OPERATING DATA REPORT DOCKET NO. 50-269 DATE 07-13-84 CO31PLETED BY J.A. Reavis TELEPilONE 704-373-7567 OPERATING STATUS OC *** 1 ***
- 1. Uni! Name:
- 2. Reporting Period: June 1,1984 - June 30,1984 Year-to-date and cumulative 2568 capacity factors are calcu-
- 3. Licensed Thermal Power (51Wt):
934 lated using a weighted
- 4. Nameplate Rating (Gross 5tWe):
886 average for maximum
- 5. Design Electrical Rating (Net SIWE):
dependable capacity.
- 6. Staximum Dependable Capacity (Gross 51We): 899
- 7. Sfaximum Dependable Capacity (Net $1We): 860
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons-None
- 9. Power 1.evel To Which Restricted,If Any (Net 31We): Non r*
- 10. Reasons For Restrictions,if Any:
This .\lonth Yr to.Date Cumulative
- 11. Hours in Reporting Period 720.0 4 367.0 96 072.0
- 12. Number Of Hours Reactor Was Critical 720.0 4 342.1 68 882.7
- 13. Reactor Reserve Shutdown Hours - -
- 14. Hours Generator On.Line 720.0 4 334.1 65 723.4
- 15. Unit Reserve Shutdown Hours - -
- 16. Gross Thermal Energy Generated (SIWH) 1 848 945 11 089 545 157 387 577
- 17. Gross Electrical Fnergy Generated (i!Wil) 646 450 3 893 740 54 761 970
- 18. Net Electrical Energy Generated (31WII) 617 887 3 726 293 51 891 844
- 19. Unit Service Factor 100.0 99.3 68.4
- 20. Unit Availability Factor 100.0 99.3 68.4
- 21. Unit Capacity Factor (Using .\lDC Net) 99.8 99.2 62.7
- 22. Unit Capacity Factor (Using DER Net) 96.9 96.3 61.0
- 23. Unit Forced Outage Rate 0.0 0.8 16.6
- 24. Shutdowns Scheduled Over Next 6 31onths (Type, Date, and Duration of Each1:
Refueling - October 21, 1984 - 7 Weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIA L ELECTRICITY CONI.\lERCIAL OPERATION 8407190149 840630 PDR ADOCK 05000269 (of77)
R' PDR I.E 2A
~
AVERAGE DAILY UNIT POWER LEMEL DOCKET NO. 50-269 UNIT Oconee 1 DATE 07-13-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567
-MONTH June-1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net). (MWe-Ne t)
, 1
~863 17 861 2 863 18 862 3 864 19 861 i-4 864 20 861 5 839 21 861 6 839 '22 861 7 862 23 861 8 863 24 861 9 863 25 860 10 863 26 860 11 861 27 860 f ' 12 862 28 860
! 13 862 29 860 14 862 30 860 15 829 31 -
i 16 838 INSTRUCTIONS :
10n this format, list theLaverage daily unit power level:In MWa-Net for eachl day In the reporting month. Compute to the nearest whole me.gawatt.
9 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-269 ~
UNIT NAME- Oconee 1 DATE 7/ 13/84 REPORT MONTH June, 1984 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 my l B
c 't; oi g License y Cause & Corrective 37 "c v52 *
- No. .Date ~. %!; g ,g g c Event jic, g Action to o z o Report # $' bb Prevent Recurrence 10-p 84-06-05 F- --
A -
HH PINPXX Secure Heater Drain Punp 11-p 84-06-15 S --
B -
CC VALVEX Turbine F. Control Valve and Control Rod lirive PT's 1 2 3 4 Reason: Method: Exhibit G - Instructions
-[ 1ed A-Equipment Failure (Explain)
B-Maintenance or Test 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161)
E-Operator Training 4 License Examination F-Adninistrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)
(Q/77)
. 6 DOCKET No: 50-269 UNIT: Oconee 1 DATE: 7/ 13/84 s
NARRATIVE
SUMMARY
Month: .hmn 1984-The unit ran at 100% throughout most of the month with no major prob 1 cms.
Turbine ano control valve and Control Rod Drive Pf's were perfonned on June 8.
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 1 ,
- 2. Scheduled next refueling shutdown: October 1984 ,
- 3. Scheduled restart following refueling: December 1984 .
- 4. ' Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes .
