ML20136D553

From kanterella
Jump to navigation Jump to search
Notification of 970313 Meeting W/Util in Rockville,Md to Discuss Proposed Program & Design for ECCS Strainers for Plant,In Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs
ML20136D553
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/10/1997
From: Wigginton D
NRC (Affiliation Not Assigned)
To: Beckner W
NRC (Affiliation Not Assigned)
References
IEB-96-003, IEB-96-3, NUDOCS 9703120401
Download: ML20136D553 (4)


Text

. _. _ _ __

. - - - ~ - -

T I

MEMORANDUM T0:

Williaa D. Beckner, Director March 10, 1997 Project Directorate IV-1 l

l Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation FROM:

David L. Wigginton, Project Manager ORIGINAL SIGNED BY:

Project Directorate IV-1 i

Division of Reactor Projects III/IV i

Office of Nuclear Reactor Regulation

SUBJECT:

MEETING ON ECCS STRAINERS FOR RIVER BEND STATION DATE & TIME:

Thursday, March 13, 1997 8:00 am to 11:00 am 4-LOCATION:

One White Flint North 11555 Rockville Pike Rockville, Maryland Room 0-6-B-13 PURPOSE:

Discuss the proposed program and design for.the Emergency ooling System (ECCS) strainers for the River Bend-Core c Sts; *.. This is in response.to NRC Bulletin 96-03, 1

" Pot.ential Plugging of ECCS Strainers By Debris in Boiling i

Water Reactors."

1

  • PARTICIPANTS:

NBC Utilities D. Wigginton Rick King R. Elliot~

.B. Burmister D. Lynch Dan Pace C. Berlinger J. Lynch 4

M. Marshall R. Cole R. Lobel

'T. Green, GE A..Serkiz K. Kavanaugh J. Kudrick Docket No. 50-458 CONTACT: David Wigginton 301-415-1301 l

cc: See next page

  • Meetings between the NRC technical staff, and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on

~ Staff Meetings Open to the Public," 59 Federal Reaister 48340, dated September 20, 1994.

DLSIRIBUTION:

See next page l

9, j

r 9703120401 970310

~

PDR ADOCK 050004S8 P...

PDR

~

n-

.~

i

'Q Kity

}

g UNITED STATES s'

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20066-0001 49*****

,o March 10,1997 MEMORANDUM TO:

William D. Beckner, Director Project Directorate IV-1 i

Division of Reactor Projects III/IV i

l Office f Nuclear Reactor Regulation j'

FROM:

David L.

igginton, Project Manager Project Directorate IV-1 1

Division of Reactor Projects III/IV l

Office of Nuclear Reactor Regulation l

SUBJECT:

MEETING ON ECCS STRAINERS FOR RIVER BEND STATION DATE & TIME:

Thursday, March 13, 1997 l

8:00 as to 11:00 am j

LOCATION:

One White Flint North 11555 Rockville Pike Rockville, Maryland Room 0-6-B-13 PURPOSE:

Discuss the proposed program and design for the Emergency i

Core Cooling System (ECCS) strainers for the River Bend i

Station. This is in response to NRC Bulletin 96-03,

" Potential Plugging of ECCS Strainers By Debris in Boiling 4

i Water Reactors."

  • PARTICIPANTS:

EG Utilities D. Wigginton Rick King i

R. Elliot B. Burmister i

D. Lynch Dan Pace i

C. Berliriger J. Lynch M. Marshall R. Cole l

R. Lobel T. Green, GE A. Serkiz K. Kavanaugh

{

J. Kudrick Docket No. 50-458 4

i CONTACT: David Wiggiriton j

301-415-1301 cc: See next page

  • Meetings between the NRC technical staff, and applicants or licensees are

'i open for interested r. embers of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public," 59 Federal Reoister 48340, dated 3

September 20, 1994, i

4

j....

j Entergy Operations, Inc.

River Bend Station cc:

Winston & Strawn Executive Vice President and l

1400 L Street, N.W.

Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.

i P. O. Box 31995 j

Manager - Licensing Jackson, MS 39286 Entergy Operations, Inc.

4 River Bend Station General Manager - Plant Operations P. O. Box 220 Entergy Operations, Inc.

St. Francisville, LA 70775 River Bend Station P. O. Box 220 l

Director St. Francisville, LA 70775 4

Joint Operations Cajun 10719 Airline Highway Director - Nuclear Safety P. O. Box 15540 Entergy Operations, Inc.

Baton Rouge, LA 70895 River Bend Station P. O. Box 220 4

Senior Resident Inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support 1

Entergy Operations, Ir.c.

1 President of West Feliciana P. O. Box 31995 4

Police Jury Jackson, M.S 39286-1395 l

P. O. Box 1921 l

St. Francisville, LA 70775 Attorney General i

State of Louisiana i

Regional Administrator, Region IV P. O. Box 94095 U.S. Nuclear Regulatory Commission Baton Rouge, LA 70804-9095 I

611 Ryan Plaza Drive, Suite 1000 l

Arlington, TX 76011 Wise, Carter, Child & Caraway l

P. O. Box 651 Ms. H. Anne Plettinger Jackson, MS 39205 3456 Villa Rose Drive i

Baton Rouge, LA 70806 Vice President & Controller Cajun Electric Power Cooperative 1

Administrator 10719 Airline Highway 2

Louisiana Radiation Protection Division P.O. Box 15540 i

P. O. Box 82135 Baton Rouge, LA 70895 Baton Rouge, LA 70884-2135 Mr. John R. McGaha 1

Vice President - Operations J

Entergy Operations, Inc.

l River Bend Station i

P.O. Box 220 St. Francisville, LA 70775 4

j i

4 DISTRIBUTION:

[W E$h?

2 PUBLIC PD4-1 r/f DWigginton OGC (0-15B18)

-ACRS E-Mail R. Zimmerman (RPZ)

J. Roe (JWR)

E. Adensam (EGA1)

W. Beckner (WDB)

C. Hawes (CMH2)

E. Jordan (e-mail to JKR)

OPA PMNS S. Collins (SJC1)

C. Berlinger (CHB)

R. Elliot (RBE) 1 D. Lynch (MDL)

M. Marshall- (MXM2)

R. Lobel (RML)

A. Serkiz-(AWS)

K. Kavanaugh (KAK)

J. Kudrick (JAK1)

J. Mitchell' (JAM)

B. Henderson (BWH)

A. Howell, RIV (ATH)

Document Name:

RB031397.MTR OFC PM/PDkA/-

NAME DWig N n/vw DATE-3 / /0 /97 COPY h/N0 0FFICIAL RECORD COPY I

T i

f

,_-