Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML21139A3112021-05-19019 May 2021 Independent Spent Fuel Storage Installation (ISFSI) - Revised Emergency Plan (E-Plan), Emergency Plan Implementing Procedures (EPIP) and Rec/Rpss Handbook ML21139A3122021-05-19019 May 2021 Independent Spent Fuel Storage Installation (ISFSI) - Summary of Changes - 10 CFR 50.54(q)(5) ML19246A3512019-09-0303 September 2019 Independent Spent Fuel Storage Installation, and Monticello - Offsite Nuclear Emergency Plan Revision ML19014A0392019-01-14014 January 2019 Independent Spent Fuel Storage Installation, and Monticello, Offsite Nuclear Emergency Plan Revision L-PI-18-016, Enclosure 1, Form 1576 Emergency Action Level (EAL) Matrix, Revision 10 and Emergency Action Level Technical Bases, Revision 132018-04-17017 April 2018 Enclosure 1, Form 1576 Emergency Action Level (EAL) Matrix, Revision 10 and Emergency Action Level Technical Bases, Revision 13 ML17138A2562017-03-30030 March 2017 Revised Emergency Plan Implementing Procedures ML17138A2552017-03-30030 March 2017 Submittal of Revised Emergency Plan and Emergency Plan Implementing Procedures L-PI-15-108, Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-22016-01-11011 January 2016 Revised Emergency Plan Implementing Procedures (Epips), Including Revision 22 to F3-12, Revision 15 to F3-21, Revision 27 to F3-9, Revision 13 to F3-23-1CU-I, and Revision 14 to F3-23-2C U-2 ML12320A0042012-11-0606 November 2012 Radiological Emergency Preparedness (Rep), Full Participation Plume Exposure Pathway Exercise L-PI-04-053, Emergency Plan Implementing Procedures (EPIP)2004-04-21021 April 2004 Emergency Plan Implementing Procedures (EPIP) ML0412504762004-04-20020 April 2004 Revisions to Controlled Documents, Emergency Plan Implementing Procedures ML0409204462004-03-25025 March 2004 Prairie, Revision 34 to Emergency Plan Implementing Procedure F3-2 L-PI-04-028, Revised Emergency Plan Implementing Procedures2004-03-11011 March 2004 Revised Emergency Plan Implementing Procedures L-PI-04-022, Revised EPIP Table of Contents, Revision 19 to F3-9, Emergency Evacuation, and Revision 0 to F3-17.2, Long Term Core Cooling.2004-02-20020 February 2004 Revised EPIP Table of Contents, Revision 19 to F3-9, Emergency Evacuation, and Revision 0 to F3-17.2, Long Term Core Cooling. L-PI-03-117, Revised EPIP Table of Contents and Revision 20 to F3-1, Onsite Emergency Organization, and Revision 20 to F3-10, Personnel Accountability.2003-12-17017 December 2003 Revised EPIP Table of Contents and Revision 20 to F3-1, Onsite Emergency Organization, and Revision 20 to F3-10, Personnel Accountability. L-PI-03-108, Revised EPIPs Table of Contents, Rev. 23 to F3-2, Classification of Emergencies, and Rev. 23 to F3-15, Responsibilities of the Radiation Survey Teams During a Radioactive Airborne Release.2003-11-21021 November 2003 Revised EPIPs Table of Contents, Rev. 23 to F3-2, Classification of Emergencies, and Rev. 23 to F3-15, Responsibilities of the Radiation Survey Teams During a Radioactive Airborne Release. L-PI-03-092, Revised Emergency Plan Implementing Procedures2003-10-0101 October 2003 Revised Emergency Plan Implementing Procedures L-PI-03-041, Emergency Plan Implementing Procedures2003-04-14014 April 2003 Emergency Plan Implementing Procedures L-PI-03-033, Emergency Plan Implementing Procedures2003-03-13013 March 2003 Emergency Plan Implementing Procedures L-PI-03-018, Emergency Plan Implementing Procedures2003-02-27027 February 2003 Emergency Plan Implementing Procedures L-PI-03-014, Emergency Plan Implementing Procedures2003-02-18018 February 2003 Emergency Plan Implementing Procedures ML0236105592002-12-19019 December 2002 Emergency Plan Implementing Procedures, Including Rev 18 to F3-9, Emergency Evacuation, Rev 20 to F3-8, Recommendations for Offsite Protective Actions & Rev 21 to F3-5, Emergency Notifications. ML0229605502002-10-16016 October 2002 Emergency Response Plan Implementing Procedure F3-13.5, Rev 5, Alternate Meteorological Data. ML0229605452002-10-14014 October 2002 Emergency Response Plan Implementing Procedures for Prairie Island Nuclear Generating Plant ML0228305292002-09-26026 September 2002 Offsite Nuclear Emergency Plan Implementing Procedures ML0228000952002-09-23023 September 2002 Emergency Plan Implementing Procedures TOC, F3-2, Rev 30, Classification of Emergencies, F3-31, Rev 6, Response to Security Related Threats & F3-23.1, Rev 12, Emergency Hotcell Procedure ML0228000312002-09-23023 September 2002 Emergency Plan Implementing Procedures TOC, & F3-2, Rev.30, Classification of Emergencies ML0224001802002-08-21021 August 2002 DAEC Emergency Planning Department Procedure Entire EAL Basis Document (Table of Contents Rev) (Copy 91) ML0222803542002-08-0808 August 2002 DAEC Emergency Planning Department Procedure Transmittal Acknowledgment Memo ML0221902822002-07-29029 July 2002 Revised Epips, Including Revised TOC, Rev. 7 to F3-19, Rev. 7 to 3-26.2, Rev. 10 to F3-18 & Temporary Change F3-2 ML0214404292002-05-0606 May 2002 Emergency Plan Implementing Procedures - F3 ML0211905362002-04-17017 April 2002 Emergency Plan Implementing Procedures - F3 ML0211902012002-04-17017 April 2002 Transmittal of Prairie Island Nuclear Generating Plant EOF Emergency Plan Implementing Procedures TOC & F8-9 (Revision 7) ML0214003472002-02-0404 February 2002 Emergency Plan Implementing Procedures - F3 2021-05-19
[Table view] Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT ML23181A0192023-06-30030 June 2023 Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 ML23150A1722023-05-30030 May 2023 Preparation and Scheduling of Operator Licensing Examinations 2024-02-01
[Table view] |
Text
Committed to Nuclear Excellence Mano K. Nazar Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Dr. East
- Welch MN 55089 October 16, 2002 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 Docket Nos. 50-306 License Nos. DPR-60 Prairie Island Emergency Plan Implementing Procedures - F3 Emergency Response Plan Implementing Procedures Furnished with this letter are the Prairie Island Nuclear Generating Plant Emergency Plan Implementing Procedures F3. This revision includes the following procedures:
INDEXES: Emergency Plan Implementing Procedures TOC REVISIONS:
F3-13.5 Alternate Meteorological Data Rev. 5 DELETIONS:
None TEMPORARY CHANGE DELETIONS:
None INSTRUCTIONS:
Please post changes in your copy of the Prairie Island Nuclear Generating Plant Emergency Plan Implementing Procedures. Procedures, which have been superseded or deleted, should be destroyed.
Please sign and return the acknowledgment of this update to Bruce Loesch, Prairie Island Nuclear
C C Generating Plant, 1717 Wakonade Drive East, Welch, MN 55089. If you have any questions, please contact Mel Agen at 651-388-1121 Extension 4240.
Mano K. Nazar Site Vice Presid t Prairie Island N lear Generating Plant c: USNRC - Steve Orth, Region 1m1 (2 copies)
NRC Resident Inspector (w/o attachment)
M Agen (w/o attachment)
Records Management (Doc Control Copy) (w/o attachment)
NL File (w/o attachment)
Mfst Num: 2002 - 0822 Date : 10/14/02 FROM : Bruce Loesch/Mary Gadient Loc : Prairie Island TO : UNDERWOOD, BETTY J Copy Num: 515 Holder : US NRC DOC CONTROL DESK SUBJECT : Revisions to CONTROLLED DOCUMENTS Procedure # Rev Title Revisions:
F3-13.5 5 ALTERNATE METEOROLOGICAL DATA UPDATING INSTRUCTIONS Place this material in your Prairie Island Controlled Manual or File. Remove revised or cancelled material and recycle it. Sign and date this letter in the space provided below within ten working days and return to Bruce Loesch or Mary Gadient, Prairie Island Nuclear Plant, 1717 Wakonade Drive E.,
Welch, MN 55089.
