ML20199E685

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Util on 971202 to Discuss Circumstances Surrounding Two Incidents on 970913 & 971004
ML20199E685
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/18/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
FACA, NUDOCS 9711210285
Download: ML20199E685 (5)


Text

. - _

4 M4 j

4 UNIT E D $TATES

{.

}[

  • t

- NUCLEAR REGULATORY COMMISSION -

d y.-

{

g REoloN IV k

8-811 RYAN PLAZA DRIVE. SulTE 400 9' " * * /

AR LINoToN, T E xAS 760118064 4

NOV 181997 NOTICE OF LICENSEE MEETING Name of Licensee:

Entergy Operations, Inc.

Name of Facility:-

River Bond Station Docket:

50-458 Date and Time December 2,1997 of Meeting:

1 p.m. (CST)

Location of Meeting:

Region IV Office, Arlington, Texas Executive Conference Room

' Purpose of Meeting:

To discuss circumstances surrounding two incidents. The first occurred on September 13,1997, and resulted in an inadvertent mode change; the second incident occurred on October 4,1997, and also involved a loss of shutdown cooling.

NRC Attendees:

E. Merschoff, Regional Administrator T. Gwynn, Director, Division of Reactor Projects (DRP)

A. Howell 111, Director, Division of Reactor Safety E. Collins, Chief, Project Branch C, DRP G. Sanborn, Enforcement Officer, Office of Regional Adminstrator J. Hannon, Project Director, Office of Nuclear Reactor Regulation (NRR)

D. Wigginton, Project Manager, NRR G. Replogie, Senior Resident inspector, DRP W. Smith, Senior Resident inspector, DRP M, Shannon, Acting Project Engineer, Project Branch C, DRP Licensee Attendees:

J, McGaha, Vice-President Operations J. Dimmette, General Manager, Plant Operations R. King, Director, Nuclear Safety and Regulatory Affairs D. Dormady, Manager, Performance and System Engineering W. O'Malley, Manager, Operations Unit 1 P. Sicard, Manager, Safety and Engineering Analysis f

\\

D L V

@$\\.E,E$ kESIE 9711210285 971118 l

PDR ADOCK 05000458 P

PDR l

t Entergy Operations, Inc.;,

=

NOTE: -

(1)

- This meeting is open to attendance by members of the general public.

(2)

. NRC personnel, not listed above, that desire to attend this meeting should notify Elmo Collins at (817) 860 8291 by COB on November 25,1997.

Approved By* _

/AMh__ --

'JJW6niasMygDirector Mivision of Reactor Projects cc:

John R. McGaha, Vice President - Operations River Bend Station

Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O.' Box 31995 -

Jackson, Mississippi 39286 1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995

' Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St.- Francisville, Louisiana 70775 Director Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 1St. Francisville, Louisiana 70775

b 9

Entergy Operations, Inc. Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippl 39205 Mark J. Wetterbahn, Esq.

Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005 3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiena 70775 The Honorable Richard P. leyoub Attorney General P.O. Box 94095 Baton Rouge, Louisiana 70804 9095 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Fo!!ciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Joint Ownership Manager Cajun Electric Power Coop. Inc.

P.O. Box 15540 Baton Rouge, Louisiana 70895 William H, Opell, Administrator Louisiana Radiation Protection Division

. P.O. Box 82135 Baton Rouge, Lou!siana 70884-2135

y

. er b i t ).

Enter 0y Operations, Inc. '-

g g g gg7 F-Mail to:

-EQB' o

-(

)-

NRC Attendees PMNS Mtg Announcement. Coordinator -

JKH DEDE PAB DEDR-FJM A/D/NRR -

ACT' Acting, ADT/NRR RPZ ADP/NRR OEMAll D/OE

.LJC.

OGC 4

CAH-C. A. Hackney, RSLO DMK1 -

D. M. Kunihiro, WCFO

~BWH B. Henderson, PAO MFH2 M. Hammond, PAO KEP K. Perkins, Director, WCFO JAC1,CJG RA Secretaries LAT, DLF,

~ DRP Division CLG,. LMB, NLH DRS Division CMS, WSW, CAM 3 DNMS Division

)

LSO L. Ousleyi

c.,c:

OEDO RIV Coordinator (SE6).

Receptionist

' - ORA File RIV File DRP File l

d

+d DOCUMENT NAME: R:\\_RB\\RB12 2MN.DRP

/

To receive copy of document. Indicato in box: "C" = Copy without enclosures "E" = Copy with epblosures "h" = No co;r/

TV:PE:DRP/C C:DRP/C PAO

. M RSLO pg D:DRP MPShannon;df @7c EECollinsC#f*

BWHenderson CAHackney TPGvyynn ff{

1p/y /97 1$/n /97 10/17/97 1$/ Gl97 10/pg97 f'

t

~

OFFICIAL RECORD COPY G-

,n.

P

p 5

.l j i'

y, t

I' )c-

,.. -NOV-- i 8 1997 Entergy' Operations, Inc.

-4 I

' E-Mail To:'

EQB 3

(

)

NRC Attendees PMNS

'Mtg Announcement Coordinator JKR-DEDE PAB.

DEDR FJM A/0/NRR ACT-Acting, ADT/NRR RPZ-ADP/NRR OEMAIL D/OE

. h

~ LJC OGC.

CAH C. A. Heckney, RSLO DMK1 D. M. Kunihiro, WCFO 10, - BWH B. Henderson, PAO

.MFH2 M. Hammond, PAO l

KEP K. Perkins, Directnr, WCFO JAC1,CJG-RA Secretaries '

y

- LAT, DLF, DRP Division '

CLG, LMB,NLH DRS Division CMS, WSW, CAM 3 DNMS Dbrision LSO L. Ousk :

cc:

DMB (IE 45)

OEDO RIV Coordinator (SE6)

Receptionist ORA File RIV File DRP File

$()N DOCUMENT NAME: R:\\_RB\\RB12-2MN.DRP.

To receive copy of document. Indicate in boxi"C" = Copy without onclosures "E"

  • Copy with uros *N" = No copy RIV:PE:DRP/C.

C:DRP/C PAO

$1; RSLO pg D:DRP MPShannon;df E9yo EECollinsGrpe BWHenderson -

CAHackney TPGwynn

/f)

, 1P/pl /97 19/11/97

}8/17/97 1$/ q/97 10/g97 p'

0FFIClAL RECORD COPY q

[ f m

,m,--

m

-gr

,-e