Requests Addl 60 Days to Respond to Request for Addl Info Re Topical Rept 093, TMI-1 20th Yr Reactor Bldg Tendon Surveillance Test
ML20093C819
Person / Time
Site: Crane Constellation icon.png
Issue date: 09/26/1995
From: James Knubel
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C311-95-2395, NUDOCS 9510130034
Download: ML20093C819 (1)


Text

-

GPU Nuclear Corporation Qg g

Route 441 South P.O. Box 480 Middletown, Pennsylvania 17057-0480 (717) 944 7621 Writer's Direct Dial Number:

(717) 948-8005 September 26, 1995 C311-95-2395 U. S. Nuclear Regulatory Commission Att: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 (TMI-1)

Operating License No. DPR 50 Docket No. 50-289 GPU Nuclear Schedule for Responsing to NRC Request for Additional Information Regarding Topical Report No. 093, TMI-1 20" Year Reactor Building Tendon Surveillance Test In a letter dated August 31, 1995 the NRC requested additional information within 30 days regarding the GPU Nuclear Topical Report (TR) No. 093, entitled "Three Mile Island Unit 1 Reactor Building Twenty Year Tendon Surveillance (Inspection Period 6)," which was submitted on April 7, 1995.

Because some of the information that will be needed to prepare our response must be supplied by the architect engineer, additional time will be needed.

Based upon the contractor's schedule for providing input, GPU Nuclear is requesting an additional 60 days.

Our response will then be due to the NRC on l

November 29, 1995.

Sincerely /,

J. Knubel Vice President and Director, TMI MRK cc:

Region I Administrator TMI-l Senior Project Manager TMI Senior Resident Inspector 18002G 9510130034 950926 DR ADOCK0500g9 0