Contact Bruce Loesch (ext 4664) or Mary Gadient (ext 4478) if you have any questions.
Received the material stated above and complied with the updating instructions Date
PRAIRIE ISLAND NUCLEAR
Title:
I GENERATING PLANT Emergency Plan Implementing Procedures TOC i I eI Effective Date : 10/14/02 I I lApproved By:cI ( BPS- Suo 7
. I Rev Document # Title 19 F3-1 ONSITE EMERGENCY ORGANIZATION 30 F3-2 CLASSIFICATIONS OF EMERGENCIES 18 F3-3 RESPONSIBILITIES DURING A NOTIFICATION OF UNUSUAL EVENT SITE AREA, 28 F3-4 RESPONSIBILITIES DURING AN ALERT, OR GENERAL EMERGENCY 20 F3-5 EMERGENCY NOTIFICATIONS 8
F3-5.1 SWITCHBOARD OPERATOR DUTIES 9
F3-5.2 RESPONSE TO FALSE SIREN ACTIVATION 8
F3-5.3 RESPONSE TO RAILROAD GRADE CROSSING BLOCKAGE 111ý 16 F3-6 ACTIVATION & OPERATION OF TECHNICAL SUPPORT CENTER 15 F3-7 ACTIVATION & OPERATION OF OPERATIONAL SUPPORT CENTER (OSC) 19 F3-8 RECOMMENDATIONS FOR OFFSITE PROTECTIVE ACTIONS 12 F3-8.1 RECOMMENDATIONS FOR OFFSITE PROTECTIVE ACTIONS FOR THE ON SHIFT EMERGENCY DIRECTOR /SHIFT MANAGER 17 F3-9 EMERGENCY EVACUATION 19 F3-10 PERSONNEL ACCOUNTABILITY 8
F3-11 SEARCH & RESCUE 14 F3-12 EMERGENCY EXPOSURE CONTROL 15 F3-13 OFFSITE DOSE CALCULATION 11 F3-13.3 MANUAL DOSE CALCULATIONS 7
F3-13.4 MIDAS METEOROLOGICAL DATA DISPLAY ALTERNATE METEOROLOGICAL DATA 5 F3-13 .5 Page 1 of 3
PRAIRIE ISLAND NUCLEAR Title : Emergency Plan Implementing Procedures TOC GENERATING PLANT Effective Date : 10/14/02 Document # Title Rev 11 F3-13.6 WEATHER FORECASTING INFORMATION 11 F3-14.1 ONSITE RADIOLOGICAL MONITORING 9
F3-14.2 OPERATIONS EMERGENCY SURVEYS 22 F3-15 RESPONSIBILITIES OF THE RADIATION SURVEY TEAMS DURING A RADIOACTIVE AIRBORNE RELEASE 17 F3-16 RESPONSIBILITIES OF THE RADIATION SURVEY TEAMS DURING A RADIOACTIVE LIQUID RELEASE 9
F3-17 CORE DAMAGE ASSESSMENT 10 F3-18 THYROID IODINE BLOCKING AGENT (POTASSIUM IODIDE) 7 F3-19 PERSONNEL & EQUIPMENT MONITORING & DECONTAMINATION 17 F3-20 DETERMINATION OF RADIOACTIVE RELEASE CONCENTRATIONS 9
F3-20 .1 DETERMINATION OF STEAM LINE DOSE RATES 9
F3-20.2 DETERMINATION OF SHIELD BUILDING VENT STACK DOSE RATES 10 F3-21 ESTABLISHMENT OF A SECONDARY ACCESS CONTROL POINT 16 F3-22 PRAIRIE ISLAND RADIATION PROTECTION GROUP RESPONSE TO A MONTICELLO EMERGENCY 18 F3-23 EMERGENCY SAMPLING 12 F3-23.1 EMERGENCY HOTCELL PROCEDURE 7
F3-24 RECORD KEEPING DURING AN EMERGENCY 8
F3-25 REENTRY 7
F3-26.1 OPERATION OF THE ERCS DISPLAY 7
F3-26.2 RADIATION MONITOR DATA ON ERCS 1
F3-26.3 ERDS - NRC DATA LINK 18 F3-29 EMERGENCY SECURITY PROCEDURES 6
F3-30 TRANSITION TO RECOVERY Page 2 of 3
PRAIRIE ISLAND NUCLEAR Title : Emergency Plan Implementing Procedures TOC GENERATING PLANT Effective Date : 10/14/02 Document # Title Rev F3-31 RESPONSE TO SECURITY RELATED THREATS 6 F3-32 REVIEW OF EMERGENCY PREPAREDNESS DURING OR AFTER 2 NATURAL DISASTER EVENTS Page 3 of 3
PRAIRIE ISLAND NUCLEAR GENERATING PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES 16 .ElFEREAc~OS~
- Proceduresegments may be performed from memory.
