MONTHYEARIR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 IR 05000445/20240012024-04-26026 April 2024 Integrated Inspection Report 05000445/2024001 and 05000446/2024001 IR 05000445/20244022024-04-17017 April 2024 Security Baseline Inspection Report 05000445/2024402 and 05000446/2024402 (Full Report) IR 05000445/20230062024-02-28028 February 2024 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 Reports 05000445/2023006 and 05000446/2023006 IR 05000445/20243012024-02-28028 February 2024 Notification of NRC Initial Operator Licensing Examination 05000445/2024301 and 05000446/2024301 IR 05000445/20230132024-01-31031 January 2024 License Renewal Inspection Report 05000445/2023013 and 05000446/2023013 IR 05000445/20230042024-01-29029 January 2024 Integrated Inspection Report 05000445/2023004 and 05000446/2023004 ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information IR 05000445/20234022023-11-30030 November 2023 NRC Security Inspection Report 05000445/2023402 and 05000446/2023402 IR 05000445/20230052023-08-23023 August 2023 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 IR 05000445/20233012023-08-21021 August 2023 NRC Examination Report 05000445/2023301 and 05000446/2023301 IR 05000445/20230112023-07-20020 July 2023 Fire Protection Team Inspection Report 05000445/2023011 and 05000446/2023011 IR 05000445/20230022023-07-14014 July 2023 Integrated Inspection Report 05000445/2023002 and 05000446/2023002 IR 05000445/20230012023-04-13013 April 2023 Integrated Inspection Report 05000445/2023001 and 05000446/2023001 IR 05000445/20234012023-03-29029 March 2023 NRC Security Inspection Report 050004452023401 and 050004462023401 (Cover Letter Only) IR 05000445/20230102023-03-24024 March 2023 Biennial Problem Identification and Resolution Inspection Report 05000445/2023010 and 05000446/2023010 IR 05000445/20220062023-03-0101 March 2023 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) IR 05000445/20220042023-01-26026 January 2023 Integrated Inspection Report 05000445/2022004 and 05000446/2022004 IR 05000445/20220102023-01-23023 January 2023 TI-194 Report 05000445/2022010 and 05000446/2022010 IR 05000445/20224012022-12-19019 December 2022 Cyber Security Inspection Report 05000445/2022401 and 05000446/2022401 (Cover Letter Only) IR 05000445/20224202022-12-0707 December 2022 Security Baseline Inspection Report Cover Letter 05000445/2022420 and 05000446/2022420 ML22319A0732022-11-15015 November 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report ML22299A0562022-11-0101 November 2022 Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation IR 05000445/20220032022-11-0101 November 2022 Integrated Inspection Report 05000445/2022003 and 05000446/2022003 and Notice of Violation IR 05000445/20220052022-08-22022 August 2022 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) IR 05000445/20224032022-08-0909 August 2022 NRC Security Inspection Report 05000445/2022403 and 05000446/2022403 (Full Report) IR 05000445/20220022022-08-0505 August 2022 2nd Quarter 2022 Integrated Inspection Report 05000445/2022002 and 05000446/2022002 ML22174A2792022-06-22022 June 2022 Notification of NRC Evaluations of Changes, Tests and Experiments Inspection (05000445/2022003 and 05000446/2022003) and Request for Information IR 05000445/20220012022-04-26026 April 2022 Integrated Inspection Report 05000445/2022001 and 05000446/2022001 IR 05000445/20224022022-04-25025 April 2022 Security Baseline Inspection Report 05000445/2022402 and 05000446/2022402 IR 05000445/20210062022-03-0202 March 2022 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) IR 05000445/20200112022-02-0707 February 2022 Amended - Comanche Peak Nuclear Power Plant - Triennial Fire Protection Inspection Report 05000445/2020011 and 05000446/2020011 and Notice of Violation IR 05000445/20210042022-01-25025 January 2022 Integrated Inspection Report 05000445/2021004 and 05000446/2021004 IR 05000445/20210122022-01-13013 January 2022 TI-194 Report 05000445/2021012 and 05000446/2021012 IR 05000445/20214052021-12-15015 December 2021 Security Baseline Inspection Report 05000445/2021405 and 05000446/2021405 IR 05000445/20214032021-12-0909 December 2021 Powerplant, Units 1 and 2 - Security Baseline Inspection Report 05000445/2021403 and 05000446/2021403 IR 05000445/20210032021-11-0303 November 2021 Integrated Inspection Report 05000445/2021003 and 05000446/2021003 IR 05000445/20213012021-10-19019 October 2021 NRC Examination Report 05000445/2021301 and 05000446/2021301 IR 05000445/20210102021-10-0707 October 2021 Biennial Problem Identification and Resolution Inspection Report 05000445/2021010 and 05000446/2021010 IR 05000445/20214012021-09-0909 September 2021 Security Baseline Inspection Report 05000445/2021401 and 05000446/2021401 IR 05000445/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) IR 05000445/20214022021-08-19019 August 2021 Security Baseline Inspection Report 05000445/2021402 and 05000446/2021402 IR 05000445/20210022021-08-10010 August 