OPERATING DATA REPORT DOCKET NO. 50-269 DATE 12-15-u COMPLETED BY J. A. Reavis TELEPHONE 7nA 171- 7567 OPERATING STATUS .

Oconee #1 Notes I

1. Unit Name:
2. Reporting Period: November 1,1982-November 30. 1982 Year-to-date and cununulative 2568 capacity factors are calcu-
3. Licensed Thermal Power ()(Wt): laced using a. weighted
4. Nameplate Rating (Gross MWe): 934 g
5. Design Electrical Rating (Net MWe): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 = ,

S. If Changes Cccur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions. If Any:

nis Month Yr.-to.Date Cume' .e

11. Hours in Reporting Period 0.0 8 016.0 82 201.0
12. Number Of Hours Reactor was Critical 720.0 5 867.7 56 923.0
13. Reactor Reserve Shutdown Hours -- -- --
14. Hours Generator On.Line 720.0 5 595.8 53 839.0
15. Unit Reserve Shutdown Hours -- -- --
16. Gross Thermal Energy Generated (MWH) 1 850 062 13 760 528 127 218 300 .

17 Gross Electrical Energy Generated (MWH) 645 620 , , ,

4 774 360 44 250 710

18. Net Electrical Energy Generated (MWH) 617 492 4 514 All 41 859 007
19. Unit Service Factor 100.0 69.8 65.5
20. Unic Availability Factor 100.0 69.8 65.5
21. Unit Capacity Factor iUsing MDC Net 99.7 65.6 59.0
22. Unit Capacity FactoriUsing DER Net) 96.8 63.6 57.5
23. Unit Forced Outage Rate 0.0 28.4 19.4
24. Shutdowns Scheduled Over Next 6 Months iType. Date, and Duration of Eachi:

None

25. If Shut Down At End Of Report Period. Estimated Date of ',:artup:
26. Units in Test Status iPrior to Commercial Operationi: Forecast Achieved l

l INITIA L CRITICALITY

! INITIA L ELECTRICITY .

COMMERCIAL OPER A TlON 8212210428 821215 PDR ADOCK 05000269 '

Y"-,

R PDR '

DOCKET NO. 50-269 UNIT Oconee t DATE 12-15-82 AVERAGE DAILY UNIT POWER LEVEL MOhTH November,1982 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe net) DAY (MWe net) ,

798 862 1

37 845 18 862 2

855 863 3 39 853 20 863 4

849 21 863 5

857 22 862 +

6 R60 23 R63 7

859 24 863 8

860 865 g 25 8'52 26 864 10 8 58 27 864 11 860 28 864 12 861 29 863 13 861 30 862 14 15 861 31 15 862 DAILY UNrr POWER LL VEL FOR\1 INSTRUCTIONS  ;

On this fonn, hst the averare d.nly urut power lesel in M'.Ve net ici cach day in the reporting n.onth. i Compute to the nearest wnole megawatt.

These Ogures will i e used to plot a graph ter each reportmt; month. Note that by usini! maximum l dependable capacity f or the net electrical ratin: of the umt theri; may be m eauons when the daily average power leve eutetts the 100.' hoe f or the restritted power lesel hoe) In such e.c.es, the l average daily umt power output sheet should be footnoted to t s plam the app.uent anomaly.

I

M H

b Q

> Lo .y.:

t1 5 -

r- N 4 8 CC CE M /*

@ W G N b

~

LD W I.f1

  • M

,gD E'J C 1' g

'N C m 4 I o 0 O 8 4 n u o U N '

O C O .? w, in o - 9 m o u y  :..J m y y . e e.=

'O = *

"e =. Q auer

=

c*W W>W u - d.d . - .3 .$ w O v:

5 g ec < < c- o *,- . = =

. * ---nu: .

pZ - , : =- ;ss o z _2 .- -

W W. w .= ~,

.y :-m x -

'M,b- w W

+g-u J - S"h5C - -

S OZ 4, U  %*$ ~

O cD c., 4

.p 3

n u .5 w:w--o . n .?', - ..;

f Q E" C -

'J 'T V*

M .

Z N =

O co ,E; n m c.apO3 = u Q P" n f.h .:;

p , tUabodluGJ , g ,9 g O s. MqW W W . . :; g = ~

% -Q ~2 3 0 C:

s -

=

=

-s

=, =3 = U -

W W

> .,3PoJ -- -

3 o tuaisis $ $ $ 3,5 o

z *

. .e =- . W es=,

Z > C1

.q: Z -

ac m o

  • A y ~~p 25 3

Z 4 d: - o

o_ ..d. u*. u - =

- C. 3  % 4 .=~

Y "*

to D ~

4 =

s =

M m =

h .lOj.'fdh II.MOQ ,~

Z .iut tin gs "  :

D .= -

50 P NI M '

s i:

x .- . u 4  : M wa Z *C u .w u .g

. tlOs C.18 j s

3F F d.s

-- s U= 0

  • m
  • s,, es --

nO uC u " .=

b y M '5 t'1

. ~-.d "

(sJno}l) = 2. .A -X F n 2v::.