- Use the procedure to verify'segments are complete.
- Mark off steps within segment before continuing.
- Procedureshould be availableat the work location.
D.C. REVIEW DATE: OW NER: Effective Date I oI~ Z c M. Werner lO-lq-O,?
Page 1 of 5
I _
PRAIRIE ISLAND NUCLEAR GENERATING PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES NUMBER:
ALTERNATE METEOROLOGICAL RV3-13.5 DATA REV: 5 1.0 PURPOSE This procedure provides instructions to obtain meteorological data from alternate sources.
2.0 APPLICABILITY This procedure SHALL apply to the Radiation Protection Group, Shift Emergency Communicators, Shift Supervisors and Shift Managers.
3.0 PRECAUTIONS 3.1 When using alternate meteorological data, attempt to obtain meteorological data that would be indicative of local meteorology first.
3.2 Ensure meteorological data is in the correct units prior to using data in performing dose calculations or transmitting to offsite authorities.
Page 2 of 5
PRAIRIE ISLAND NUCLEAR GENERATING PLANT EMERGENCY EM PLAN IMPLEMENTING PROCEDURES 4.0 PROCEDURE 4.1 ERCS Metdata Group Display The primary meteorological tower supplies meteorological data to the Emergency Response Computer System (ERCS).
4.1.1 To gain access to the meteorological data on ERCS:
A. Type "GRPDIS" then press <ENTER>
'ýB. . After prompt,,type "METDATA" then press <ENTER>
4.1.2 The display will respond with a list of meteorological data points along with the prompt: ENTER UPDATE RATE IN SEC (5-1800). Enter the desired, update interval.
4.1.3 Proceed to Page 2 of 2 of METDATA to access 15 minute running averages.
I 1 ,*w;,h* *Use 10 meter data from 10A sensor if reliable, otherwise use I WNOTE. * *
, , :f 101B, 60A, 60B, or 22 meter tower data.
4.1.4 Obtain the wind speed, direction and temperature.
4.1.5 Obtain DELTA TEMP A or DELTA TEMP B and determine the alphanumeric stability class using Table 1.
4.2 Lock and Dam #3 Ground level wind speed and wind direction are available from Lock & Dam #3 on a 24 hour/day, 365 day/year basis.
4.2.1 Contact the Lockmaster at Lock & Dam #3 by telephone at 388-5794.
,' <:.: K~ *Only wind speed and wind direction are available at Lock &
!~OTE ~Dam #3.
4.2.2 Obtain the wind speed and wind direction from the Lockmaster.
" Page 3 of 5
PRAIRIE ISLAND NUCLEAR GENERATING PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES 4.2.3 Obtain the stability class from the Minneapolis National Weather Service in accordance with Step 4.3.
4.3 National Weather Service Wind speed, wind direction and Pasquill Stability Class are available from the Minneapolis National Weather Service.
4.3.1 Contact the Minneapolis National Weather Service using either the telephone or the NAWAS, as per F3-13.6, Weather Forecasting Information.
4.3.2 Obtain the wind speed, wind direction and the Pasquill stability class for the local area.
Page 4 of 5
PRAIRIE ISLAND NUCLEAR GENERATING PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURES Table 1 Stability Class Determination DELTA T (°F)150m STABILITY CLASS WDS1 SIGMA THETA
<-1.71 A > 23
-1.71 to -1.53 B 18 -23
-1.52 to -1.35 C 13-18
-1.34 to -0.45 D 8-13
-0.44 to +1.35 E 4-8
+1.36 to +3.60 F <4
> 3.60 G A: Extremely unstable conditions D: Neutral conditions B: Moderately unstable conditions E: Slightly stable conditions
"*_jC: Slightly unstable conditions F: Moderately stable conditions G: Extremely stable conditions NOTE: AT(OF) = (1.8) AT(°C)
Page 5 of 5