ML17284A89814 October 1999Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5
ML17284A88824 September 1999Informs NRC of Change in Schedule Pertaining to Final Implementation of Reactor Stability long-term Solution for WNP-2
ML17284A90624 September 1999Forwards Final Rept for 990812 out-of-sequence Drills for Energy Northwest Washington Nuclear Power Project 2 (Lab, Food Control Point & Milk Sampling).No Deficiences & No Areas Requiring C/A Identified in Three Drills
ML17292B75924 September 1999Forwards Rev 24 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b), 50.54(q) & 10CFR50 App E.Detailed Synopsis of Changes,Encl
ML17292B75822 September 1999Forwards NRC Forms 396 & 398 for Nl Hancock,License SOP-50027-3,AR Herrington,License OP-50013-3,WH Sawyer, License SOP-50023-3 & Dl Strote,License SOP-50031-3,for Renewal of Licenses.Without NRC Forms 396 & 398
ML17284A8819 September 1999Forwards Response to NRC 990623 RAI to Support Review of Pending Request for Amend to Reactor pressure-temp Limit Curve TS
GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)8 September 1999Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3)
ML17284A87130 August 1999Informs Staff of Errors in world-wide-web Database Related to WNP-2 Reactor Vessel Structural integrity.Marked-up Pages Containing Errors or Omissions Will Be Forwarded by 991201
ML17284A87230 August 1999Forwards Proprietary Info to Support Review of Request for Amend to License NPF-21,re Min Critical Power Ratio Safety Limits Tss,As Requested During 990816 Conversation. Proprietary Encl Withheld
ML17284A87530 August 1999Provides Correct Page from License NPF-21 Marked to Show Rev Addressed in 990729 Application for Amend,Which Included Page That Was Inadvertently Included as Attachment 4.Replace Attachment 4 with Attached Page & Disregard Attachment 5
ML17292B75324 August 1999Requests That Eleven Individuals Listed Below Take BWR Generic Fundamentals Examination to Be Administered on 991006Generic Fundamentals Examination
ML17292B75124 August 1999Forwards Fitness for Duty (FFD) Semiannual Performance Data Rept for Jan-June 1999,per 10CFR26.71(d)Fitness for Duty
ML17284A87019 August 1999Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee & NRC Form 398, Personal Qualification Statement - Licensee, for Jd Prescott (License SOP-50262-1).Without Encls
ML17292B75019 August 1999Informs Staff That Licensee Has Completed Review of NRC SER for B&Wog Util Resolution Guidance Document Addressing ECCS Suction Strainer Blockage
ML17284A86812 August 1999Submits Two ISI Program Plan Relief Requests for NRC Review & Approval,Per 10CFR50.55a(a)(3)(i).Proposed Alternatives Provide Acceptable Level of Quality & SafetyNondestructive Examination
ML17284A8542 August 1999Forwards Proprietary Addl Info to Support Review of Pending Request for Amend to MCPR Safety Limit Ts.Info Consists of Proprietary Ltr from Abb Combustion Engineering,Inc.Encl Withheld
ML17284A85330 July 1999Forwards Estimate of Number of Licensing Action Requests Planned for Submittal in Future,As Requested in Administrative Ltr 99-02.Twenty-nine Submittals Scheduled for Fy 2000 & Four for Fy 2001
ML17284A83022 July 1999Clarifies Change of Licensee Name from Wpps to Energy Northwest & Change of Facility Name from Wppss Nuclear Project Number 2 to WNP-2,as Requested in 990719 Telcon with Js Cushing of NRC.Marked-up OL Pages,Encl
ML17292B74520 July 1999Forwards Rev 23 to WNP-2 Emergency Plan,Iaw 10CFR50.4(b) & 50.54(q) & 10CFR50 App E.Rev 23 Provides Updated Description Re Establishment of Separate Emergency Operation Centers for Benton & Franklin Counties
ML17292B73916 July 1999Submits Withdrawal of Request for Amend to Secondary Containment & Standby Gas Treatment Sys Ts.Util Currently Plan to re-submit Amend Request in Entirety by 991112
ML17292B73812 July 1999Forwards NRC Form 396 & NRC Form 398,for If Sumsion,License OP-50487 & Ga Westergard,License SOP-50415 for Renewal of Operator Licenses.Without Encls
ML17292B7176 July 1999Provides Notification of Early Completion on 990630 of Exception Noted in 990629 Ltr.Equipment within Scope of GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants, Evaluated & Y2K Ready
ML17292B7182 July 1999Responds to 990623 RAI to Support Review of Evaluation of Planar Indication Found on Weld Number 24RRC(2)A-1 During 1998 ROSafe Shutdown Earthquake
Operating Basis Earthquake
ML17292B71630 June 1999Forwards Addl Info Requested in 990513 Ltr to Support Review of Pending Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves.Power-Operated Valves
ML17292B71329 June 1999Forwards Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps.
