2014 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant Units 1 and 2, (Report 05000317/2014001 and 05000318/2014001)(w/Inspection Plan)
ML15058A295
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/04/2015
From: Ho Nieh
Division Reactor Projects I
To: George Gellrich
Calvert Cliffs, Exelon Generation Co
Schroeder D
References
IR 2014001
Download: ML15058A295 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 March 4, 2015 Mr. George Site Vice President Calvert Cliffs Nuclear Power Plant, LLC Exelon Generation Company, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657 SUBJECT: ANNUAL ASSESSMENT LETTER FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 05000317/2014001 AND 05000318/2014001)

Dear Mr. Gellrich:

On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Calvert Cliffs Nuclear Power Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Calvert Cliffs Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance of Calvert Cliffs Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC determined the performance at Calvert Cliffs Unit 2 during the most recent quarter was within the Regulatory Response Column of the NRCs ROP Action Matrix because of all Green PIs and a finding of low to moderate safety significance (White) in the Emergency Preparedness cornerstone. Specifically, on October 27, 2014, the NRC issued a White Notice of Violation (NOV) and Assessment Follow-Up Letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14297A547) to Calvert Cliffs Nuclear Power Plant for failing to maintain an adequate standard emergency action level scheme because inaccurate effluent radiation monitor thresholds were incorporated into Table R-1, Effluent Monitor Classification Threshold, for Calvert Cliffs Unit 2. The NOV was retroactive to the second quarter of 2014 when the finding was originally documented. As discussed in the Assessment Follow-Up Letter, in addition to normal ROP baseline inspections, the NRC conducted a supplemental inspection for the White finding on site the week of February 2, 2015, in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area. The NRC will notify you of the results of this inspection via a separate inspection report which will be publicly available. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Daniel Schroeder at (610) 337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Ho K. Nieh Director Division of Reactor Projects Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Enclosure: Calvert Cliffs Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML15058A295 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebrook/AAR DSchroeder/DLS HNieh/HKN DATE 02/19/15 02/19/15 02/26/15

Page 1 of 2 Calvert Cliffs 02/26/2015 13:40:05 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RADIATION SAFETY INSPECTION - INSTRUMENT 1 1, 2 01/12/2015 01/16/2015 IP 71124.05 Radiation Monitoring Instrumentation 95001 - SUPPLEMENTAL INSPECTION FOR WHITE EP NOV 1 2 01/25/2015 01/30/2015 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 7111108P - U2 INSERVISE INSPECTION 1 2 02/23/2015 03/06/2015 IP 7111108P Inservice Inspection Activities - PWR 71124 - RADIATION SAFETY INSPECTION O 2 1, 2 03/02/2015 03/06/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 03/02/2015 03/06/2015 IP 71124.02 Occupational ALARA Planning and Controls 71124.08 - RADWASTE 1 1, 2 04/06/2015 04/10/2015 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124 - RADIATION SAFETY INSPECTION - REMP 1 1, 2 06/15/2015 06/19/2015 IP 71124.07 Radiological Environmental Monitoring Program 71152B - PI&R - BIENNIAL 2 1, 2 09/21/2015 09/25/2015 IP 71152B Problem Identification and Resolution 1, 2 10/05/2015 10/09/2015 IP 71152B Problem Identification and Resolution EP - EP EXERCISE 5 1, 2 09/14/2015 09/18/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2 09/14/2015 09/18/2015 IP 7111408 Exercise Evaluation - Scenario Review 7111111B - REQUAL INSP W/ P/F RESULTS 2 1, 2 11/16/2015 11/20/2015 IP 7111111B Licensed Operator Requalification Program CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 11/02/2015 11/06/2015 IP 7111121 Component Design Bases Inspection 1, 2 11/16/2015 11/20/2015 IP 7111121 Component Design Bases Inspection 1, 2 11/30/2015 12/04/2015 IP 7111121 Component Design Bases Inspection 71124 - RADIATION SAFETY INSPECTION - DOSE 1 1, 2 11/02/2015 11/06/2015 IP 71124.04 Occupational Dose Assessment 1, 2 11/02/2015 11/06/2015 IP 71151 Performance Indicator Verification ISI - U1 INSERVICE INSPECTION 1 1 02/22/2016 03/06/2016 IP 7111108P Inservice Inspection Activities - PWR BI - RADIOLOGICAL SAFETY - HAZARDS O 1 1, 2 02/29/2016 03/04/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 02/29/2016 03/04/2016 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Calvert Cliffs 02/26/2015 13:40:05 Inspection / Activity Plan Report 22 01/01/2015 - 06/30/2016 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI - RADIOLOGICAL SAFETY - HAZARDS O 1 1, 2 02/29/2016 03/04/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 71003 - U2 LR COMMITMENT INSPECTION - PHASE 2 1 2 05/09/2016 05/13/2016 IP 71003 Post-Approval Site Inspection for License Renewal BI - RADIOLOGICAL SAFETY - AIRBORNE 1 1, 2 05/09/2016 05/13/2016 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 05/09/2016 05/13/2016 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure