05000423/LER-1997-015, Forwards LER 97-015-00,documenting Condition Determined at Millstone Unit 3 on 970204 Per 10CFR50.73(a)(2)(ii)(B).Utils Commitments Attached

From kanterella
Jump to navigation Jump to search
Forwards LER 97-015-00,documenting Condition Determined at Millstone Unit 3 on 970204 Per 10CFR50.73(a)(2)(ii)(B).Utils Commitments Attached
ML20136B112
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/05/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136B116 List:
References
B16250, NUDOCS 9703100190
Download: ML20136B112 (4)


LER-2097-015, Forwards LER 97-015-00,documenting Condition Determined at Millstone Unit 3 on 970204 Per 10CFR50.73(a)(2)(ii)(B).Utils Commitments Attached
Event date:
Report date:
4232097015R00 - NRC Website

text

.. .~. . . .. . - . . .. - ~ - -. -. . --. -. .. --- . - -

i o

Rw t Feny Rd. (Route 156h WatufudE 06385 l Northeast i Nuclear Energy staltione Nuclear Power Station j , .. Northeast Nuclear Energy Company P.O. Box 128 Waterford, G F 06385-0128 (860) 447-1791 Faa (860) 444 4277

%e Nonheast Utilities My tem l March 5,1997 Docket No. 50-423 B16250 Re:10CFR50.73(a)(2)(ii)(B) l l

U. S. Nuclear Regulatory Commission l Document Control Desk l Washington, DC 20555 i

Millstone Nuclear Power Station Unit 3 l .

Licensee Event Reoort 97-015-00 Submitted Pursuant to 10CFR 50.73(a)(2)(ii)(B)

This letter forwards Licensee Event Report 97-015-00, documenting a condition that was determined at Millstone Unit No. 3 on February 4,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(ii)(B). NNECO's commitments in

! response to this event are contained within Attachment 1 to this letter.

f l

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 1

l 0

. D. HiU '

Unit Director, Millstone Unit No. 3 V

! 100004 g'h l 9703100190 970305 fE j PDR ADOCK 05000423 1

< S PDR 3 I

m3m.s uv. n.e 15,ElE%g,3,gggg

l US Nucl:ar Regulttory Commission B16250/Page 2 l . .

i

Attachment:

1) NNECO's commitments in response to LER 97-015-00
2) LER 97-015-00 cc: H. J. Miller, Region i Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 i

W. D. Travers, Dr., Director, Special Projects l

l l.

I 1

Docket No. 50-423 B16250 Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To iLER 97-015-001 l

l i

l l 1 l

l l

March 1997 i

l I

U.S. Nucl:ar R gulatory Commission B16250%ttachment 1\Page 1 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager -

Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions '

regarding this document or any associated regulatory commitments.

Number Commitment Due B16250-1 Calculations will be performed to determine if Prior to Mode 4.

containment sump water level requirements can be met. Modifications will made if' necessary following the reanalysis. These actions will be completed prior to entry into l Mode 4. I 1

l

l t

Docket No. 50-423 l B16250 l

t i

I l

l l

Attachment 2 Millstone Nuclear Power Station, Unit No. 3 l NNECO's Submittal of l- (LER 97-015-00) 1 i

l l

l l

l l

4 March 1997

-. . . - - . .