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A ,
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
177
- 7. Number of fuel assemblies (a) in the core: ,
(b) in the spent fuel pool: 1210 ,
- 8. Present licensed fuel pool capacity: 1312* .
Size of requested or planned increase: .
i 9. Projected date of last refueling which can be accommodated by present licensed capacity: Aunust 1991 .
1 Date: July.13, 1984 ,
DUKE POWER COMPANY
! Name of
Contact:
J. A. Reavis Phone: 704-373-7567 f
- Represents the combined total for Units 1 and 2.
l l
~
I OPERATING DATA REPORT DOCKET NO. 50-270 DATE 07-13-8T COMPLETED BY J.A. Reavis TELEPilONE 704-373-7567 OPERATING STATUS Oconee 2 NM*5
- 1. Unit Name:
'2. Reporting Period: June 1, 1984 - June 30, 1984 Year-to-date and cumulative
- 3. Licensed Thermal Power (MWt): 2sM capacity factors are calcu-
- 4. Nameplate Rating (Gross MWe): 934 lated using a weighted
- 5. Design Electrical Rating (Net MWe): 886 average for maximum
- 6. Maximum Dependable Capacity (Gross MWe):
899 dependable capacity.
860
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 71 Since Last Report. Give Reasons:
None
- 9. Power Level To Which Restricted,if Any (Net MWe): None
- 10. Reasons For Restrictions,if Any:
This Month Yr. to Date Cumulative I1. Hours in Reporting Period 720.0 4 367.0 85-992.0
- 12. Number Of Hours Reactor Was Critical 720.0 4 367.0- 61 680.5
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 7?n o 4 367.0 60 527.2
, 15. Unit Reserve Shutdown Hours - - -
I
~
- 16. Gross Thirmal Energy Generated (MWH) 1 R42 R72 11 205 4'10 143 696 106
- 17. Gross Electrical Energy Generated (MWH)' 633 090 3 862 420 48 967 276
- 18. Net Electrical Energy Generated (MWH) _
606 553 3 705 705 46 517 274
. 19. Unit Service Factor 100.0 100.0 70.4 l 20. Unit Availability Factor 100.0 100.0 70.4
- 21. Unit Capacity Factor (Using MDC Net)- 98.0 98.7 62.7
- 22. Unit Capacity Factor (Using DER Net) . 95.1 95.8 61.1
! 23. Unit Forced Outage' Rate 0.0 -
0.0 15.5-l 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t:
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achiesed 3
l : INITIAL CRITICALITY INITIAL ELECTRICITY -
CO.\l%IERCIAL OPERATION L f e
(9/77) i l
I
-. _ - _ . _ ~. . __ _ _
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-270 UNIT Oconee 2 DATE 07-13-84 COMPLETED BY J.A. Reavis TELEPHONE 704-373-7567 MONTH June 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne t) (HWe-Ne t) 1 846 17 843 2 847 18 842 3 J46 19 843 4 845 20 843 5 843 21 843 6 848 22 844 7 847 23 842 8 821 24 842 9 841
_ 25 841 10 846 26 gat 11 845 27 841 12 844 28 841 13 844 29 836 14 843 30 941 15 842 31 -
16 843 INSTRUCTIONS On this format, list the average dally unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWS AND POWER REDUCTIONS DOCKET NO. 50-270 ..
UNIT NAME Oconee 2
- DATE 7/.1V84 REPORT MONTH June'1984 COMPLETED BY J. A. Reavis
_ TELEPHONE 704-373-7567-
"s.
o
. e tj License y cause & Corrective 37 "eo , cg = e "e
No. Date- ~. 1h 3g Event ,Be,' g Action to
$ 'a5 E E ce -
- Eb Emo Report i G
mu 8$
uu Prevent Recurrence
'7-p 84-06-08 S. --
B -
CC VALVEX Turbine Stop and Control Valve PT's s
I 4
i i
l 1 2 3 4 Reason: Method: Exhibit G - Instructions
[N g A-Equipment Failure (Explain) .
B-Maintenance or Test 1-Manual 2-Manual Scram for Preparation of Data Entry Sheets for Licensee
, C-Refueling 3-Automatic Scran Event Report (LER)
D-Regulatory Restriction- 4-Other (Explain) File (NLREG-0161)
- E-Operator Training 6 License Examination F-Administrative .