ML17292B70921 June 1999Forwards Proprietary Response to NRC 990603 RAI Re Licensee Request for Amend to MCPR Safety Limit Tss.Proprietary Info Withheld IAW Requirements of 10CFR2.790
ML17292B70417 June 1999Forwards NRC Forms 396 & 398 for Three Individuals Listed Below for Renewal of Operator Licenses.Without Encls
ML17292B70310 June 1999Forwards Response to NRC 990511 RAI Re License Request for Amend to Secondary Containment & SGTS Tss.Results of Addl Benchmark of Gothic Computer Code Performed to Demonstrate Modeling Capability of Drawdown Response,EnclEmergency Lighting
ML17292B6844 June 1999Forwards Response to NRC 990326 RAI Re WNP-2 GL 96-05 Program for Periodic Verification of design-basis Capability of MOVs
ML17292B6851 June 1999Forwards 1999 Quality Audit of WNP-2 Emergency Preparedness Program, Per NUREG-0654,Section Ii,Criteria P.9.Seven Problem Evaluation Requests & Nine Recommendations for Improvement Were Issued as Result of Audit Activities
ML17292B68325 May 1999Informs That Request for NRC Approval of Changes to Emergency Plan Requesting Reduction in on-shift HP Staffing, Is Retracted.Util Will Resubmit Request with Required Addl Info at Later Date
ML17292B67525 May 1999Forwards Proprietary ABB-CE Ltr Re WNP-2 Cycle 15 SLMCPR & Core Reload Design Rept,Per Util Request for Amend Re MCPR Safety Limits.Proprietary Info Withheld,Per 10CFR2.790Minimum Critical Power Ratio
ML17292B6667 May 1999Requests Exemption to Requirement in 10CFR55.59(a)(2) Re Annual Operating Test requirements.One-time Exemption from Requirement to Period Not to Exceed 15-months from Last Date of Passing Operating Exam for Licensee at FacilityExemption Request
ML17292B6533 May 1999Forwards Response to NRC 990402 RAI Re Licensed Operator Positive Drug Test.Encl Withheld,Per 10CFR2.790Fitness for Duty
ML17292B65629 April 1999Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Safe End & Calculation Mod Record CMR-98-0243, Fracture Mechanics Evaluation of N1A Nozzle Safe End, as Suppl Info to ISI ExamSafe Shutdown Earthquake
Operating Basis Earthquake
ML17292B64219 April 1999Responds to NRC 990319 Ltr Re Violations Noted in Insp Rept 50-397/99-01.Corrective Actions:Provisions Are Presently in Place to Maintain Adequate Level of Security
GO2-99-073, Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.79019 April 1999Forwards Rev 39 to WNP-2 Physical Security Plan,Per 10CFR50.54(p).Changes Do Not Decrease Effectiveness of Approved Plan.Encl Withheld IAW 10CFR73.21 & 10CFR2.790
ML17292B64013 April 1999Requests That WNP-2 Operator Requalification Program Be Granted one-time Extension Beyond Requirement in 10CFR55.59(a)(2) for Annual Operating Tests
ML17292B63712 April 1999Forwards Response to NRC 990211 RAI Re Util Request for Amend to Secondary Containment & SBGTS TS
ML17292B6286 April 1999Informs NRC That Insp Interval Ending Date for ISI Program Plan Has Been Extended by One Year to Dec 12,2005 Due to Changes in Plant Refueling Outage Schedule
