ML18299A084
ML18299A084 | |
Person / Time | |
---|---|
Site: | Monticello, Prairie Island |
Issue date: | 10/26/2018 |
From: | Murphy M Northern States Power Company, Minnesota, Xcel Energy Inc |
To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
Shared Package | |
ML18302A254 | List: |
References | |
L-XE-18-014 | |
Download: ML18299A084 (2) | |
Similar Documents at Monticello, Prairie Island | |
---|---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARML22251A1712022-09-0707 September 2022
[Table view]10 CFR 50 Appendix E Evacuation Time Estimate Analysis for the Monticello and Prairie Island Nuclear Generating Plants L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan ML22161A9152022-06-10010 June 2022 And Prairie Island Nuclear Generating Plant, Units 1 and 2 - Response to a Request for Additional Information Xcel Energy Amendment Request to Create a Common Emergency Plan and Emergency Operations. ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML21160A1052021-06-0909 June 2021 Enclosure 1: Summary of Changes L-MT-21-036, Enclosure 2: New Revision 55 of Emergency Plan2021-06-0909 June 2021 Enclosure 2: New Revision 55 of Emergency Plan ML20266F1052020-09-23023 September 2020 (PINGP) COVID-19 Exemption Request for the 2020 Biennial Emergency Preparedness Exercise ML18302A2552018-10-26026 October 2018 Procedure Change Summary Analysis and Revision 7 to FP-EP-PLAN-01, Offsite Nuclear Emergency Plan ML18299A0842018-10-26026 October 2018 Submittal of Offsite Nuclear Emergency Plan Revision L-MT-18-044, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan2018-08-28028 August 2018 Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan L-MT-18-024, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan2018-04-24024 April 2018 Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan ML18113A0532018-04-17017 April 2018 Revised Emergency Action Level (EAL) Matrix to Revision 10 and Emergency Action Level Technical Bases (F3-2.1) L-MT-17-080, Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan2017-12-0606 December 2017 Submittal of Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan L-MT-17-048, Submittal of Change to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan2017-06-15015 June 2017 Submittal of Change to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan L-MT-17-029, Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan2017-04-18018 April 2017 Changes to the Monticello Nuclear Generating Plant (MNGP) Emergency Plan ML17095A1122017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attach. 1, EAL Comparison Matrix Document (Deviations & Differences) and Attachments 2 & 3, Red-Line & Clean Versions of EAL Technical Bases Document ML17095A1212017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Emergency Action Level Matrix, Cold Conditions (Attachment 5) L-MT-17-012, License Amendment Request to Revise Emergency Action Level Scheme: Emergency Action Level Matrix, Hot Conditions (Attachment 5)2017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Emergency Action Level Matrix, Hot Conditions (Attachment 5) L-PI-17-011, Revision 53 to Emergency Plan2017-03-30030 March 2017 Revision 53 to Emergency Plan ML17138A2552017-03-30030 March 2017 Submittal of Revised Emergency Plan and Emergency Plan Implementing Procedures L-PI-17-006, Emergency Action Level (EAL) Matrix for Cold Condition2017-03-29029 March 2017 Emergency Action Level (EAL) Matrix for Cold Condition ML17094A5822017-03-29029 March 2017 Emergency Action Level (EAL) Matrix for Hot Condition ML17094A5762017-03-29029 March 2017 License Amendment Request to Revise Emergency Action Level (EAL) Scheme L-MT-17-010, License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times2017-03-24024 March 2017 License Amendment Request: Revision to Emergency Plan Staff Augmentation Response Times ML16125A4352016-05-0303 May 2016 Ltr. 05/03/16 Monticello Nuclear Generating Plant - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) L-MT-16-021, Changes to the Emergency Plan, Revision 472016-04-29029 April 2016 Changes to the Emergency Plan, Revision 47 L-MT-16-011, Changes to the Emergency Plan, Including Revision 19 to Emergency Preparedness Training Program Description2016-02-25025 February 2016 Changes to the Emergency Plan, Including Revision 19 to Emergency Preparedness Training Program Description L-PI-14-071, July 21, 2014 ML14204A0522014-07-21021 July 2014 July 21, 2014 ML14204A052 L-PI-13-102, License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan2013-12-20020 December 2013 License Amendment Request (LAR) to Revise Staff Augmentation Times in the Prairie Island Nuclear Generating Plant (PINGP) Emergency Plan ML13281A8262013-10-0404 October 2013 License Amendment Request: Change to the MNGP Emergency Plan to Remove the Radwaste Operator as a 60 Minute Responder L-PI-13-048, Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria2013-06-21021 June 2013 Supplement to License Amendment Request (LAR) to Revise Emergency Plan (EP) Emergency Action Levels (Eals): RA 1.2 and Fuel Clad Barrier Loss Criteria L-MT-12-078, License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor2012-12-21021 December 2012 License Amendment Request: Modification to the MNGP Emergency Plan Concerning a Revision to the Emergency Action Level Setpoint for the Turbine Building Normal Waste Sump Monitor L-MT-12-095, Emergency Preparedness (EP) Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Fo2012-10-29029 October 2012 Emergency Preparedness (EP) Communications Assessment Requested by NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan2007-08-0707 August 2007 Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan L-PI-04-120, Emergency Action Levels Revision Submittal2004-10-22022 October 2004 Emergency Action Levels Revision Submittal L-PI-04-105, Sept. 22, 2004 ML0427504022004-09-22022 September 2004 Sept. 22, 2004 ML042750402 ML0409900862004-04-0202 April 2004 Rev. 25 to Monticello Emergency Plan 2022-09-07 Category:Letter MONTHYEARML24298A0552024-10-30030 October 2024
[Table view]Response to Alternative RR-10, Auxiliary Feedwater Valve Testing ML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 2024-09-27 |
Text
414 Nicollet Mall Minneapolis, MN 55401 800.895.4999 xcelenergy.com October 26, 2018 L-XE-18-014 10 CFR 50.54(q)(5) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Monticello Nuclear Generating Plant Units 1 and 2 Docket 50-263 Docket 50-282 and 50-306 Renewed Facility Operating License Renewed Facility Operating License Nos. No. DPR-22 DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 Offsite Nuclear Emergency Plan Revision As required by 10 CFR 50.54(q)(5) and 10 CFR 72.44(f), Northern States Power Company, a Minnesota corporation (NSPM), d/b/a Xcel Energy, hereby submits the enclosed summary of a completed 10 CFR 50.54(q) change evaluation for a revision to the corporate Offsite Nuclear Emergency Plan (Enclosure 1). In addition, the revision to the corporate Offsite Nuclear Emergency Plan is enclosed (Enclosure 2). This revision has been reviewed and does not result in a reduction in the effectiveness of the Emergency Plan.
Document Control Desk Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
Martin C. Murphy Director, Nuclear Licensing and Regulatory Services Northern States Power Company - Minnesota Enclosures (2) cc: Director, Division of Spent Fuel Storage and Transportation, NMSS Administrator, USNRC, Region Ill Project Manager, Monticello, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Monticello, USNRC Resident Inspector, Prairie Island, USNRC