|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217M6061999-10-20020 October 1999 Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211G2671999-08-27027 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Proposed TSs for Emergency Feedwater Sys at Waterford 3 ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20206F8831999-04-30030 April 1999 Informs That NRC Staff Will Discuss Encl Draft for RAI with Eoi,Re EOI Response to GL 95-07, Pressure Locking & Thermal Binding ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20204B3041999-03-15015 March 1999 Notification of Licensee Meeting with Util in Energy Svc Ctr,Grand Gulf Site on 990415 to Discuss Plant Performance Review Results.Meeting Open to Public ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20203H9511999-02-17017 February 1999 Notification of 990303 Meeting with Util in Rockville,Md to Discuss Technical & Scheduling Issues Associated with Active & Future Planned Licensing Actions ML20203H9411999-02-17017 February 1999 Notification of Meeting with Util on 990302 in Rockville,Md to Discuss Plant Plans for Steam Generator Tube Insp & Repairs During Future Unit 1 Outage Including Scheduling of Future TS Amend Requests for Potential SG Repairs ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20202C4591999-01-21021 January 1999 Operator Licensing Written Retake Exam Repts 50-313/98-303 & 50-368/98-303 Administered on 981218,with as Given Written Exam ML20199K0811999-01-21021 January 1999 Submits Outline & Initial Exam Submittal for Operator Licensing Written Retake Exam,Administered on 981228 ML20199B0421999-01-0707 January 1999 Notification of 990122 Meeting with Util in Rockville,Md to Discuss ANO Plans to Submit License Renewal Application for Unit 1 ML20198C8961998-12-16016 December 1998 Discusses Project Manager Guidance for risk-informed Confirmatory Orders on post-accident Hydrogen Monitoring ML20197J6251998-12-0909 December 1998 Revised Notification of Licensee Meeting with Licensee on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20196F3931998-11-30030 November 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980914-18 at ANO-1 IR 05000313/19983021998-11-30030 November 1998 Forwards Exam Rept 50-313/98-302 with as Given Written Exam for Test Administered on 980914-18 ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20206S6741998-10-29029 October 1998 Informs That During 980930-1002 ACRS 456th Meeting,Several Matters Discussed,Listed Repts & Ltrs Completed & Authorized Executive Director to Transmit Noted Memoranda ML20155A7071998-10-26026 October 1998 Notification of 981112 Meeting with Util in Arlington,Texas to Discuss Radiation Protection Program ML20154M1941998-10-14014 October 1998 Forwards Exam Rept with as Given Exam for Test Administered on 980831-0904 at Unit 2 ML20154N6851998-10-14014 October 1998 Informs That During 456th ACRS Meeting on 980930-1002, Committee Reviewed risk-informed Pilot Application for Monitoring Hydrogen Containment at Ano,Units 1 & 2 ML20154G0241998-10-0505 October 1998 Notification of 981014 Meeting with Util to Discuss Licensee Submittal Re Plant Mod to Address Concerns About Response to Potential Loss of Power to Plant Protection Sys at ANO-2. License Amend Submitted on 980630 ML20153F8051998-09-23023 September 1998 Notification of Licensee Meeting with Util on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20151X1651998-09-14014 September 1998 Notification of Significant Licensee Meeting W/Util on 980929 to Discuss Emergency Preparedness Activities & Issues ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E1581998-08-25025 August 1998 Notification of 980809 & 10 Meetings W/Energy Operations, Inc in Rockville,Md to Discuss Licensee Pilot Application for risk-informed ISI Program for Plant ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236R1371998-07-14014 July 1998 Notification of 980728 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Plans for Replacing SG at ANO-2 During Refueling Outage in 2000 1999-09-02