2021 Integrated Inspection Report 05000445/2021002 and 05000446/2021002 IR 05000445/20210012021-06-23023 June 2021 Revised Report - Comanche Peak Nuclear Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001; 05000446/2021001 and Independent Spent Fuel Storage Inspection 07200074/2021001 IR 05000445/20214042021-06-17017 June 2021 Material Control and Accounting Program (Public) Inspection Report 05000445/2021404 05000446/2021404 ML21131A0952021-05-11011 May 2021 CP2021001-RP-JE, Comanche Peak Nuclear Power Plant, Units 1 and 2 - Integrated Inspection Report 05000445/2021001 and 05000446/2021001 IR 05000445/20210112021-05-0606 May 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000445/2021011 and 05000446/2021011 and Notice of Violation 2024-07-31
[Table view] Category:Letter
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024 License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel ML24243A0152024-09-0303 September 2024 – Notification of Comprehensive Engineering Team Inspection (05000445/2025012 and 05000446/2025012) and Request for Information ML24232A2262024-08-19019 August 2024 Information Request, Security IR 2024404 ML24232A2412024-08-19019 August 2024 Information Request, ISFSI Security IR 2024401 CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule ML24177A2692024-08-0707 August 2024 Issuance of Amendment Nos. 188 and 188, Respectively, Revision to Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality IR 05000445/20240022024-07-31031 July 2024 Units 1 and 2 - Integrated Inspection Report 05000445/2024002 and 05000446/2024002,and Independent Spent Fuel Storage Installation Inspection Report 07200074/2024001 IR 05000445/20244032024-07-16016 July 2024 Security Baseline Inspection Report 05000445/2024403 and 05000446/2024403 (Full Report) ML24187A0372024-07-15015 July 2024 Withdrawal of Requested Licensing Action Exemption from Select Requirements of 10 CFR Part 55, Operators Licenses ML24192A1862024-07-10010 July 2024 Notification of Inspection (NRC Inspection Report 05000445/2024003 and 05000446/2024003) and Request for Information ML24185A1382024-07-0202 July 2024 Inservice Inspection Request for Information CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 IR 05000445/20244012024-06-26026 June 2024 MC&A Program Inspection Report 05000445-2024401 and 05000446-2024401 Public-Final CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 IR 05000445/20240122024-06-17017 June 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000445/2024012 and 05000446/2024012 ML24120A3632024-06-10010 June 2024 Issuance of Amendment Nos. 187 and 187, Respectively Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters ML24120A2942024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Gonzalez, B, Caddo Nation ML24120A2912024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cooper, D, Apache Tribe of Oklahoma ML24120A2902024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Bunch, J, United Keetoowah Band of Cherokee Indians ML24120A2932024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Garza, Jr, Juan, Kickapoo Traditional Tribe of Texas ML24120A2922024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Dotson, Delaware Nation ML24120A2952024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Johnson, L.J., Seminole Nation of Oklahoma ML24120A3042024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Sylestine, R, Alabama-Coushatta Tribe of Texas ML24120A3022024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Pierite, M, Tunica-Biloxi Tribe of Louisiana ML24107B1012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Cernek, J, Coushatta Tribe of Louisiana ML24120A3012024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Parton, T, Wichita and Affiliated Tribes ML24120A2972024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martin, R, Tonkawa Tribe of Oklahoma ML24120A3072024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yargee, W, Alabama-Quassarte Tribal Town ML24120A3032024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-SpottedBird, L, Kiowa Indian Tribe ML24120A3052024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Woommavovah, M, Comanche Nation ML24120A3062024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Yahola, s, Kialegee Tribal Town ML24120A2962024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Kaskaske, D, Kickapoo Tribe of Oklahoma ML24120A2982024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Martinez, E, Mescalero Apache Tribe ML24120A3002024-04-29029 April 2024 Lr Feis Section 106 Consultation Letters, Tribes-Morrow, R K, Thlopthlocco Tribal Town ML24108A1542024-04-26026 April 2024 Lr Feis Section 106 Consultation Letters Achp ML24107B0292024-04-26026 April 2024 Lr Feis Section 106 Consultation Letters Shpo ML24080A1802024-04-26026 April 2024 Ltr to Ken J. Peters, Sr VP and Chief Nuclear Officer, CPNPP re-NOA Final Plant Specific Supplement 60 IR 05000445/20240012024-04-26026 April 2024 Integrated Inspection Report 05000445/2024001 and 05000446/2024001 CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report IR 05000445/20244022024-04-17017 April 2024 Security Baseline Inspection Report 05000445/2024402 and 05000446/2024402 (Full Report) ML24085A2252024-04-11011 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0037 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable ML24068A0762024-03-18018 March 2024 Final Transmittal Letter for Comanche Peak SE for LRA Review 2024-09-03
