Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21139A31119 May 2021Independent Spent Fuel Storage Installation (ISFSI) - Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss HandbookBoric Acid
Health Physics Network
High winds
Reactor Vessel Water Level
High Radiation Area
Grab sample
Design basis earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Power change
ML21139A31219 May 2021Independent Spent Fuel Storage Installation (ISFSI) - Summary of Changes - 10 CFR 50.54(q)(5)Fuel cladding
ML19246A3513 September 2019Independent Spent Fuel Storage Installation, and Monticello - Offsite Nuclear Emergency Plan Revision
ML19014A03914 January 2019Independent Spent Fuel Storage Installation, and Monticello, Offsite Nuclear Emergency Plan Revision
L-PI-18-016, Enclosure 1, Form 1576 Emergency Action Level (EAL) Matrix, Revision 10 and Emergency Action Level Technical Bases, Revision 1317 April 2018Enclosure 1, Form 1576 Emergency Action Level (EAL) Matrix, Revision 10 and Emergency Action Level Technical Bases, Revision 13Safe Shutdown
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Tornado Missile
Operating Basis Earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
ML17138A25630 March 2017Revised Emergency Plan Implementing ProceduresHealth Physics Network
Grab sample
ML17138A25530 March 2017Submittal of Revised Emergency Plan and Emergency Plan Implementing Procedures
L-PI-15-108, Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-211 January 2016Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-2
ML12320A0046 November 2012Radiological Emergency Preparedness (Rep), Full Participation Plume Exposure Pathway ExerciseOperating Basis Earthquake
Nuclear Accident Reporting System
Deep Dose Equivalent
L-PI-04-053, Emergency Plan Implementing Procedures (EPIP)21 April 2004Emergency Plan Implementing Procedures (EPIP)Grab sample
Offsite Dose Calculation Manual
Met Tower
Design basis earthquake
Earthquake
Deep Dose Equivalent
Fuel cladding
ML04125047620 April 2004Revisions to Controlled Documents, Emergency Plan Implementing Procedures
ML04092044625 March 2004Prairie, Revision 34 to Emergency Plan Implementing Procedure F3-2Safe Shutdown
Grab sample
Offsite Dose Calculation Manual
Met Tower
Design basis earthquake
Earthquake
L-PI-04-028, Revised Emergency Plan Implementing Procedures11 March 2004Revised Emergency Plan Implementing ProceduresFitness for Duty
High winds
Severe Accident Management Guideline
L-PI-04-022, Revised EPIP Table of Contents, Revision 19 to F3-9, Emergency Evacuation, and Revision 0 to F3-17.2, Long Term Core Cooling.20 February 2004Revised EPIP Table of Contents, Revision 19 to F3-9, Emergency Evacuation, and Revision 0 to F3-17.2, Long Term Core Cooling.High winds
L-PI-03-117, Revised EPIP Table of Contents and Revision 20 to F3-1, Onsite Emergency Organization, and Revision 20 to F3-10, Personnel Accountability.17 December 2003Revised EPIP Table of Contents and Revision 20 to F3-1, Onsite Emergency Organization, and Revision 20 to F3-10, Personnel Accountability.Fitness for Duty
L-PI-03-108, Revised EPIPs Table of Contents, Rev. 23 to F3-2, Classification of Emergencies, and Rev. 23 to F3-15, Responsibilities of the Radiation Survey Teams During a Radioactive Airborne Release.21 November 2003Revised EPIPs Table of Contents, Rev. 23 to F3-2, Classification of Emergencies, and Rev. 23 to F3-15, Responsibilities of the Radiation Survey Teams During a Radioactive Airborne Release.High winds
Grab sample
Met Tower
Design basis earthquake
Earthquake
Fuel cladding
L-PI-03-092, Revised Emergency Plan Implementing Procedures1 October 2003Revised Emergency Plan Implementing Procedures
L-PI-03-041, Emergency Plan Implementing Procedures14 April 2003Emergency Plan Implementing Procedures
L-PI-03-033, Emergency Plan Implementing Procedures13 March 2003Emergency Plan Implementing Procedures
L-PI-03-018, Emergency Plan Implementing Procedures27 February 2003Emergency Plan Implementing ProceduresGrab sample
Offsite Dose Calculation Manual
Met Tower
Design basis earthquake
Earthquake
Fuel cladding
L-PI-03-014, Emergency Plan Implementing Procedures18 February 2003Emergency Plan Implementing ProceduresReactor Vessel Water Level
Fuel cladding
Power change
ML02361055919 December 2002Emergency Plan Implementing Procedures, Including Rev 18 to F3-9, Emergency Evacuation, Rev 20 to F3-8, Recommendations for Offsite Protective Actions & Rev 21 to F3-5, Emergency Notifications.Fitness for Duty
Health Physics Network
High winds
Met Tower
Deep Dose Equivalent
ML02296055016 October 2002Emergency Response Plan Implementing Procedure F3-13.5, Rev 5, Alternate Meteorological Data.
ML02296054514 October 2002Emergency Response Plan Implementing Procedures for Prairie Island Nuclear Generating Plant
ML02283052926 September 2002Offsite Nuclear Emergency Plan Implementing Procedures
ML02280009523 September 2002Emergency Plan Implementing Procedures TOC, F3-2, Rev 30, Classification of Emergencies, F3-31, Rev 6, Response to Security Related Threats & F3-23.1, Rev 12, Emergency Hotcell ProcedureOffsite Dose Calculation Manual
Met Tower
Design basis earthquake
Earthquake
ML02280003123 September 2002Emergency Plan Implementing Procedures TOC, & F3-2, Rev.30, Classification of Emergencies
ML02240018021 August 2002DAEC Emergency Planning Department Procedure Entire EAL Basis Document (Table of Contents Rev) (Copy 91)
ML0222803548 August 2002DAEC Emergency Planning Department Procedure Transmittal Acknowledgment MemoSafe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Internal Flooding
Operating Basis Earthquake
Design basis earthquake
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML02219028229 July 2002Revised Epips, Including Revised TOC, Rev. 7 to F3-19, Rev. 7 to 3-26.2, Rev. 10 to F3-18 & Temporary Change F3-2
ML0214404296 May 2002Emergency Plan Implementing Procedures - F3High winds
High Radiation Area
Met Tower
ML02119053617 April 2002Emergency Plan Implementing Procedures - F3Safe Shutdown
Fitness for Duty
Reactor Vessel Water Level
Grab sample
Offsite Dose Calculation Manual
Design basis earthquake
Severe Accident Management Guideline
Earthquake
Fuel cladding
Power change
ML02119020117 April 2002Transmittal of Prairie Island Nuclear Generating Plant EOF Emergency Plan Implementing Procedures TOC & F8-9 (Revision 7)Safe Shutdown
ML0214003474 February 2002Emergency Plan Implementing Procedures - F3