5 G-Operational Error (Explain)- Exhibit I - Same Source
-H-Other (Explain)
- (9/77) -
a DOCKET NO: 50-270 UNIT: Oconee 2 DATE: 7/13/84 F
NARRATIVE
SUMMARY
Month: Jimo 1984 I
The unit ran at 100% throughout most of the month with no major =
2 probicms. Turbine Stop and Control Valve FT's were perfomed on June 15.
1, 1
1 2
1 l
k 4
1
(
'i .. I II ,
d e , . . - . - , e
. 1 MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 2 ,
March 1985
- 2. ' Scheduled next refueling shutdown: ,
- 3. -Scheduled restart following refueling: May 1985 ,
- 4. Will refueling or resumption of operation thereaf ter require a technical specification. change or other license amendment? Yes .
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .
- 5. Scheduled date(s)/Afor submitting proposed licensing action and supporting information: N ,
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
177
- 7. ' Number of fuel assemblies (a) in the core: .
(b) in the spent fuel pool: 1210 .
- 8. Present licensed fuel pool capacity: 1312* .
Size of requested or planned increase: .
- 9. . Projected date of last refueling which can be accommodated by present-licensed capacity: August 1991 .
DUKE POWER COMPANY Date: July 13, 1984 .
[ 'Name of
Contact:
J. A. Reavis Phone: 704-373-7567
- Represents the combined total for Units 1 and 2.
u.
s OPERATING DATA REPORT DOCKET NO. 50-287 DATE 07-13-84 CO31PLETED BY J.A- Reavis TELEPilONE 704-373-7567 OPERATING STATUS -
oc nee 3 Notes
- 1. Unit Name:
- 2. Reporting Period: June 1. 1984 - June 30, 1984 Year-to-date and cunulative
- 3. Licensed Thermal Power (51Wr): 2568 capacity factors are calcu-
- 4. Nameplate Rating (Gross 31We): 934 lated using a weighted
- 5. Design Electrical Rating (Net alWe): 886 average for maximum
- 6. Staximum Dependable Capacity (Gross alWe):
ggg dependable capacity.
- 7. Sfaximum Dependable Capacity (Net 31We): 860
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
None
- 9. Power Level To which Restricted.lf Any (Net alWe):
. 10. Reasons For Restrictions. If Any:
This Stonth Yr.-to Date Cumulative i1. Hours In Reporting Period 720.0 4 367.0 83 639.0
- 12. Number Of flours Reactor Was Critical 696.7 2 463.8 59 173.7
- 13. Reactor Reserve Shutdown Hours - -
- 14. Hours Generator On Line 687.2 2 427.9 58 010.5
- 15. Unit Reserve Shutdown Hours - - -
- 16. Gross Thermal Energy Generated (AlWH) 1 719 167 5 936 327 141 428 891
- 17. Gross Electrical Energy Generated (SIWH) 594 170 2 054 190 48 868 784
- 18. Net Electrical Energy Generated (SIWH) 567 948 1 956 804 46 523 922
- 19. Unit Service Factor 95.4 55.6 69.4
- 20. Unit Availability Factor 95.4 55.6 69.4
, 21. Unit Capacity Factor (Using alDC Net) 91.7 52.I 64.5
- 22. Unit Capacity Factor IUsing DER Net) 89.0 50.6 62.8
- 23. Unit Forced Outage Rate 4.6 1.5 14.7
- 24. Shutdowns Scheduled Over Next 6 StonthsIType.Date.and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY Coil 3tERCIAL OPER ATION (0/77)
y -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-287 i.
UNIT Oconee 3 DATE 07-13-84 l.
1 COMPLETED BY J.A. Reavis-TELEPHONE 704-373-7567 MONTH June 1984
! DAY ~ AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
!. (MWe-Net) (MWe-Ne t)
I 699 l 17 857 i
- j. 2 697 18 856 l
3 742 19 857 4 844 20 855 5 859 21 856 6 711 22 856 7 438 - 23 856 8 -
24 856 9 724 25 856 10- 859 26 856
'11 859 27 855 12 859 28 855 13 854 29 855 14 857 30 855
- 15. 858 31
~
16 857 INSTRUCTIONS.
'On this format, list the average dally unit power level in MWe-Net for 'each day In the reporting month.. Compute to the nearest whole megawatt.
L .
t t -
e
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-287 .
