ML20128H403

From kanterella
Jump to navigation Jump to search
Advises That Rev 23 to Util QA Program Submitted w/921021 Ltr Considered Acceptable
ML20128H403
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/08/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pelletier J
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 9302170030
Download: ML20128H403 (3)


Text

MS FEB 2 1993 Docket No. 50-271 License No. DPR-28 Mr. 3.mes P. Pelletier, Acting Senior Vice President, Operations Vermont Yankee Nuclear Power Corporation RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301

Dear Mr. Murphy:

SUBJECT:

16 CFR 50.54 QUALITY ASSURANCE PROGRAM CHANGE REVIEW

References:

Letter dated October 21,1992, from Mr. C. R. Clark to the U. S. Nuclear Regulatory Commission transmitting Revision 23 to the Yankee Atomic Electric Company Operational Quality Assurance Program (YOQAP-1-A)

We received your 10 CFR 50.54(a) submittal referenced above, transmitting Revision 23 to the Quality Assurance Program for Vermont Yankee. The Region I staff has reviewed this submittal in accordance with 10 CFR 50.54(a) and determined that the changes to the Quality Assurance Program are acceptable in that the Quality Assurance Program coatinues to satisfy the criteria of Appendix B of 10 CFR Part 50. If there are changes to other operative QA -

commitments existing in docketed correspondence outside of the QA program description, you are obligated to notify this office. Imp:ementing such changes should be based on 10 CFR 50.54(a)(3). The effectiveness of your Quality Assurance Program and procedure implementation will continue to be the subject of routine regional inspections.

If you have any questions concerning the above, please contact Fred Bower at (215) 337-5328.

Sincerely,,

y (p w &gwr([~ /h' jLJwf1,d>2L,4J

( Lee H. Bettenhausen, Chief Operations Branch Division of Reactor Safety 9302170030 93020s~

PDR ADOCK=05000271 /'l P pyg , ,.

' [h

t 1

[

hIr. Warren P. hiutphy 2 fE.D E 1933 cc:

D. Reid, Plant hianager J. Thayer, Vice President, Yankee Atomic Electric Company L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

D. Tefft, Administrator, llureau of Radiological IIcalth, State of New llampshire Chief, Safety Unit, Of6cc of the Attorney General, Commonwealth of hiassachusetts R. Gad, Esquire G. Illsbec, Esquirt' R. Sedano, Vermont Department of Public Service T. kapone, hiassachusetts Executive Office of Public Safety Public Document Room (PDR)

12) cal Pubile Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector State of New Hampshire, SLO Designee State of Vermont, SLO Designee Commonwealth of hiassachusetts, SLO Designee OFFICIAL RECORD COPY G:VYQA1021 I

1 i

- h_ --m___--__ - -- -- . _u w. .

I

o Mr. Warren P. Murphy _ 3 FEB 21993 .

bec:  ;

Region 1 Docket Room (with concurrences)

DRS/EB SALP Coordinator

'J. IJnville, DRP E. Kelly, DRP II. Eichenholz, SRI Vermont Yankee (w/ concurrences ,

N. Perry, SRI - Yankee Rowe V. McCree, OEDO D. Dorman, NRR W. Butler, NRR L. Bettenhausen, DRS N. Blumberg, DRS F. Bower, DRS V. Curley, DRS DRS File (s)

$Y3

& R :DR3 RI:DR Bower /ms Blumberg -

RI:DRS[k Bettenhausen

.f_ byg

M/93 912/93 -]fp/J3 '

OFFICIAL RECORD COPY ' 0:VYQA1021 3 .. . .