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217L8781999-10-21021 October 1999 Notification of 991102 Meeting with Util in Rockville,Md to Discuss General Organizational Changes as Well as Priorization & Scheduling Issues Associated with Future Licensing Activities ML20217M6061999-10-20020 October 1999 Notification of 991102 Meeting with Util in Port Gibson,Ms to Discuss Bases for Emergency Preparedness Plan Change Submitted in & Supplemented by 990120 & 0715 Ltrs ML20217C6851999-10-0707 October 1999 Notification of 991104 Meeting with Entergy Operations,Inc in Arlington,Texas to Discuss License Renewal for Ano,Unit 1 ML20211K7171999-09-0202 September 1999 Forwards Ineel Technical Ltr Rept, Evaluation of Fuel Pin Failure Timing in Boiling Water Reactors Dated 990730.Rept Used for Review of BWROG Rept on Revised Source Term Accident Analysis ML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211G2671999-08-27027 August 1999 Notification of 990909 Meeting with Util in Rockville,Md to Discuss Proposed TSs for Emergency Feedwater Sys at Waterford 3 ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20196F0391999-06-23023 June 1999 Notification of 990707 & 08 Meeting with EOI in Conference 1 at GGNS Energy Svc Ctr to Discuss Low Power Shutdown Risk Assessment Methods & Associated Probabilistic Risk Assessment Model ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G5241999-06-0909 June 1999 Notification of 990628 Meeting with Util in Rockville,Md to Provide Opportunity to Discuss Methodology & Results of Evaluation to Facilitate NRC Technical Staff Review ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207A2551999-05-18018 May 1999 Notification of 990603 Meeting with EOI in Rockville,Md to Discuss EOI Submittal on BWROG Source Term Analysis & Possible Related Future Amend Requests from EOI ML20206F8831999-04-30030 April 1999 Informs That NRC Staff Will Discuss Encl Draft for RAI with Eoi,Re EOI Response to GL 95-07, Pressure Locking & Thermal Binding ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20204B3041999-03-15015 March 1999 Notification of Licensee Meeting with Util in Energy Svc Ctr,Grand Gulf Site on 990415 to Discuss Plant Performance Review Results.Meeting Open to Public ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20203H9411999-02-17017 February 1999 Notification of Meeting with Util on 990302 in Rockville,Md to Discuss Plant Plans for Steam Generator Tube Insp & Repairs During Future Unit 1 Outage Including Scheduling of Future TS Amend Requests for Potential SG Repairs ML20203H9511999-02-17017 February 1999 Notification of 990303 Meeting with Util in Rockville,Md to Discuss Technical & Scheduling Issues Associated with Active & Future Planned Licensing Actions ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20199K0811999-01-21021 January 1999 Submits Outline & Initial Exam Submittal for Operator Licensing Written Retake Exam,Administered on 981228 ML20202C4591999-01-21021 January 1999 Operator Licensing Written Retake Exam Repts 50-313/98-303 & 50-368/98-303 Administered on 981218,with as Given Written Exam ML20199B0421999-01-0707 January 1999 Notification of 990122 Meeting with Util in Rockville,Md to Discuss ANO Plans to Submit License Renewal Application for Unit 1 ML20198C8961998-12-16016 December 1998 Discusses Project Manager Guidance for risk-informed Confirmatory Orders on post-accident Hydrogen Monitoring ML20197J6251998-12-0909 December 1998 Revised Notification of Licensee Meeting with Licensee on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20196F3931998-11-30030 November 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980914-18 at ANO-1 IR 05000313/19983021998-11-30030 November 1998 Forwards Exam Rept 50-313/98-302 with as Given Written Exam for Test Administered on 980914-18 ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20206S6741998-10-29029 October 1998 Informs That During 980930-1002 ACRS 456th Meeting,Several Matters