ML17138A255
| ML17138A255 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 03/30/2017 |
| From: | Northard S Northern States Power Co, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17138A253 | List: |
| References | |
| L-PI-17-011 | |
| Download: ML17138A255 (1) | |
Text
1717 Wakonade Drive Welch, MN 55089 800.895.4999 xcelenergy. com MAR 3 0 2017 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555 Prairie Island Nuclear Generating Plant, Units 1 and 2 Docket Nos. 50-282 and 50-306 Renewed License Nos. DPR-42 and DPR-60 fl Xcel Energy RESPONSIBLE BY NATURE L-Pl-17-011 10 CFR 50.54(q)(5)
Revised Emergency Plan (E-Plan) and Emergency Plan Implementing Procedures (EPIP)
Pursuant to 10 O~R 50.54(q)(5) and 10 CFR 50, Appendix E, Section V, Northern States Power Company, a Minnesota Corporation, doing business as Xcel Energy (hereafter "NSPM"), submits a revision to the Prairie Island Nuclear Generating Plan (PINGP) Emergency Plan (E-Plan) and Implementing Procedures (EPIP) as Enclosure 1. A summary of the changes is provided in Enclosure 2.
The changes to E-Plan and EPIPs have been reviewed and do not result in a reduction in effectiveness of the Emergency Plan.
Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.
Scott Northard Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure (2) cc:
Emergency Response Coordinator, Regional Administrator, Region Ill, USNRC (with Enclosures)
Resident Inspector, Prairie Island Nuclear Generating Plant, USNRC (with Enclosures)
Operations Branch Chief, Operator Licensing and Emergency Preparedness, Region Ill USNRC (with Enclosures)
Administrator, Region Ill, USNRC (with Enclosure 2
,)1-l +s N P-R