~~. un u ~e..

unticinG - =: .: n r:* * -

= C..u. = "5

c = w; u 3 -3..- =u

. a2-n uv ._ .- -A u ,.~.

  • / .=

n-t ad (1 u . 2 -e -::-O. .c-O- -O

, I  %<=vCaso:

i l

i P$

i A

l  :

2 2 =

u .,

y

.'d.

.d -*)

b M -

~

e

  • /* U '/", , N e.se h w

4 MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 1 ,
2. Scheduled next refueling shutdown: September 1983 .
3. Scheduled restart following refueling: November 1983 .
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes .

If yes, what will these be? Technical Specification Kevision j

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performatice analysis methods, significant changes in design or new operating procedures).

i

7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 785 .

! 8. Present licensed fuel pool capacity: 1312* .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

December 15, 1982 DUKE POWER COMPANY Date: ,

I i

! Name of

Contact:

J. A. Reavis Phone: 704-373-7567 '

[

( i f

I l

l I

l

.-.___,._L

. DOCKET NO: 50-269 UNIT: Oconee 1 DATE: 12-15-82 NARRATIVE SIDMARY Month: November,1982 Oconee Unit 1 entered the month holding at 86% power to assist in meeting the ~

system minimum load. Power was increased to 100% on the first with no major problems.

November 10 the unit began reducing load due to a question involving the opera-bility of steam generator drain line snubbers. The issue was cleared up within an hour and did not seriously impact the unit's generation.

Oconee Unit 1 operated the remainder of the month at near full power.

2 4

e k

l .

4 l

k

._ . - . . , - - - . . - - . , - , . .,n,,..,,,.-,_..-. . ,.._ , ., - ~ - _ _ - __ _ ,.--.,,--.,,, -.- ~ , _ ,-

. \

1 l

9 OPERATING DATA REPORT DOCKET NO. 50-270 DATE 12-15-82 COMPLETED BY J. A. Reavis TELEPHONE vnA 171- 7567 OPERATING STATUS

1. Unit Name: Oconee #2 Note $

. Reporting Period:

November 1, IS82-November 30, 1982 Year-to-date and cuuunulative 2568 capacity factors are calcu-

3. Licensed Thermal Power t}{Wt): lated using a weighted
4. Nameplate Rating (Gross MWes: 934 886 m,gm%
5. Design Electrical Rating (Net MWe). dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe): None
10. Reasons For Restrictior.s. If Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 720.0 8 016.0 ~7 2 121.0
12. Number Of Hours Reactor Was Critica] 709.5 3 963.8 50 172.3
13. Reactor Reserve Shutdown Hours -- -- --
14. Hours Generator On.Line 692.0 _ 3 847.0 49 075.4
15. Unit Reserve Shutdown Hours -- -- --
16. Gross Thermal Energy Generated (MWH) 1 767 804 8 758 111 114 792 923 -

17 Gross Electrical Energy Generated (MWH) 605 430 ,_. 2 992 100 __ 39 068 886

18. Set Electrical Energy Generated (MWH) 578 560 2 821 669 37 054 517
19. Unit Service Factor 96.1 48.0 68.1
20. Unic Availability Factor 96.1 48.0 68.1
21. Unit Capacity Factor IUsing MDC Net) 93.4 40.9 59.5
22. Unit Capacity Factor tU3ing DER Net) 90.7 39.7 58.0
23. Unic Forced Outage Rate 3.9 20.8 17.9
24. Shutdowns Scheduled Over Next 6 Months IType. Date.and Duration of Each i None
25. If Shut Down At End Of Report Period. Estimated Date of L:::rtup:
26. Units In Test Status a Pnor to Commercial Operation s: Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICIT(

COMMERCIA L OPER A TION pu ;

_ . - . . _ _. _,. . ___._.,_ _ _._.._.. _ __ ~__ _,_ _.,....~ _ _ ,__,_.___ __ ,

DOCKET NO. 50-270 UNIT Oconee 2 DATE 12-15-82 AVERAGE DAILY UNIT POWER LEVEL MONTH November, 1982 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe net) .

843 844 g 37 843 18 842 2

842 19 846 3

568 20 847 4

12 21 847 5

736 22 846 6

833 839 .