Discussed,Listed Repts & Ltrs Completed & Authorized Executive Director to Transmit Noted Memoranda ML20155A7071998-10-26026 October 1998 Notification of 981112 Meeting with Util in Arlington,Texas to Discuss Radiation Protection Program ML20154M1941998-10-14014 October 1998 Forwards Exam Rept with as Given Exam for Test Administered on 980831-0904 at Unit 2 ML20154N6851998-10-14014 October 1998 Informs That During 456th ACRS Meeting on 980930-1002, Committee Reviewed risk-informed Pilot Application for Monitoring Hydrogen Containment at Ano,Units 1 & 2 ML20154G0241998-10-0505 October 1998 Notification of 981014 Meeting with Util to Discuss Licensee Submittal Re Plant Mod to Address Concerns About Response to Potential Loss of Power to Plant Protection Sys at ANO-2. License Amend Submitted on 980630 ML20153F8051998-09-23023 September 1998 Notification of Licensee Meeting with Util on 981216 in Arlington,Tx to Discuss Actions Being Implemented in Performance Improvement Plan for Selected Weaknesses Identified During Architect Engineer Insp ML20151X1651998-09-14014 September 1998 Notification of Significant Licensee Meeting W/Util on 980929 to Discuss Emergency Preparedness Activities & Issues ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237E1581998-08-25025 August 1998 Notification of 980809 & 10 Meetings W/Energy Operations, Inc in Rockville,Md to Discuss Licensee Pilot Application for risk-informed ISI Program for Plant ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236R1371998-07-14014 July 1998 Notification of 980728 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Licensee Plans for Replacing SG at ANO-2 During Refueling Outage in 2000 1999-09-02
[Table view] |
Text
,,.
MEMORANDUM TO:
John N. H:nnon, Director S:ptemb;r 8, 1998 v
Proj ct Dir:ctor:t3 IV-1 Division of R: actor Proj: cts lil/IV Offics of Nt: clear Reactor Regulation FROM:
David L. Wigginton, Senior Project Manager ORIG SIGNED BY:
Project Directorate IV-1 Division of Reactor Projects Ill/lV Office of Nuclear Reacter Regulation
SUBJECT:
FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC. REGARDING DEVELOPMENT OF A STANDARD QUALITY ASSURANCE PROGRAM PLAN FOR ALL ENTERGY SITES
&.___k__, A k W Y 0 0, -
DATE & TIME..
,,,~...mm, 8:00 am - 4:00 om LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North o.ggg 11555 Rockville Pike, Room 04w-i5 Rockville, Maryland PURPOSE:
To discuss the level of instructions and details for transferring quality assurance plan details from the current program plans at four sites to a standard quality assurance program plan for use at all sites. This is the forth meeting with Entergy on the subject.
The first draft of the proposed plan was submitted by letter dated April 30,1998. Issues currently under development from the review of the proposed plan will be discussed. Plant sites are Arkansas Nuclear One, Grand Gulf Nuclear Station, River Bond Station, and Waterford Steam Electric Station.
PARTICIPANTS:*
NEC UTILITY R. Gramrn S. Bethay, et at W. Haass B. Ford R. Smith C. Wells D. Wigginton Docket Nos. 50-313,50-368,50-416,50-458, and 50-382 cc: See next page CONTACT: David L. Wigginton, NRR b) 301-415-1301 1
- Meetings between NRC technical staff and applicants or licenseas are open for Interested
/
O members of the public, petitioners,intervenors, or other parties to attend as observers g
@$a, pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 d'y Federal Register 48340,9/20/94.
@g DISTRIBUTION: See next page g",'.G0 vtocument Name: RB092998.MTR '
'/
NU
/
I
$8 OFC Pl@D4-1 LA/PD4-1 D/Pp2 1
Dhnton/w/
CHawb Jbnron NAME k5, DATE
/ [ /98 7 /3 /98 4
/ 3/98 g,g g g'g g)pf COPY
/h/NO YES/NO
/NO i
" OFFICIAL RECORD COPY"
$1SS U G) b No CHANGE)St?
h$ kOOM) k UNITED STATES
- r il NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 3000 MOM
\\p**eiw)
September 8, 1998 MEMORANDUM TO:
John N. Hannen, Director l
Project Directorate IV-1 Division of Reactor Projects lil/IV Office of $Jcl ar Reactor Regulation FROM:
David L.