GO2-99-060, Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)26 March 1999Submits Rept of Status of WNP-2 Decommissioning Fund as of 981231,IAW 10CFR50.75(f)(1)
ML17292B61324 March 1999Forwards Rev 0 to Calculation ME-02-98-04, Fracture Mechanics Evaluation of N1 Nozzle Safe End. Info Will Be Used to Assist NRC in Review of WNP-2 ISI Activities Associated with Evaluation of Planar Indication
ML17292B60016 March 1999Responds to Weakness Noted in Insp Rept 50-397/98-24. Corrective Actions:Developed Document to Identify Areas Needing Improvement,Assigned Responsibility for Actions & Provided Milestones for Achievement
ML17292B59916 March 1999Informs That Listed Property & Liability Insurance Coverage for WNP-2 Is in Force,In Compliance with Licensing Responsibilities Delineated in 10CFR50.54(w)(3)
ML17292B59416 March 1999Forwards NRC Form 396, Certification of Medical Exam by Facility Licensee, & NRC Form 398, Personal Qualification Statement - Licensee, for MD Comstock,Mc Naulty & RR Nelson.Without Encls
ML17292B59116 March 1999Forwards 1998 Environ Operating Rept, Per Reporting Requirements of Section 5.4.1 of WNP-2 Epp.No Design or Operational Changes or Tests in 1998 Involved Unreviewed Environ Question
ML17292B59011 March 1999Forwards Hard Copy of Addl Occupational Exposure Data Requested in GL 94-04,per 990303 e-mail.Original Electronic Version Was Corrupted
ML17292B5681 March 1999Forwards Radioactive Effluent Release Rept for 1998, IAW 10CFR50.36a(a)(2) & TS 5.6.3 & Complete Copy of WNP-2 ODCM Per TS 5.5.1Offsite Dose Calculation Manual
ML17292B56522 February 1999Forwards Relief Request 2ISI-20,proposing Alternate Exam Expected to Reduce Dose Significantly & Still Provide Adequate Safety & Quality.Attached Relief Request Will Be Used to Support ALARA Dose Reduction Efforts During Maint
ML17292B5584 February 1999Requests Change to Co Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier C/As.Change Requested to Reflect That Final Implementation of C/As Will Be Completed During Fall 1999 Not Spring 1999Fire Barrier
ML17292B5514 February 1999Forwards Copies of NRC Form 396 & 398 for Listed Individuals Who Will Be Taking NRC License Exam at WNP-2 During Week of 990308.Without Encls
ML17292B5603 February 1999Forwards COLR 98-14,rev 1,IAW Requirements of WNP-2 TS 5.6.5.COLR Was Revised to Change Certain MCPR Values
ML17292B5522 February 1999Forwards WNP-2 Fitness for Duty Semiannual Performance Data Rept for Jul-Dec 1998,per 10CFR26.71(d).Data Has Been Analyzed & Mgt Actions Have Been Taken to Enhance FFD ProgramFitness for Duty
ML17292B55029 January 1999Informs NRC That Amend 156 of Facility Ts,Issued by NRC on 990127,implemented on 990128
ML17292B53615 January 1999Informs That Go Smith Has Been Appointed Vice President, Generation/Plant General Manager.Updated Distribution List for NRC Correspondence,Encl
