Requests Addl 60 Days to Respond to Request for Addl Info Re Topical Rept 093, TMI-1 20th Yr Reactor Bldg Tendon Surveillance Test
ML20093C819
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/26/1995
From: James Knubel
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C311-95-2395, NUDOCS 9510130034
Download: ML20093C819 (1)


Text

- . _ _ _ - - _ _ _ _ _ . _ _

GPU Nuclear Corporation Qg g Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0480 (717) 944 7621 Writer's Direct Dial Number: l (717) 948-8005 September 26, 1995 C311-95-2395 1

U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR 50 1 Docket No. 50-289 l GPU Nuclear Schedule for Responsing to NRC Request for l Additional Information Regarding Topical Report No. 093, TMI-1 20" Year Reactor Building Tendon Surveillance Test 1

In a letter dated August 31, 1995 the NRC requested additional information within 30 days regarding the GPU Nuclear Topical Report (TR) No. 093, entitled "Three Mile Island Unit 1 Reactor Building Twenty Year Tendon Surveillance ,

(Inspection Period 6)," which was submitted on April 7, 1995. l Because some of the information that will be needed to prepare our response .

must be supplied by the architect engineer, additional time will be needed. l Based upon the contractor's schedule for providing input, GPU Nuclear is requesting an additional 60 days. Our response will then be due to the NRC on l November 29, 1995.

Sincerely /, '

J. Knubel Vice President and Director, TMI MRK cc: Region I Administrator TMI-l Senior Project Manager TMI Senior Resident Inspector 18002G 9510130034 950926 DR ADOCK0500g9 t 0