iggi nior Project Manager l
Project Directorate IV-1 i
Division of Reactor Projects lil/IV l
Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC. REGARDING DEVELOPMENT OF A STANDARD QUALITY ASSURANCE PROGRAM PLAN FOR ALL ENTERGY SITES uh Ocf f
/
irrt;.S:;tr.a2;,ff;;f DATE & TIME:
i 8:00 am -4:00 pm LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North C. g, d //
11555 Rockville Pike, Room 9 +6*thtS-Rockville, Maryland PURPOSE:
To discuss the level of instnactions and details for transferring quality assurance plan details from the current program plans at four s!;es to a standard quality assuranc6 program plan for use at all sites. This is the forth meeting with Entergy on the subject.
'l The first draft ofinc proposed plan was submitted by letter dated April 30,1998..lssues currentiy under development from the review of the proposed plan will be discussed. Plant cites are l
Arkansas Nuclear One, Grand Gulf Nuclecr Station, River Bend Station, and Waterford Staa n Eiectric Station.
PARTICIPANTS:'
ME; UIILlU.
l R. Gramm S. Bethg, et al W. Haass D. Ford 1
R. Smith C. Wells l
D. W;gginton l
L Docket Nos. 50 313,50-368,50416,50-458, and 50482 l
cc: See next page CONTACT: David L. Wgginton, NRR 301 415 1301 l
l
' Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenorr., or other parties to attend as observers pursuant to "Commiss!cn Policy Statement on Staff Meetings Open to the Public" 59 Federal Reainter 48340,9/20iTi4.
S If$ f6lSSUO b S//otd h, 0llAN01!? 00ATUlkeOM.
Meeting Notice dated:
September 8, 1998 Hard Cooy
- Docket FlWy PUBLIC i PD4-1 r/f.
OGC ACRS Receptionist (OWFN and TWFN)
/
vii-Mail SCollins/FMiragila (SJC1/FJM) i RZimmerman (RPZ)
BBoger (BAB2)
EAdensam (EGA1)
CHawes (CMH2)
DWigginton (DLW)
JHannon (JNH)
WHaass (WPH)
TMartin (SLM3)
RSmith (RJS6)
RGramm (RAG)
OPA TGwynn (TPG)
BHenderson (BWH)
THiltz (TGH)
PMNS l
P
/
J
. _. -. _ _ _ _ _ _. ~. _ _ _ _ _. _. _. _ _ _ _ _.... _ _ _. _ _ _.. _.. _
l Entergy Operations, Inc.
Arkansas Nuclear One, Units 1 & 2 cc:
Executive Vice President Vice President, Operations Support
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operatbns, Inc.
P. O. Box 31995 P. O. Box 31995 Jackson, MS 39286-1995 Jackson, MS 39286-1995 l
Cirector, Division of Radiation Wise, Carter, Child & Caraway l
Control and Emergency Management P. O. Box 651 l
Arkansas Department of Health Jackson, MS 39205 l
4815 West Markham Street, Slot 30 l
Little Rock, AR 72205-3867 Mr. C. Randy Hutchinson Vice President Operations, ANO Entergy Operations, Inc.
Winston & Strawn 1448 S. R. 333 l
1400 L Street, N.W.
Russellville, AR 72801-l Washington, DC 20005-3502 Manager, Rockville Nuclear Licensing Framatone Technologies 1700 Rockville Pike, Suite 525 Rockville, MD 20852 Senior Resident inspector U.S. Nuclear Regulatory Commission P. O. Box 310 4
London, AR 72847 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 County Judge of Pope County l
Pope County Courthouse Russellville, AR 72801 l
l
0 Entergy Operations, Inc.
Grand Gulf Nuclear Station cc:
Executive Vice President General Manager, GGNS
& Chief Operating Officer Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box 756 P. O. Box 31995 Port Gibson, MS 39150 Jackson, MS 39286-1995 Attomey General Wise, Carter, Child & Caraway Department of Justice P. O. Box 651 State of Louisiana Jackson, MS 39205 P. O. Box 94005 Baton Rouge, LA 70804-9005 Winston & Strawn 1400 L Street, N.W. - 12th Floor State Health Officer Washington, DC 20005-3502 State Board of Health P. O. Box 1700 Director Jackson, MS 39205 Division of Solid Waste Management Mississippi Department of Natural Office of the Govemor.
