDE-24011-P-A(GESTAR 11) on Cycle Specific Safety Limit MCPR, December 13,1996

Dear Hugh:

Reference 1 provided PECO Nuclear with the cycle specific SLMCPR for Limerick Unit 2 Cycle 5 and referenced an internal GE technical design procedure. By Reference 2, GE has forwarded to the NRC Proposed Amendment 25 to GESTAR II which includes the relevant information provided in the technical design procedure. Therefore, in your Technical Specification Change Request concerning the Limerick 2 Cycle 5 Safety Limit MCPR, please substitute the proposed Amendment 25 for the reference to the technical design procedure.

Ifyou have any questions, please give me a call.

Very truly urs, t

R. . Butrovich el Project Manager

w. .-