[Table view] |
See also: IR 05000445/2018010
Text
April 30, 2018
Ken J. Peters, Senior Vice President
and Chief Nuclear Officer
Vistra Operations Company LLC
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT - NOTIFICATION OF NRC
DESIGN BASES ASSURANCE INSPECTION (TEAMS) (05000445/2018010 and
05000446/2018010) AND INITIAL REQUEST FOR INFORMATION
Dear Mr. Peters:
On June 5, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial baseline
design bases assurance inspection at the Comanche Peak Nuclear Power Plant, Units 1 and 2.
A six-person team will perform this inspection using NRC Inspection Procedure 71111,
Attachment 21M, Design Bases Assurance Inspection (Teams).
The inspection focuses on the maintenance of component design bases and modifications
made to structures, systems, and components. The samples reviewed during this inspection
will be identified during an information gathering visit and during the subsequent in-office
preparation week. In addition, a number of operating experience issues will also be selected for
review.
The inspection will include an information gathering site visit by the team leader and 2 weeks
of on-site inspection by the team. The inspection will consist of four NRC inspectors and
two contractors, of which five will focus on engineering and one on operations. The current
inspection schedule is as follows:
On-site Information Gathering Visit: June 5 - 6, 2018
Preparation Weeks: June 18 - 22, 2018, and July 2 - 6, 2018
On-site Weeks: June 25 - 29, 2018, and July 9 - 13, 2018
The purpose of the information gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the on-site weeks, several days and administration will be needed on the plant-
referenced simulator in order to facilitate the development of operator action-based scenarios.
Additional information and documentation needed to support the inspection will be identified
during the inspection, including interviews with engineering managers, engineers, and
probabilistic safety assessment staff.
K. Peters 2
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into two groups. The first group lists
information necessary for the information gathering visit and for general preparation. This
information should be available to the Regional office no later than June 5, 2018, unless
otherwise stated. If possible, this information should be provided electronically to the lead
inspector. Since the inspection will be concentrated on high risk/low margin components and
modifications, calculations associated with your list of high risk components and modifications
should be available to review during the information gathering visit to assist in our selection of
components based on available design margin.
The second group of documents requested lists information necessary to aid the inspection
team in tracking issues identified as a result of the inspection. It is requested that this
information be provided to the lead inspector as the information is generated during the
inspection. An additional request will be made by the team during the preparation week once
the specific components and modifications have been selected. Additional requests by
inspectors will also be made throughout the on-site weeks for specific documents needed to
complete the review. It is important that all of these documents are up-to-date and complete in
order to minimize the number of additional documents requested during the preparation and/or
on-site portions of the inspection. In order to facilitate the inspection, we request that a contact
individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Jonathan Braisted. We understand that our licensing
engineer contact for this inspection is Gary Merka. If there are any questions about the
inspection or the requested materials, please contact the lead inspector by telephone at
817-200-1194 or by e-mail at Jonathan.Braisted@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
K. Peters 3
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-445 and 50-446
License Nos. NPF-87 and NPF-89
Enclosure: Design Bases Assurance
Inspection (Teams) Initial Request for Information
Initial Request for Information
Design Bases Assurance Inspection (Teams)
Comanche Peak Nuclear Power Plant
Inspection Report: 05000445/2018010,
05000446/2018010
EPID ID: I-2018-010-0042
Information Gathering Dates: June 5 - 6, 2018
Inspection Dates: June 25 - 29, 2018
July 9 - 13, 2018
Inspection Procedure: IP 71111, Attachment 21M, Design Bases Assurance
Inspection (Teams)
