ML17138A255
ML17138A255 | |
Person / Time | |
---|---|
Site: | Prairie Island |
Issue date: | 03/30/2017 |
From: | Northard S Northern States Power Co, Xcel Energy |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML17138A253 | List: |
References | |
L-PI-17-011 | |
Download: ML17138A255 (1) | |
Similar Documents at Prairie Island | |
---|---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARML22251A1712022-09-0707 September 2022
[Table view]10 CFR 50 Appendix E Evacuation Time Estimate Analysis for the Monticello and Prairie Island Nuclear Generating Plants ML22161A9152022-06-10010 June 2022 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML18302A2552018-10-26026 October 2018 Procedure Change Summary Analysis and Revision 7 to FP-EP-PLAN-01, Offsite Nuclear Emergency Plan ML18299A0842018-10-26026 October 2018 Submittal of Offsite Nuclear Emergency Plan Revision ML18113A0532018-04-17017 April 2018 Revised Emergency Action Level (EAL) Matrix to Revision 10 and Emergency Action Level Technical Bases (F3-2.1) ML17138A2552017-03-30030 March 2017 Submittal of Revised Emergency Plan and Emergency Plan Implementing Procedures L-PI-17-011, Revision 53 to Emergency Plan2017-03-30030 March 2017 Revision 53 to Emergency Plan ML17094A5822017-03-29029 March 2017 Emergency Action Level (EAL) Matrix for Hot Condition L-PI-17-006, Emergency Action Level (EAL) Matrix for Cold Condition2017-03-29029 March 2017 Emergency Action Level (EAL) Matrix for Cold Condition ML17094A5762017-03-29029 March 2017 License Amendment Request to Revise Emergency Action Level (EAL) Scheme L-PI-14-071, July 21, 2014 ML14204A0522014-07-21021 July 2014 July 21, 2014 ML14204A052 L-PI-13-102, License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan2013-12-20020 December 2013 License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan L-PI-13-048, Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria2013-06-21021 June 2013 Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan2007-08-0707 August 2007 Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan L-PI-04-120, Emergency Action Levels Revision Submittal2004-10-22022 October 2004 Emergency Action Levels Revision Submittal L-PI-04-105, Sept. 22, 2004 ML0427504022004-09-22022 September 2004 Sept. 22, 2004 ML042750402 2022-09-07 Category:Emergency Preparedness-Emergency Plan Implementing Procedures MONTHYEARML21139A3112021-05-19019 May 2021
[Table view]Independent Spent Fuel Storage Installation (ISFSI) - Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss Handbook ML21139A3122021-05-19019 May 2021 Independent Spent Fuel Storage Installation (ISFSI) - Summary of Changes - 10 CFR 50.54(q)(5) ML19246A3512019-09-0303 September 2019 Independent Spent Fuel Storage Installation, and Monticello - Offsite Nuclear Emergency Plan Revision ML19014A0392019-01-14014 January 2019 Independent Spent Fuel Storage Installation, and Monticello, Offsite Nuclear Emergency Plan Revision L-PI-18-016, Enclosure 1, Form 1576 Emergency Action Level (EAL) Matrix, Revision 10 and Emergency Action Level Technical Bases, Revision 132018-04-17017 April 2018 Enclosure 1, Form 1576 Emergency Action Level (EAL) Matrix, Revision 10 and Emergency Action Level Technical Bases, Revision 13 ML17138A2562017-03-30030 March 2017 Revised Emergency Plan Implementing Procedures ML17138A2552017-03-30030 March 2017 Submittal of Revised Emergency Plan and Emergency Plan Implementing Procedures L-PI-15-108, Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-22016-01-11011 January 2016 Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-2 ML12320A0042012-11-0606 November 2012 Radiological Emergency Preparedness (Rep), Full Participation Plume Exposure Pathway Exercise L-PI-04-053, Emergency Plan Implementing Procedures (EPIP)2004-04-21021 April 2004 Emergency Plan Implementing Procedures (EPIP) ML0412504762004-04-20020 April 2004 Revisions to Controlled Documents, Emergency Plan Implementing Procedures ML0409204462004-03-25025 March 2004 Prairie, Revision 34 to Emergency Plan Implementing Procedure F3-2 L-PI-04-028, Revised Emergency Plan Implementing Procedures2004-03-11011 March 2004 Revised Emergency Plan Implementing Procedures L-PI-04-022, Revised EPIP Table of Contents, Revision 19 to F3-9, Emergency Evacuation, and Revision 0 to F3-17.2, Long Term Core Cooling.2004-02-20020 February 2004 Revised EPIP Table of Contents, Revision 19 to F3-9, Emergency Evacuation, and Revision 0 to F3-17.2, Long Term Core Cooling. L-PI-03-117, Revised EPIP Table of Contents and Revision 20 