Final Deficiency Rept Re Heat Numbers W/More than One Pipe Schedule.Initially Reported on 831213.Two Piping Spool Pieces Replaced W/Correct Schedule of Pipe.Exam of All Installations of Subj Heats Revised to Prevent Recurrences
ML20101N187
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/07/1984
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
KMLNRC-84-218, NUDOCS 8501030386
Download: ML20101N187 (1)


Text

,

KANSAS GAS AND ELECTRIC COMPANY THE ELECTAC COMPANY

@LENN L sL O E S T E R Tsca Passacsw? mucLeam December 7, 1984 Mr. R.P. Denise, Director Wolf Creek Task Force -

U.S. Nuclear Regulatory Commission ,

&J Region IV I 611 Ryan Plaza Dr.ve, Suite 1000 FT P Q [c p Arlington, Texas 76011 i KMLNRC 84-218 L_

Re: Docket No. STN 50-482 ~

Ref: Interim Report KMLNRC 64-005 dated 01/12/84 -C from GLKoester, KG&E, to JEGagliardo, NRC Subj: Final 10CFR50.55(e) Report - Heat Numbers With More Than One Pipe Schedule (53564-K116)

Dear Mr. Denise:

This letter provides the final report submitted pursuant to 10CFR50.55(e) concerning heat numbers with more than one pipe schedule identified at Wolf Creek Generating Station (WCG3) . This matter was initially reported on December 13, 1983 with supplemental information provided in tha Reference.

As described in the Reference, there were two instances identified in which piping spool pieces of the proper line size but incorrect schedule were installed in piping systems at WCGS. These two piping spool pieces have been replaced with the correct schedule of pipe.

In addition, all actions taken as a result of Correction Action Report (CAR l-P-0032) have now been completed. These actions included reviews of the heat code cross reference, ultrasonic examination of all installations of the subject heats, as well as personnel training and procedure revisions to prevent any recurrences. No further instances of installed piping spool pieces with the correct heat code and incorrect pipe schedule were identified.

If you have any questions concerning this matter, please contact me or Mr. Otto Maynard of my staff.

Yours very truly, GLK:bb /

xc:RCDeYoung PO'Connor (2)

HBundY 8501030386 841207 PDR ADOCK 0S000482 17 C~y j S PDR 0

201 N. Market - WicNta, Kansas - Man Address: PO. Box 206 i WicNta, Kansas 67201 - Telephone: Area Code (316) 261-6451

!