7 23 843 24 848 8

846 g 845 25 10 R4R 2G 840 844 27 847 11 844 28 848 12 844 846 13 29 843 30 847 14 ,

15 844 31 __.

1S 844 DAILY UNIT POWER LEVEL FOR\t INSTRtTTIONS On this fann. hst the averare daily tinit power lesel in MWe net for each day in the reporting n.onth.

Compute to the nearest w hole megawatt.

These figures will 1 e used to plot a graph f or caeh reporting month. Note that by using! maximum dependable capacity for the net electrical ratm; of the unit t hert: ma> be ..s eauons when the daily average power leve: euceds the 11101. hoe toe the restrhied power lesel ime). In such cases, the average daily unit power output sheet should be footnoted to tsplain the appasent anomaly.

~ " - '-- c - , . . - , _ , - , _ _ , _ _ , , _ _ _

UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-270 ,

UNIT NAME Oconee 2 DATE 12-15-82 COMPLF ED HY J

  • REPORT MONTil November,1982 _

i ":

L .! E 3g .5' Licensee $*t, 1 gg, Cause & Corrective No. Date g gg j gy Event a7+ Ag;nn in

$b N 5 l{cport # NU SU Prgyent [(egugggnge

< 83 3 g u O

10 82-11-04 F 27.97 A 3 CH INSTRU Reactor trip on high pressure due to defective vacuum switch on 2A FWPT.

i 5-p 82-11-06 F --

A --

CH PUMPXX Delay in reaching load due to repairs

to 2A condensate, booster pump packing.

i l

1 i . .

i ,,

4 1

h I

l I 2 3 4 F: Forced Reason: Metin>t!: Exhibit G. instructmns i S. Schetlutet! A Fquipment Failure (Explain) 1 -Manual for Prep.iration of Data Il4taintenance of Test 241anual Scram. Entry Sheets for I.ieensee C-Ilefueling 3. Automatic Scram. Event Report (LER) File int!ItEG.

D Regulaiory Rest iction 4 Other (Explain) 0101) l I:4)pe.ator Trainin;& License Examination

F.Administ rative -

5

! G-Opeiational la ror ( Explain ) Exlubit i .Same Somee *

(9/77) II Other (Explain) -

MONTHLY REFUELING INFORMATION REQUEST l

J

1. Facility name:

Oconee Unit 2 ,

2. Scheduled next refueling shutdown: December, 1983 ,

1

3. Scheduled restart following refueling: February, 1984 ,
4. Will refueling or resumption of operation thereafter require a technical

, specification change or other license amendment? Yes .

If yes, what will these be? b chnical Specification Revision

.m="

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

i

7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 785 .

8. Present licensed fuel pool capacity: 1312* .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER COMPANY Date: December 15, 1982 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

\

1 DOCKET NO: 50-270-UNIT: Oconee 2 DATE: 12-15-82 NARRATIVE

SUMMARY

Month: November, 1982 Oconee Unit 2 operated at 100% power until November 4 when the reactor tripped on high pressure caused by a defective vacuum switch on the 2A FWPT. The unit returned to service the following day.

The unit was delayed in reaching full load due to repairs to the 2A condensate booster pump packing.

Oconee Unit 2 reached full load Novettber 7 and remained near full power the remainder of the month.

1 4

i e

--r-r--www --+~-* -we--v&-'-pw m' -ve m e yv v+,rv. er .-ww- v- ww ww---*=erey*-~'e,e-y'r*"**"ww+*-"*-~W%*e*w*

r---e*r*-P"7-*'e'*"*N'*'-"=--T"*'t 9'T F'""

OPERATING DATA REPORT DOCKET NO. 50-287 DATE 12 a 2~

COMPLETED BY J. A. Reavis TELEPHONE 7'u '17h7567 OPERATING STATUS Oconee #3 N '*5

1. Unit Name:

November 1,1982-November 30, 1982 Year-to-date and cummulative

2. Reporting Period:

a 2568 capacity factors are calcu-

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 934 g
5. Design Electrical Rating (Net MWe): 886 dependable capacity.
6. Maximum Dependable Capacity (Gross MWe): 899
7. Maximum Dependable Capacity (Net MWe): 860 S. If Changes occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

None ne

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period 720.0 8 016.0 ~ 69 768.0
12. Number Of Hours Reactor Was Critical 408.8 2 588.2 47 902.1
13. Reactor Reserve Shutdown Hours --

