0CAN079019, Forwards Rev 12 to QA Manual Operations.W/O Encl

From kanterella
(Redirected from ML20055J118)
Jump to navigation Jump to search
Forwards Rev 12 to QA Manual Operations.W/O Encl
ML20055J118
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/23/1990
From: James D
ENTERGY OPERATIONS, INC.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
0CAN079019, CAN79019, NUDOCS 9008010092
Download: ML20055J118 (2)


Text

..

g..g w

= ent _ . .. ...,.n _

Operations

[gg n , ,,

SI@E :VI l

JL 2 5500 l July 23, 1990 l,_ p '

SCANp79019 U. S. Nuclear Regulatory Connission i Region IV 611 Ryan-Plaza Drive Suite 1000 Arlington, TX 76011 ATTN:- Mr. Robert D. Martin Regional Administrator

Subject:

Arkansas Nuclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 220  ;

License Nos. DPR-51 and NPF-6  ;

Quality Assurance Manual Operatio.is Rev.12  :

i

Dear Mr. Martin:

In accordance with 10CFR50.54(a)(3) and 10CFR50.71, attached e.:e your r controlled copies (Copy Nos. 8 & 9) of the Arkansas Nuclear One Quality Assurance Manual Operations, Revision 12.

Please indicate receipt of this revision by signing below and returning  ;

this transmittal letter to Ms. Sally Benson, Licensing Seciton, TCBYT-19, i P. O. Box 551, Little Rock, AR 72203.

erely, su r D le . James upe v sor, Licensing DEJ: B:fc Enclosures 'i Entergy Operations, Inc./Arkarsas Nuclear One Attn:- Ms. Sally Benson, Licensing Section Post Office Box 551. TCBYT-19 ,

Little Rock, AR 72203 ,

I have received and incorporated this copy of the Arkansas Nuclear One Quality Assurance Manual Operations into my controlled manual.

Signed Date Copy __

900s010092 900723-m gos aoock 5 ZE5h 9 9 mos

Mr. Robert Martin

.Page 2 July 23, 1990 l cc: NRC Senior Resident Inspector i l Arkansas Nuclear One - ANO-1 & 2 i l- Number 1, Nuclear Plant Road Russellville, AR 72801 Mr. Thomas W. Alexion NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Comis:; ion NRR Mail Stop 11-B-19 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 1 Mr. Chester Poslusny i NRR Project Manager, Region IV/ANO-2 l U. S. Nuclear Regulatory Comission i NRR Mail Stop 11-B-19  !

One White Flint North l 11555 Rockville Pike l Rockville, Maryland 20852 j i

l 1 l

l l

l l

\

1

-)

f I

]

S