UNIT NAME -Oconee 3 DATE 7/ 13/84 REPORT MONTH June 1984 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567
%o e o o,$ License y Cause & Corrective 32 "co a5E " *
-No. Date ~
o %h yg Event ,5'e, g . Action to S Report # hb $b Prevent Recurrence 6-p 84-06-01 F --
A -
IHi PLNPXX Repair Mechanical Seals on Heater Drain Pmp 7-p 84-06-03 F --
B -
IB INSTRU Excore Instrment Calibration 8-p _84-06-06 F --
A -
HA INSTRU Stator Coolant Control System Runback 3 84-06-07 F 8.20 A 3 HA INSTRU Stator Coolant Control System Runback 4 84-06-07 F 24.62 A 3 IA INSTRU Reactor Anticipatory Trip 9-p 84-06-09 F --
A -
191 1URBIN Problem Resetting Feedwater P m p Turbine l
. 1 I
1 2 3 4 Reason: Method: Exhibit G - Instructions
[ g A-Equipment Failure (Explain)
B-Maintenance or Test 1-Manual 2-Manual Scram for Preparation of Data Entry Sheets for Licensee C-Refueling 3-Autmatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain) File (NLREG-0161)
E-Operator Training G License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other.(Explain)
(D/771
r ,
DOCKET NO: 50-287
, UNIT: Oconee 3
~
DATE: 7/13/84 NARRATIVE
SUMMARY
. Month: June, 1984 The unit ran at 100% throughout most of the month with no major problems. The unit experienced a Stator Coolant Control System runback / trip due to a power supply breaker trip on June 7. A faulty low oil pressure signal on the main feedwater pump also caused a trip on June 7.
t L:
{ .
MONTHLY REFUELING INFORMATION REQUEST
- 1. Facility name: Oconee Unit 3 ,
- 2. Scheduled next-refueling shutdown: September 1985 ,
November 1985
- 3. Scheduled restart following refueling: ,
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .
If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety 1teview Committee regarding unreviewed safety questions? N/A ,
- 5. Scheduled date(s)/Afor submitting proposed licensing action and supporting N
information: ,
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of fuel assemblies (a) in the core: 177 (b) in the spent fuel pool: 75 .
- 8. Present licensed fuel pool capacity: 825 .
Size of requested or planned increase .
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: August 1991 ,
DUKE POWER COMPANY Date: July 13, 1984 .
i l Name of
Contact:
J. A. Reavis Phone: 704-373-7567
e :
OCONEE NUCLEAR STATION Monthly Operating Status Report
-1. ! Personnel Exposure i-For the month of May, 2 individuals exceeded 10 percent of their allowable annual radiation dose limit with the highest. dose being 1.420 rem, which I
represents approximately 11.8% of that person's allowable annual limit.
l 2. The total station liquid release for May has been compared with the
! Technical Specifications annual value of 15 curies; the total release l for May was less than 10 percent of this limit.
! The total station gaseous release for May has been compared with the
! derived Technical Specifications annual value of 15,000 curies; the total
. release for May was less than 10 percent of this limit.
I i
i i
l l
_ . _ . . . . . m _ . _ _
a DUKE POWER GOMPANY P.O. nox 33189 OMAmLOTTE, N.C. 28948 HALH. TUCKER ren.myssows
,,,,'"*,,"_""*",',, July 13, 1984 (*) "
Director-Office of' Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: . Document Control Desk e
Re Oconee Nuclear Station Docket Nos. 50-269, -270. -287 4
l Dear Sir Please find attached information concerning the performance and operating
! status of the Oconee Nuclear Station for the month of June 1984.
l-
! Very truly yours, 1
. JAC Hal B. Tacker 1
JAR:scs Attachments i
cc: Regional Administrator- American Nuclear Insurers U. S. Nuclear Regulatory Commission c/o Dottie Sherman, ANI Library Region II The Exchange, Suite 245
' 101 Marietta Street, NW, Suite 2900: 270 Farmington Avenue i
Atlanta,' Georgia 30323 Farmington, Connecticut 06032
! . Mr. Phil Ross Ms. Helen Nicolaras. Project Manager
- U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation
, MNBB-5715 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 ~ Washington, D..C. 20555 Senior Resident Inspector INPO Records Center Oconee Nuclear Station -Suite'1500- ,
1100 circle 75 Parkway M&M Nuclear Consultants Atlanta, Georgia 30339 1221 Avenue of'the Americas .
{]hh
' \
m . ,. -
. . . . -