to F3-1, Onsite Emergency Organization, and Revision 20 to F3-10, Personnel Accountability.2003-12-17017 December 2003 Revised EPIP Table of Contents and Revision 20 to F3-1, Onsite Emergency Organization, and Revision 20 to F3-10, Personnel Accountability. L-PI-03-108, Revised EPIPs Table of Contents, Rev. 23 to F3-2, Classification of Emergencies, and Rev. 23 to F3-15, Responsibilities of the Radiation Survey Teams During a Radioactive Airborne Release.2003-11-21021 November 2003 Revised EPIPs Table of Contents, Rev. 23 to F3-2, Classification of Emergencies, and Rev. 23 to F3-15, Responsibilities of the Radiation Survey Teams During a Radioactive Airborne Release. L-PI-03-092, Revised Emergency Plan Implementing Procedures2003-10-0101 October 2003 Revised Emergency Plan Implementing Procedures L-PI-03-041, Emergency Plan Implementing Procedures2003-04-14014 April 2003 Emergency Plan Implementing Procedures L-PI-03-033, Emergency Plan Implementing Procedures2003-03-13013 March 2003 Emergency Plan Implementing Procedures L-PI-03-018, Emergency Plan Implementing Procedures2003-02-27027 February 2003 Emergency Plan Implementing Procedures L-PI-03-014, Emergency Plan Implementing Procedures2003-02-18018 February 2003 Emergency Plan Implementing Procedures ML0236105592002-12-19019 December 2002 Emergency Plan Implementing Procedures, Including Rev 18 to F3-9, Emergency Evacuation, Rev 20 to F3-8, Recommendations for Offsite Protective Actions & Rev 21 to F3-5, Emergency Notifications. ML0229605502002-10-16016 October 2002 Emergency Response Plan Implementing Procedure F3-13.5, Rev 5, Alternate Meteorological Data. ML0229605452002-10-14014 October 2002 Emergency Response Plan Implementing Procedures for Prairie Island Nuclear Generating Plant ML0228305292002-09-26026 September 2002 Offsite Nuclear Emergency Plan Implementing Procedures ML0228000952002-09-23023 September 2002 Emergency Plan Implementing Procedures TOC, F3-2, Rev 30, Classification of Emergencies, F3-31, Rev 6, Response to Security Related Threats & F3-23.1, Rev 12, Emergency Hotcell Procedure ML0228000312002-09-23023 September 2002 Emergency Plan Implementing Procedures TOC, & F3-2, Rev.30, Classification of Emergencies ML0224001802002-08-21021 August 2002 DAEC Emergency Planning Department Procedure Entire EAL Basis Document (Table of Contents Rev) (Copy 91) ML0222803542002-08-0808 August 2002 DAEC Emergency Planning Department Procedure Transmittal Acknowledgment Memo ML0221902822002-07-29029 July 2002 Revised Epips, Including Revised TOC, Rev. 7 to F3-19, Rev. 7 to 3-26.2, Rev. 10 to F3-18 & Temporary Change F3-2 ML0214404292002-05-0606 May 2002 Emergency Plan Implementing Procedures - F3 ML0211905362002-04-17017 April 2002 Emergency Plan Implementing Procedures - F3 ML0211902012002-04-17017 April 2002 Transmittal of Prairie Island Nuclear Generating Plant EOF Emergency Plan Implementing Procedures TOC & F8-9 (Revision 7) ML0214003472002-02-0404 February 2002 Emergency Plan Implementing Procedures - F3 2021-05-19 Category:Letter MONTHYEARIR 05000282/20230042024-02-0101 February 2024
[Table view]Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT ML23181A0192023-06-30030 June 2023 Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 ML23150A1722023-05-30030 May 2023 Preparation and Scheduling of Operator Licensing Examinations 2024-02-01 |
Text
1717 Wakonade Drive Welch, MN 55089 800.895.4999 xcelenergy.
com MAR 3 0 2017 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 --' fl Xcel Energy RESPONSIBLE BY NATURE L-Pl-17-011 10 CFR 50.54(q)(5)
Revised Emergency Plan (E-Plan) and Emergency Plan Implementing Procedures (EPIP) Pursuant to 10 50.54(q)(5) and 10 CFR 50, Appendix E, Section V, Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (hereafter "NSPM"), submits a revision to the Prairie Island Nuclear Generating Plan (PINGP) Emergency Plan (E-Plan) and Implementing Procedures (EPIP) as Enclosure
- 1. A summary of the changes is provided in Enclosure
- 2. The changes to E-Plan and EPIPs have been reviewed and do not result in a reduction in effectiveness of the Emergency Plan.
- Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company -Minnesota Enclosure (2) cc: Emergency Response Coordinator, Regional Administrator, Region Ill, USNRC (with Enclosures)
Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC (with Enclosures)
Operations Branch Chief, Operator Licensing and Emergency Preparedness, Region Ill USNRC (with Enclosures)
Administrator, Region Ill, USNRC (with Enclosure 2 ,)1-l +s N P-R