ML20236Q937

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp
ML20236Q937
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/13/1998
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9807210134
Download: ML20236Q937 (4)


Text

_ -,

<y UNIT ED ST ATES gW4 t

NUCLEAR REGULATORY COMMISSION

., e REGloN IV g

g 611 RY AN PLAZA DRIVE, SulTE 400 ARLINGTON, TEXAS 76011-8064 9

Jll I 31998 NOTICE OF LICENSEE MEETING Name of Licensee:

Entergy Operations, Inc.

Name of Facility:

River Bend Station Docket:

50-458 Date and Time July 29,1998,11 a.m. to 5 p.m.

of Meeting:

Location of Meeting: Region IV Training Conference Room (4th floor)

Arlington, Texas Purpose of Meeting: Working Meeting to discuss the results of the River Bend Fire Protection FunctionalInspection (FPFI)

NRC Attendees:

Arthur T. Howell 111, Director, Division of Reactor Safety Thomas F. Stetka, Acting Chief, Engineering Branch, Division of Reactor Safety (DRS)

Russell L. Bywater, Reactor Engineer, Engineering Branch (DRS)

Elmo E. Collins, Chief, Project Branch C K. Steven West, Plant Systems Branch, Office of Nuclear Reactor Regulation Patrick M. Madden, Plant Systems Branch, Office of Nuclear Reactor Regulation Phillip M. Qualls, Plant Systems Branch, Office of Nuclear Reactor Regulation David L. Wigginton, Project Manager, PDIV-1 Licensee Attendees: Bob Azzarello, Manager, Electrical and I&C Design Engineering Patricia Campbell, Technical Assistant, Nuclear Safety and Regulatory Affairs Rudy Kerar, Senior Engineer, Electrical Engineering Vince Bacanskas, Senior Lead Technical Specialist Rick McAdams, Senior Staff Engineer, Nuclear Safety and Regulatory Affairs J. Maher, Senior Engineer, Safety analysis Department NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Tom Sietka at (817) 860-8247 by COB on July 23,1998.

ti 9 Approved By:

o Arthur T. Ho ell Ill,'DirectYP Division of eactor Safety DISTRIBUTION:

See next page I

cc:

I

?-

9907210134 990713 PDR ADOCK O 4y8 G

L 4

c Entergy Operations, Inc.

FPFI Workshop July 29,1998 i l

CC:

John R. McGaha, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

i P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 i

Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

Winston & Strawn 1401 L Street, N.W..

Washington, D.C, 20005-3502 I

i

4 Entergy Operations, Inc.

FPFI Workshop July 29,1998 Manager-Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 l

l l

1

r-1 Entergy Operations, Inc.

FPFI Workshop July 29,1998 E-Mail To:

EQB (JED1, ATH, TPG, TFS, RLB1, EEC, KSW, PMM, PMQ, DLW)

NRC Attendees PMNS Mtg Announcement Coordinator JKR DEDE f

~

PAB DEDR FJM A/DINRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR (DLW)

Project Manager, NRR OEMAll D/OE j

LJC OGC CAH C. A. Hackney, RSLO i

DMK1 D. M. Kunihiro, WCFO l

GFS-G. F. Sanborn, EO BWH B. Henderson, PAO KEP K. Perkins, Director, WCFO JAC1,CJG RA Secretaries LAT, DLF, JES4 DRP Division l

CLG, LMB, NLH DRS Division CMS, CAM 3, WSW DNMS Division LSO L. Ousley LPL P.Longdo j

cc:

DMB (IE 45) 4 OEDO RIV Coordin'ator (16E15)

ORA File RIV File i

C OC i.1O i

i DOCUMENT NAME: r;\\ rb\\rb729mt. tis 1

To receive copy of document. Indicate in box:"C" = Copy without enclosue "E" = Copy with encbsures "N" = No copy l

lRIV:AC:EB PAO RSL4Ti,_

D:DRS /

l lTFStetkalimb @

BWHenderson WP CAHa3 M ATHMlllli l07/p/98 07/ /98 074(198T 07Q()

OFFICIAL RECORD'COPi

_