GO2-99-011, Forwards Rev 38 to Physical Security Plan,Per 10CFR50.54(p). Rev Does Not Decrease Effectiveness of Approved Plan.Encl Withheld,Per 10CFR2.790(a)(3)15 January 1999Forwards Rev 38 to Physical Security Plan,Per 10CFR50.54(p). Rev Does Not Decrease Effectiveness of Approved Plan.Encl Withheld,Per 10CFR2.790(a)(3)
ML17292B51828 December 1998Requests Change to Confirmatory Order Which Modified WNP-2 OL to Reflect Schedule for Implementing Thermo-Lag 330-1 Fire Barrier Corrective Actions,Per GL 92-08Fire Barrier
ML17292B49721 December 1998Forwards Plant Simulation Facility Four Year Rept,Per 10CFR55.45(b)(5)(ii)Shutdown Margin
Scram Discharge Volume
Power change
ML17292B49618 December 1998Responds to NRC 981112 Ltr Re Violations Noted in Insp Rept 50-397/98-20.Corrective Actions:Implemented Interim Actions to Assure That Significant Pressure Surges Do Not Occur in Plant Fire Protection SysSafe Shutdown
Enforcement Discretion
ML17292B47815 December 1998Forwards Addl Info Re Weld Examination Including Analytical Evaluation of Examination Results for Indication as Required by Subsection IWB-3134(b) of ASME Section XI,1989 Edition
ML17292B47110 December 1998Submits Guarantee of Payment of Deferred Premium in Compliance with 10CFR140.21
ML17292B4769 December 1998Provides Supplemental Info & Clarification of Proposed Rev 29 to Operational QA Program Description Submitted in 981023 Ltr
ML17284A8247 December 1998Responds to NRC 981106 Ltr Re Violations Noted in Insp Rept 50-397/98-15.Corrective Actions:Implemented ACs to Ensure That Adequate Supply of Water Is Maintained in Each Storage Tank to Provide Vol Suction Source for HPCS & RCIC PumpsReactor Vessel Water Level
Fire Barrier
ML17284A8193 December 1998Forwards WNP-2 Feedwater Nozzle Insp Rept for R-13 Maint & Refueling Outage.Rept Submitted Pursuant to Commitments Made in Response to NUREG-0619, BWR Feedwater Nozzle & Control Rod Drive Return Line Nozzle Cracking.Liquid penetrant
IR 05000397/199802012 November 1998Confirms Extension Until 981218,for Responding to Apparent Violation Identified in Insp Rept 50-397/98-20 & NOV Dtd 981016.Extension Allows Util to Provide Final Design Mod Description & Schedule for Implementation
ML17284A80912 November 1998Confirms Extension Until 981218,for Responding to Apparent Violation Identified in Insp Rept 50-397/98-20 & NOV Dtd 981016.Extension Allows Util to Provide Final Design Mod Description & Schedule for Implementation
ML17284A81112 November 1998Forwards Response to Violations Noted in Insp Rept 50-397/98-20.Corrective Actions:Replaced Air Operator & Cleaned 4-way Pilot Valve Associated with Floor Drain cross-connect Valve FDR-V-609
ML17292B45311 November 1998Responds to NRC 981108 Ltr Re Violations Noted in Insp Rept 50-397/98-18.Corrective Actions:Will Conduct Remedial Training for HP Technicians & Supervisors on Procedural Requirements & Will Procure Battery Powered Samples for OSC
ML17284A81211 November 1998Forwards Response to RAI Re GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment.Commercial Grade Dedication
Coatings