Lead Inspector: Jonathan Braisted, Reactor Inspector
I. Information Requested Prior to Information Gathering Visit.
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (Certrec IMS preferred), to the attention of
Jonathan Braisted by June 5, 2018, to facilitate the reduction in the items to be selected
for a final list during the preparation week June 18, 2018. The inspection team will
finalize the selected list during the prep week using the additional documents requested
in Section II of this enclosure. The specific items selected from the lists shall be
available and ready for review on the day indicated in this request. *Please provide
requested documentation electronically in pdf files, Excel, or other searchable formats,
if possible. The information should contain descriptive names and be indexed and
hyperlinked to facilitate ease of use. Information in lists should contain enough
information to be easily understood by someone who has knowledge of pressurized
water reactor technology. If requested documents are large and only hard copy formats
are available, please inform the inspector and provide subject documentation during the
first day of the on-site inspection.
1. An Excel spreadsheet of equipment basic events (with definitions), including
importance measures sorted by risk achievement worth and Fussell-Vesely from
your internal events probabilistic risk assessment. Include basic events with risk
achievement worth value of 1.3 or greater.
2. A list of the top 50 cut-sets from your probabilistic risk assessment.
3. Copies of probabilistic risk assessment system notebooks and the latest
probabilistic risk assessment summary document.
4. An Excel spreadsheet of probabilistic risk assessment human action basic events or
risk ranking of operator actions from your site-specific PSA sorted by risk
achievement worth and Fussell-Vesely. Provide copies of your human reliability
worksheets for these items.
Enclosure
5. If you have an external events or fire PSA model, provide the information requested
in items 1-4 for external events and fire.
6. A list of high large early release frequency impact events and associated
components.
7. Structures, systems, and components in the Maintenance Rule (a)(1) category.
8. A list of high risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
9. Site top 10 issues list, if available.
10. Any pre-existing list of components and associated calculations with low design
margins.
11. A list of operating experience evaluations for the last 3 years.
12. A list of all time-critical operator actions in procedures.
13. A list of current operator work arounds/burdens.
14. Procedures, including emergency and abnormal, used to accomplish operator
actions associated with the basic events credited in your probabilistic risk
assessment.
15. Lists of permanent and temporary modifications performed in the past 5 years to
structures, systems, and components sorted by component identified in Item 1.
16. List of root cause evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
17. A list of any common-cause failures of components in the last 3 years.
18. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for this inspection.
19. A copy of engineering/operations-related audits completed in the last 2 years.
20. Electronic copies of the Technical Specifications, Technical Specifications Bases,
and the Final Safety Analysis Report, as updated.
21. A copy of the Individual Plant Examination of External Events, if available
electronically.
22. One-line drawings of emergency core cooling system, ultimate heat sink, emergency
feedwater, safety-related electrical systems.
23. A copy of condition reports associated with inspection findings from the previous
NRC Inspection Procedure 71111.21 (or 71111.21 Attachment M inspection).
24. A list of licensee contacts for the inspection team with phone numbers.
2
25. A copy of the current management and engineering organizational charts.
II. Information Requested to be provided throughout the inspection.
1. Electronic copies of the design bases documents for selected components and
modifications.
2. Electronic copies of the system health notebooks for selected components and
modifications.
3. A list of the design calculations that provide the design margin information for
selected components. (Calculations for selected components should be available
during the information gathering visit.)
4. Calculations and drawings associated with selected components.
5. Modification documentation associated with modifications selected from Item I.15,
this includes:
a. Post-modification testing, including performance characteristics affected,
assumptions, and acceptance criteria associated with modifications selected
b. Updated maintenance and surveillance procedures associated with
modifications
c. Updated operation procedures and training plans associated with the
modifications
6. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
7. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
Inspector Contact Information:
Peter Jayroe Brian Correll Michael Bloodgood
Reactor Inspector Reactor Inspector Emergency Response Specialist
817-200-1174 817-200-1565 817-200-1544
Peter.Jayroe@nrc.gov Brian.Correll@nrc.gov Michael.Bloodgood@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Jonathan Braisted
1600 East Lamar Blvd.
Arlington, TX 76011-4511
3
ML18121A311
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
By: JDB Yes No Publicly Available Sensitive NRC-002
OFFICE RI:EB1 C:EB1
NAME JBraisted TFarnholtz
SIGNATURE /RA/ /RA/
DATE 4/26/2018 4/30/2018