ML20214P615
ML20214P615 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 09/19/1986 |
From: | Lainas G Office of Nuclear Reactor Regulation |
To: | Butler W Office of Nuclear Reactor Regulation |
Shared Package | |
ML20214P025 | List:
|
References | |
FOIA-86-687 NUDOCS 8609230290 | |
Download: ML20214P615 (1) | |
Similar Documents at River Bend | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999
[Table view]Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209F6111999-07-12012 July 1999 Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236Q9371998-07-13013 July 1998 Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M1961998-06-0808 June 1998 Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216B1391998-03-10010 March 1998 Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20202G1681997-12-0303 December 1997 Forwards SRO Exam Rept Key for Exams Administered on 970728-0801 at Plant ML20202G1561997-12-0303 December 1997 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam,Administered on 970728-0801 at Plant,Unit 1 ML20199E6851997-11-18018 November 1997 Notification of Licensee Meeting W/Util on 971202 to Discuss Circumstances Surrounding Two Incidents on 970913 & 971004 ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20141H8111997-07-31031 July 1997 Notification of 970819 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Open Issues from Fire Protection Functional Insp Conducted at River Bend Station During July 1997.Meeting Agenda Attached ML20141H2321997-05-20020 May 1997 Revised Notification of 970717 Licensee Meeting W/Util in Arlington,Tx to Discuss Long Term Performance Improvement Plan.Date Changed from 970522 ML20141A7191997-05-12012 May 1997 Notification of 970520 Meeting W/Util in Rockville,Md to Discuss Proposed Removal of Leakage Control Sys on Main Steam Lines & Other Penetrations & to Increase Allowable Leak Rate for MSIVs ML20138K0821997-05-0808 May 1997 Notification of Licensee Meeting W/Util on 970522 in Arlington,Tx to Discuss Long Term Performance Improvement Plan ML20141B9371997-05-0808 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970127-0214 ML20203C0921997-04-23023 April 1997 Discusses Initiation of OI Rept 4-97-003 Re Falsification of Fire Watch logs.EA-97-184 Assigned to Track Case.Viewgraphs from 970602 Predecisional Enforcement Conference Encl ML20203C0871997-04-15015 April 1997 Requests Review of OI Rept 4-97-003 Issued 970411.OI Has Concluded That Deliberate Violation of Requirements Occurred ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20137K5231997-04-0101 April 1997 Notification of 970414 Meeting W/Util in Arlington,Tx to Introduce Entergy Mgt ML20147H4131997-03-31031 March 1997 Forwards SE Accepting Proposed P-T Limits for Heatup, Cooldown,Inservice Leak & Hydrostatic Testing & Core Criticality Acceptable to 12 Efpy.Salp Input Also Encl ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20136D5531997-03-10010 March 1997 Notification of 970313 Meeting W/Util in Rockville,Md to Discuss Proposed Program & Design for ECCS Strainers for Plant,In Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 1999-08-27 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20211H4441999-08-27027 August 1999
[Table view]Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209F6111999-07-12012 July 1999 Revised Notification of 990805 Meeting with Util to Discuss Radiation Protection Issues Identified in NRC Insps Repts 50-458/98-10 & 50-458/99-04 ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236Q9371998-07-13013 July 1998 Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M1961998-06-0808 June 1998 Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216B1391998-03-10010 March 1998 Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20202G1561997-12-0303 December 1997 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam,Administered on 970728-0801 at Plant,Unit 1 ML20202G1681997-12-0303 December 1997 Forwards SRO Exam Rept Key for Exams Administered on 970728-0801 at Plant ML20199E6851997-11-18018 November 1997 Notification of Licensee Meeting W/Util on 971202 to Discuss Circumstances Surrounding Two Incidents on 970913 & 971004 ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20141H8111997-07-31031 July 1997 Notification of 970819 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Open Issues from Fire Protection Functional Insp Conducted at River Bend Station During July 1997.Meeting Agenda Attached ML20141H2321997-05-20020 May 1997 Revised Notification of 970717 Licensee Meeting W/Util in Arlington,Tx to Discuss Long Term Performance Improvement Plan.Date Changed from 970522 ML20141A7191997-05-12012 May 1997 Notification of 970520 Meeting W/Util in Rockville,Md to Discuss Proposed Removal of Leakage Control Sys on Main Steam Lines & Other Penetrations & to Increase Allowable Leak Rate for MSIVs ML20138K0821997-05-0808 May 1997 Notification of Licensee Meeting W/Util on 970522 in Arlington,Tx to Discuss Long Term Performance Improvement Plan ML20141B9371997-05-0808 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970127-0214 ML20203C0921997-04-23023 April 1997 Discusses Initiation of OI Rept 4-97-003 Re Falsification of Fire Watch logs.EA-97-184 Assigned to Track Case.Viewgraphs from 970602 Predecisional Enforcement Conference Encl ML20203C0871997-04-15015 April 1997 Requests Review of OI Rept 4-97-003 Issued 970411.OI Has Concluded That Deliberate Violation of Requirements Occurred ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20137K5231997-04-0101 April 1997 Notification of 970414 Meeting W/Util in Arlington,Tx to Introduce Entergy Mgt ML20147H4131997-03-31031 March 1997 Forwards SE Accepting Proposed P-T Limits for Heatup, Cooldown,Inservice Leak & Hydrostatic Testing & Core Criticality Acceptable to 12 Efpy.Salp Input Also Encl ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20136D5531997-03-10010 March 1997 Notification of 970313 Meeting W/Util in Rockville,Md to Discuss Proposed Program & Design for ECCS Strainers for Plant,In Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 1999-08-27 |
Text
~ . .
l 7 8[g2 n:g'o,, g UNITED STATES NUCLEAR REGULATORY COMMISSION f ; W ASHINGTON, D. C. 20555
'% ,,,,+ September 19, 1986 KEMORANDUM FOR: Walter Butler, Director BWR Project Directorate f4 Division of BWR Licensing FROM: Gus Lainas, Assistant Director Division of BWR Licensing
SUBJECT:
RIVER BEND STATION, UNIT 1 TECHNICAL SFECIFICATION CHANGE TO CONTAINMENT ISOLATION VALVE TABLE By letters dated September 17, 1986 and September 19, 1986, Gulf States Utilities ~ Company proposed a one time change to the River Bend Station, Unit 1 Technical Specifications. The proposed change concerns removing the operability requirements from an automatic isolation valve in the 3/4 inch line that bypasses the RCIC inboard isolation valve associated with the steam supply line to the RCIC turbine. T of the proposed changes,he Facility with the Operations Plant Systems and Branch Reactor coordinated the review Systems Branches who had primary responsibility for the safety evaluation input. Enclosure 1 is the staff's Safety Evalution Report.
Enclosure 2 is the SALP input for this review.
W jGu Lainas, Assistant Director j Division of BWR Licensing i
Enclosures:
l As stated l
l cc w/ enclosures:
l W. Houston T. Spets W. Regan i V. Benaroya
- D. Vassallo
! J. Hulman W. Hodges
- S. Stern CONTACTS:
C. Schulten,SBL/F08, 49-29484 A. Notafransesco, DBL /PSB, 49-29444 G. Thomas, DBL /RSB '
Oumc=9c xy