Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg
ML20216B139
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/10/1998
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9803120422
Download: ML20216B139 (5)


Text

4 p "% 4 UNITED STATES ye *g NUCLEAR REGULATORY COMMISSION g REGION IV 6 [ 611 RYAN PLAZA DRIVE. SUITE 400 f,*****,

f ARLINGTOE TFWAS 7en11 R'M4 MAR 101998 NOTICE OF LICENSEE MEETINGS Name of Licensee: Entergy Operations, Inc.

Name of Facility: River Bend Station Docket: 50-458 Date and Time (1) March 24,1998 of Meetings: 12 noon - 2 p.m. (CST)

(2) March 24,1998 j 2:15 - 3:30 p.m. (CST)

]

Location of Meetings: Region IV office, Arlington, Texas Training Conference Room ,

Purpose of Meetings: (1) To consider the licensee's assessment of their performance since February 1997 (2) To discuss the design basis of the standby gas treatment I system and its effect on operator access to the reactor building NRC Attendees: E. Merschoff, Regional Administrator j K. Brockman, Deputy Director, Division of Reactor Projects (DRP)

A. Howell Ill, Director, Division of Reactor Safety (DRS)

E. Collins, Chief, Project Branch C, DRP J. Hannon, Project Director, Office of Nuclear Reactor Regulation (NRR)

D. Wigginton, Project Manager, NRR G. Replogie, Senior Resident inspector, DRP g

f C. Marschall, Senior Project Engineer, Project Branch C, DRP /

R. Naase, Reactor Inspector, DRS Licensee Attendees: J. McGaha, Vice-President Operations R. King, Director, Nuclear Safety and Regulatory Affairs J. Dimmette, General Manager Plant Operations D. Pace, Director Engineering R. Roberts, Manager Project Outage

! W. Brian, Manager Mechanical Civil Engineering i

l t

0 58 ,

PDR L

Entergy Operations, Inc. NOTE:

(1) These meetings are open to atter. dance by members of the general public.

(2) NRC personnel, not listed above, that desire to attend either of these meetings should notify Elmo Collins at (817) h60-8291 by COB on March 22,1998.

Approved g Thomas P. Gwynn, irec Division of Reactor ro' cc:

John R. McGaha, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220

' St. Francisville, Louisiana 7C77.5 Executive Vice President and Chief Operating Officer

' Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

' P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775

Entergy Operations, Inc. Wise Carter, Child & Caraway

, P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Wmston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005-3502 Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General Department of Justice State of Louisiana

. P.O. Box 94005 Baton Rouge, Louisiana 70804-9095 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 1

I i

.L.

~ ..

Entergy Operations, Inc. -iMR I 0 1998 E-Mail To: EQB

() NRC Anendees PMNS- Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR

.ACT Acting. ADT/NRR .

RPZ ADP/NRR OEMAll D/OE LJC OGC j CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO 1 BWH B. Henderson, PAO

.KEP K. Perkins, Director, WCFO '

JAC1,CJG RA Secretaries i LAT, DLF, JES4 DRP Division l CLG, LMB, NLH DRS Division CMS, WSW, CAM 3 LAMS Division LSO L. Ousley cc:

DMB (IE 45)

OEDO RIV Coordinator (16E15)

Receptionist ORA File RIV File '

DRP File DOCUMENT NAME: R:\_RB\RB3-24MN.DRP Tc receive copy of document, Indicete in box: 'C" = Copy without nclosures "E" = Copy with enclosures "N" = No copy l- RIV;f5:DMP/C C:DBPjC PA 6 ,$ RSLO ('f/4 D:DRP /V '

CSN &!((fiffTdf EEC6Wn's BWNhnberson CAHackne'y TPGwynn 7f 3ff /98 O - 3/ 4 /98 3/ % /98 3/7 /98 3//[J /98 OFFICIAL RECORD COPY

Entergy Operations, Inc. MAR I 01998 E-Mail To: EQB

(-) NRC Att6ndeca PMNS Mtg Announcement Coordinator JKR DEDE PAB DEDR FJM A/D/NRR ACT Acting, ADT/NRR RPZ ADP/NRR OEMAll D/OE LJC OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO BWH B. Henderson, PAO KEP K. Perkins, Director, WCFO JAC1,CJG RA Secretaries 1 LAT, DLF, JES4 DRP Division CLG, LMB, NLH DRS Division i CMS, WSW, CAM 3 DNMS Division LSO L. Ousley cc:

MMMM OEDO RIV Coordinator (16E15)

Receptionist ORA File RIV File DRP File DOCUMENT NAME: R:\__RB\RB3-24MN.DRP To receive copy of document, indicate in box:"C" = Copy without Mnclosures "E" = Copy wth enclosures "N" = No copy l

RIV 5:g D$P/C C:DJ3PjC PA $ /4 RSLO ('StI . D:DRP N ',

CSMaYdtfslITdf EEC}Wn's BWMAnberson CAHackneV TPGwynn [f 3ff /98 Q 3/'/ /98 3/ % /98 3/9 /98 3//O /98 OFFICIAL RECORD COPY