, 14. Hours Generator On.Line 407.0 2 518.8 46 834.9

15. Unit Reserve Shutdown Hours -- --
16. Gross Thermal Energy Generated (MWH) 667 243 5 808 673 113 327 412 .

, 17 Gross Electrical Energy Generated (MWH) 230 040 ,,, 2 002 730 39 149 544

18. Net Electrical Energy Generated (MWH) 213 744 1 884 865 37 236 341
19. Unit Service Factor 56.5 31.4 67.1
20. Unit Availability Factor 56.5 31.4 67.1
21. Unit Capacity Factor IUsing MDC Nett 34.5 27.3 61.9
22. Unit Capacity FactorIUsing DER Net) 33.5 26.5 60.2
23. Unit Forced Outage Rate 43.5 38.7 16.7
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each :

None

25. If Shut Down At End Of Report Period. Estimated Date of '.,tartup: December 21, 1982
26. Units in Test Status IPrior to Commercial Operations: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERC.AL OPER A T!ON en- ;

DOCKET No. m ?R7 UNIT Oconee 3 DATE 12-15-82 AVERAGE DAILY UNIT POWER LEVEL MOhTH November.1982 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe net) ,

~

701 17 359 1

768 18 2

3 604 19 481 20 4 _-

5 506 21 --

6 609 22 7 sol 23 --

8 593 24 9 54 5 25 10 '494 26 --

11 494 27 12 495 28 494 29 13 14 432 30 404 31 15 1S 405 DAILY UNIT POWER LEVEL FOR\1 INSTRUCTIONS On this fonn, hst the averare d.tily usiit power lesel in M'Ne net for each day in the reporting n.onth. j Compute to the nearest wnole men awatt.

These figures will i e used to plot a graph f or each reportini; month Note that by using maumum

..s eauons when the daily dependable capseity f or ilie siet electrical ratin: of the unit there mas be average power leve* enmis the 1(10 L line f or the restritted power leul hnet in such c.ises, the average daily unit power output sheet should be footnoted to t splain the app.uent anomaly.

DOCKET NO. 50-287 UNITSilOTDOWNS AND POWER REDUCllONS Oconee 3 .-

UNIT NAM E DATE 12-15-82 COMPLETED BY J. A. Reavie REPORT MONTil N ovember,1982 704-373-7567 i TELEPilONE i f

l

]'  %

=_ re 'E u. ~ . E l ~;, 2c E - , .5 ~4 LiceH5ce C'

, r, r , Cause & Cutrective cy'd Na- Date i 5g i 2s& Eveni av- e. Auion i :

  • Report " 'E 0 y' 1 c3 ch j5g Prevent Recurrence c5 ,

I a

I l

6-p 82-11-02 F --

A -- CB HTEXCH Operating at reduced power levels due to steam generator tube leak. >

4 82-11-17 F 313.02 A 1 CB HTEXCH Unit shutdown to-repair steam generator tube leaks.

i 4

l l

1 1

i l l 2 1 4 F: Finced Reason: Me:Imd: . Exhibit G - Instructions j S. Sclieduled A-li:uipnient Failure (Explain) 1 Manual for Preparation of Data

H-Maintenance oi Test 2 Manual Scram. Entry Sheets for Licensec

! C Refueling 1- Autianatic Scram. Event Report (1.1:R) Fife (Nt! REG-i D Regulatory itestriction 4 Ottier(Explain) 0161) i  ! Ope.ator Training & Liceitse Eumination i

4 F Adnunistrative -

5 G-Opeiational Es tor (Explain) Esliibit !-Same Souice j (9/77) II-O:her ( Explain)

I 1

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: Oconee Unit 3 ,
2. Scheduled next refueling shutdown: May, 1984 ,
3. Scheduled restart following refueling: July, 1984 ,
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? Yes ,

If yes, what will these be? Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A ,

5.

Scheduled information:

date(s)/Afor N submitting proposed licensing action and supp~orting ,

6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 177 .

(b) in the spent fuel pool: 205 .

8. Present licensed fuel pool capacity: 474 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER COMPANY Date: December 15, 1982 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7567

DOCKET NO: 50-287 UNIT: Oconee 3 DATE: 12-15-82 NARRATIVE

SUMMARY

Month: November,1982 -

Oconee Unit 3 began the month holding at 75% power for system dispatch requirements.

November 2 the unit began a series of load reductions due to a steam generator tube leak. The unit was removed from service November 17 to repair the leaks. Oconee Unit 3 finished the month in the steam generator tube leak outage.

y _

W e

_----_._--.--,--A-----_- - - - - -

s F OCONEE NUCLEAR STATION Operating Status Report

1. Personnel Exposure. 1 l

For the month of October no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2. The total station liquid release for October has been compared with the Technical Specifications annual value of 15 curies; the total release for October was less than 10 percent of this limit.

The total station gaseous release for October has been compared with the derived Technical Specifications annual value of 51,000 curies; the total release for October was less than 10 percent of this limit.

t i

,