Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 Reports 05000445/2023006 and 05000446/2023006
ML24046A222
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/28/2024
From: Wermer G
NRC/RGN-IV/DORS/PBB
To: Peters K
Vistra Operations Company
Werner G
References
IR 2023006
Download: ML24046A222 (6)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000445/2023006 AND 05000446/2023006)

Dear Ken Peters:

The U.S. Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Comanche Peak Nuclear Power Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Comanche Peak Nuclear Power Plant, Units 1 and 2 during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2025.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In calendar year 2025, the NRC has scheduled four major site activities, which was approved by NRC management. In discussions with your staff, they stated the site will be able to support these inspection activities. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1141 with any questions you have regarding this letter.

Sincerely, Gregory E. Werner, Chief Projects Branch B Division of Operating Reactor Safety Docket Nos. 50-445, 50-446 License Nos. NPF-87, NPF-89 Enclosure:

Inspection Plan Distribution:

cc w/ encl: Distribution via LISTSERV Signed by Werner, Gregory on 02/28/24

ML24046A222 SUNSI Review ADAMS: Non-Publicly Available Non-SensitiveKeyword:

By: GEW Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/B C:DORS/B NAME DProulx GWerner SIGNATURE /RA/ GEW DATE 02/15/24 02/28/24

Site Inspection Activity Plan 07200074 - Comanche Peak (ISFSI)

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

Comanche Peak ISFSI Loading Inspection (one week during campaign) (Part 72) 2

3/25/2024 3/29/2024 IP 60855 001001 Operation Of An ISFSI

ISFSI Security Inspection (IP 81311) 1

9/9/2024 9/13/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations

Prepared on 2/20/2024 10:48:32 AM 1 of 3 Site Inspection Activity Plan Comanche Peak

01/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count

Security Equipment (.04), Security Training (.07) 2

1,2 2/12/2024 2/16/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 2/12/2024 2/16/2024 IP 71130.07 000739 Security Training

RP 5,8 2

1,2 2/26/2024 3/1/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 2/26/2024 3/1/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

Commercial Grade Dedication Inspection - Comanche Peak 3

1,2 4/29/2024 5/3/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

1,2 5/13/2024 5/17/2024 IP 71111.21N.03 001808 Commercial Grade Dedication

MC&A 1

1,2 5/27/2024 5/31/2024 IP 71130.11 000742 Material Control and Accounting (MC&A)

Security Protective Strategy (71130.05) and Target Sets (71130.14) 3

1,2 6/17/2024 6/21/2024 IP 71130.05 000737 Protective Strategy Evaluation

1,2 6/17/2024 6/21/2024 IP 71130.14 000743 Review of Power Reactor Target Sets

CP 2024 BRQ 3

1,2 8/18/2024 8/24/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151) 1

1,2 9/9/2024 9/13/2024 IP 71130.02 000734 Access Control

1,2 9/9/2024 9/13/2024 IP 71130.09 001656 Security Plan Changes

1,2 9/9/2024 9/13/2024 IP 71151 001338 Performance Indicator Verification

EP Program & PI Inspection (2024) - CP 1

1,2 9/23/2024 9/27/2024 IP 71114.02 000717 Alert and Notification System Testing

1,2 9/23/2024 9/27/2024 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 9/23/2024 9/27/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 9/23/2024 9/27/2024 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 9/23/2024 9/27/2024 IP 71151 001397 Performance Indicator Verification

CP 2024 INITIAL EXAM 5

1,2 9/15/2024 9/21/2024 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 10/20/2024 10/26/2024 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Inservice Inspection-CP (U2) 1

2 10/21/2024 11/1/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,3,PI 2

Prepared on 2/20/2024 10:48:32 AM 2 of 3 Site Inspection Activity Plan

1,2 10/21/2024 10/25/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 10/21/2024 10/25/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 10/21/2024 10/25/2024 IP 71151 000746 Performance Indicator Verification

Comprehensive Engineering Team Inspection - Comanche Peak 7

1,2 1/27/2025 1/31/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

1,2 2/10/2025 2/14/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

Inservice Inspection - CP (U1) 1

1 4/28/2025 5/9/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,4,PI - CP 2

1,2 4/28/2025 5/2/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 4/28/2025 5/2/2025 IP 71124.04 000728 Occupational Dose Assessment

1,2 4/28/2025 5/2/2025 IP 71151 000746 Performance Indicator Verification

CP 2025 INITIAL EXAM 6

1,2 6/8/2025 6/14/2025 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1,2 7/20/2025 8/2/2025 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

EP 2025 Biennial Exercise & PI Inspection 5

1,2 8/11/2025 8/15/2025 IP 71114.01 000716 Exercise Evaluation

1,2 8/11/2025 8/15/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 8/11/2025 8/15/2025 IP 71151 001397 Performance Indicator Verification

CP 2025 Biennial PI&R 4

1,2 9/8/2025 9/12/2025 IP 71152B 000747 Problem Identification and Resolution

1,2 9/22/2025 9/26/2025 IP 71152B 000747 Problem Identification and Resolution

Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151) 1

1,2 10/6/2025 10/10/2025 IP 71130.02 000734 Access Control

1,2 10/6/2025 10/10/2025 IP 71130.09 001656 Security Plan Changes

1,2 10/6/2025 10/10/2025 IP 71151 001338 Performance Indicator Verification

Cyber Security Inspection-CP 4

1,2 10/26/2025 11/1/2025 IP 71130.10 000741 Cybersecurity

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CP 5

1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1,2 11/17/2025 11/21/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

Prepared on 2/20/2024 10:48:32 AM 3 of 3