Resources State of Mississippi P. O. Box 10385 Jackson, MS 39201 Jackson, MS 39209 Attomey General President, Asst. Attomey General Claibome County Board of Supervisors State of Mississippi P. O. Box 339 P. O. Box 22947 Port Gibson, MS 39150 Jackson, MS 39225 Regional Administrator, Region IV Vice President, Operations Support U.S. Nuclear Regulatory Commission Entergy Operations, Inc.
611 Ryan Plaza Drive, Suite 1000 P.O. Box 31995 Arlington,TX 76011 Jackson, MS 39286-1995 Senior Resident inspector Director, Nuclear Safety U. S. Nuclear Regulatory Commission and Regulatory Affairs P. O. Box 399 Entergy Operations,Inc.
Port Gibson, MS 39150 P.O. Box 756 Port Gibson, MS 39150 Mr. Joseph J. Hagan Vice President, Operations GGNS Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
t i
Mr. Randall K. Edington Entergy Operations, Inc.
River Bend Station cc:
Winston & Strawn Executive Vice President and 1400 L Street, N.W.
Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 Manager-Licensing Jackson, MS 39286 Entergy Operations, Inc.
River Bend Station General Manager-Plant Operations P. O. Box 220 Entergy Operations, Inc.
St. Francisville, LA 70775 River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775
)
P. O. Box 1050 St. Francisville, LA 70775 Director-Nuclear Safety Entergy Operations, Inc.
President of West Feliciana River Bend Station Police Jury P. O. Box 220 P. O. Box 1921 St. Francisville, LA 70775 St. Francisville, LA 70775 Vice President-Operations Support Regional Administrator, Region IV Entergy Operations, Inc.
U.S. Nuclear Regulatory Commission P. O. Box 31995 611 Ryan Plaza Drive, Suite 1000 Jackson, MS 39286-1995 Arlington,TX 76011 Attomey General Ms. H. Anne Plettinger State of Loulslana 3456 Villa Rose Drive P. O. Box 94095 Baton Rouge, LA 70806 Baton Rouge, LA 70804-9095 Administrator Wise, Carter, Child & Caraway Loulslana Radiation Protection Division P. O. Box 651 P. O. Box 82135 Jackson, MS 39205 Baton Rouge, LA 70884-2135 e
L, i**
Entergy Operations, Inc.
Waterford 3 cc:
Administrator Regional Administrator, Region IV j
Loulslana Radiation Protection Division U.S. Nuclear Regulatory Commission Post Office Box 82135 611 Ryan Pitza Drive, Suite 1000 Baton Rouge, LA 70884 2135 Arlington,TX 76011 Vice President, Operations Resident inspector /Waterford NPS Support Post Office Box 822 Entergy Operations, Inc.
Killona, LA 70066 P. O. Box 31995 Jackson, MS 39286 Parish President Council St. Charles Parish Director P. O. Box 302 Nuclear Safety & Regulatory Affairs Hahnville,LA 70057 Entergy Operations, Inc.
P. O. Box B Executive Vice President Killona, LA 70066 and Chief Operating Officer Entergy Operations,Inc.
Wise, Carter, Child & Caraway P. O. Box 31995 P. O. Box 651 Jackson, MS 39286-1995 Jackson,MS 39205 Chairman General Manager Plant Operations Louisiana Public Service Commission Entergy Operations, Inc.
One American Place, Suite 1630 P. O. Box B Baton Rouge, LA 70825-1697 Killona, LA 70066 Licensing Manager Vice President Operations Entergy Operations, Inc.
Entergy Operations, Inc.
P. O. Box B P. O. Box B Killona, LA 70066 Killona,LA 70066 Winston & Strawn 1400 L Street, N.W.
Washington, DC 20005-3502 i
,_