ML17284A79523 October 1998Forwards Rev 28 & Proposed Rev 29 to Operational QA Program Description, WPPSS-QA-004.Rev 28 Has Minor Change to Section 1.3.3.1.1 to Restructure Quality Svcs Group.Proposed Rev 29 Modifies Sections 1,2,4,6,12,15,18 & App I,Ii & III
ML17284A79115 October 1998Forwards Copies of NRC Forms 396 & 398 for Listed Individuals Taking NRC License Exam at WNP-2 During Wk of 981102.Without Encl
ML17284A77630 September 1998Informs NRC of Change to Commitment Made in Response to Violation Noted in Insp Rept 50-397/98-10 Re Reviews of Outage Exposure Goals.Spring Refueling Outage Rescheduled for Sept 1999.Dose Goals Review Will Be Conducted by 990331
ML17284A77930 September 1998Forwards Response to NRC 980730 RAI Re GL 96-06 Relative to Waterhammer & two-phase Flow in Containment Air Cooler Water Sys
ML17284A77730 September 1998Informs That Util Implemented Severe Accident Mgt Program with Issuance of Revised EOPs & Severe Accident Guidelines (Sags) on 980715,per Commitment in 950328 ltr.WNP-2 Eop/Sag Differences to BWROG Epg/Sag Noted in Encl App a
GO2-98-168, Requests That Severity Level of Wpps NOV (EA 97-138) Be Decreased to Either Severity Level IV or non-cited Violation.Util Would Like NRC to Provide Full Explanation If Such Action Is Not Warranted11 September 1998Requests That Severity Level of Wpps NOV (EA 97-138) Be Decreased to Either Severity Level IV or non-cited Violation.Util Would Like NRC to Provide Full Explanation If Such Action Is Not WarrantedEnforcement Discretion
Systematic Assessment of Licensee Performance
ML17284A74710 September 1998Forwards WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998, Per Section XI of ASME Boiler & Pressure Vessel Code Article IWA-6240
ML17284A7548 September 1998Requests Withdrawal of 980805 Proposed TS Amend,Modifying SR 3.8.4.7 to Allow Performance Discharge Test of SR 3.8.4.8 to Be Performed in Lieu of Battery Svc TestEnforcement Discretion
Nondestructive Examination
ML17292B43727 August 1998Forwards Response to Violations Noted in Insp Rept 50-397/98-14.Corrective Actions:Individuals Involved in Emergency Plan Rev Process Counseled Re Need to Ensure Emergency Plan Meets Requirements of 10CFR50 App E
ML17284A74419 August 1998Forwards Draft DOE/EA-1259, Environ Assessment for Wppss Sublease for Aluminum Smelter Plant, for NRC Review Prior to Finalization
ML17284A73218 August 1998Forwards fitness-for-duty semi-annual Performance Data Rept for 980101-0630,per 10CFR26.71(d).Data Has Been Analyzed & Mgt Actions Have Been Taken to Enhance ProgramFitness for Duty
ML17284A72713 August 1998Requests Withdrawal of 980717 Exigent TS Amend Request to SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2Enforcement Discretion
GO2-98-145, Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity12 August 1998Submits Response to 980514 RAI Re Reactor Pressure Vessel Integrity
ML17284A7258 August 1998Submits 90-day Response to GL 98-01, Year 2000 Readiness of Computer Sys at Nuclear Power Plants.
ML17292B42730 July 1998Forwards Response to Violations Noted in Insp Rept 50-397/98-09.Corrective Actions:Conducted Briefing with Mechanical Shop Personnel on Event,Stressing Need to Review & Comply W/All Procedural PrerequisitesHalf scram
Condition Adverse to Quality
ML17284A71528 July 1998Requests That Subject TS Amend Dtd 980717 Be Processed in Exigent Fashion So as to Reasonably Minimize Time Period During Which WNP-2 Is Operating Outside of Literal Compliance W/Ts Associated W/Lco 3.8.4Enforcement Discretion
Missed surveillance
ML17284A71023 July 1998Forwards LER 98-006-01,discussing Results of Root Cause Analysis & Addl Corrective Actions Taken to Rectify Deficiencies in Wnp,Unit 2,10CFR50,App R High Impedance Fault Calculations
GO2-98-129, Forwards Proprietary Rev to Annual Rept of Individual Monitoring. WNP-2.Occupational Doses of 47 Mrem & 31 Mrem for Two Individuals Have Been Deleted Because Doses Determined to Be Medical Doses.Rept Withheld22 July 1998Forwards Proprietary Rev to Annual Rept of Individual Monitoring. WNP-2.Occupational Doses of 47 Mrem & 31 Mrem for Two Individuals Have Been Deleted Because Doses Determined to Be Medical Doses.Rept Withheld
ML17284A69716 July 1998Requests Enforcement Discretion from TS Surveillance Requirement 3.8.4.7 for One Time Exemption for Completion of Battery Svc Test for Division 2,125 Vdc,Battery E-B1-2.TS Amend Request Is Being Submitted Under Separate CoverEnforcement Discretion
ML17292B42615 July 1998Responds to NRC 980618 Ltr Re Violations Noted in Insp Rept 50-397/98-10.Corrective Actions:Individual Has Been Designated W/Responsibility for Assuring Ssac Meeting Minutes Are Maintained Per Procedure
ML17284A69915 July 1998Forwards Copy of Scenario Package for Supply Sys'S 1998 NRC Graded Exercise to Be Conducted on 980916.Util Requests That NRC Review & Provide Comments No Later than 45 Days Prior to Exercise
ML17284A68614 July 1998Provides Addl Info Concerning 9.5 Plate Section W/Regards to Current WNP-2 P/T Limit Curves
ML17292B42013 July 1998Forwards Rev 20 to WNP-2 Emergency Plan IAW 10CFR50.4(b), 50.54(q) & 10CFR50,App E.Detailed Synopsis of Changes,Encl. Changes Do Not Reduce Effectiveness of PlanSafe Shutdown
Health Physics Network
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Internal Flooding
Safeguards Contingency Plan
Earthquake
Deep Dose Equivalent
Unidentified leakage
Siren
ML17284A6809 July 1998Provides Addl Perspective on Apparent Violation Noted in Insp Rept 50-397/98-01.Clearer Understanding of Issue Has Been Provided by Addl Testing & Analysis by Siemens Power Corp
IR 05000397/19980019 July 1998Provides Addl Perspective on Apparent Violation Noted in Insp Rept 50-397/98-01.Clearer Understanding of Issue Has Been Provided by Addl Testing & Analysis by Siemens Power Corp
ML20203G0291 July 1998Forwards Proposed Exam Outlines,Checklist & Security Agreement for SRO & RO License Exams Scheduled for Week of 981102 at WNP-2Safe Shutdown
High winds
Packing leak
High Radiation Area
Stroke time
Post Accident Monitoring
Contraband
Operating Basis Earthquake
Squib
Job Performance Measure
Scram Discharge Volume
Overtravel
Earthquake
Power change
Downpower
Flow Induced Vibration
Coast down
Unidentified leakage
ML17292B41730 June 1998Responds to NRC 980601 Ltr Re Violations Noted in Insp Rept 50-397/98-07.Corrective Actions:Plan Was Established & Implemented to Reduce Potential for Airborne Radioactivity & Surveys Were Conducted of Adjacent Areas Outside Wetwell
ML17284A67225 June 1998Submits Response to NRC Bulletin 96-03, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Vacuuming of Suppression Pool Scheduled During 1999 Refueling Outage. Licensee Maintains Foreign Matl Control Program
ML17284A66725 June 1998Informs That DW Coleman Has Been Appointed Regulatory Affairs Manager & Records Should Be Corrected to Reflect Change
ML17284A66119 June 1998Forwards LER 98-006-00 Discussing Items of Reportability, Corrective Action Taken & Action to Preclude Recurrence,Per 10CFR50.73
ML17284A66019 June 1998Documents Util Restart Commitment Subsequent to Recovery from Fire Header Line Break Which Resulted in Equipment Room Flooding