March 31, 1997 MEMORANDUM TO:
William D.'Beckner, Project Director Project Directorate IV-1 Division of Reactor Projects, III & IV FROM:
Keith R. Wichman. Section Chief Material Integrity Section Materials and Chemical Engineering Branch Division of Engineering
SUBJECT:
RIVER BEND STATION: PRESSURE TEMPERATURE LIMITS EVALUATION License:
Entergy Operations Incorporated TAC No..
M97834 Review Status:
Complete By-letter dated January 10. 1997, the licensee submitted changes related to the pressure-temperature (P-T) limits in the River Bend Station Technical' Specifications (TS).
The licensee revised the P-T. limits to provide.new limits that are valid to 12 effective full power years (EFPY).
Based on our evaluation of the submittal we conclude that the proposed P-T limits for heatup, cooldown, inservice leak and hydrostatic testing'and' core criticality are acceptable to 12 EFPY, and may be ' incorporated in the River Bend Station TS.
4 Our evaluation is submitted as Attachment l' and our'SALP input is submitted.as~.
This completes our efforts for TAC NO. N97834.,,
z 4;
Docket No.:
50-458
Attachment:
As stated cc:
D. Wigginton J. Strosnider CONTACT:
A.D. Lee NRR 415-2735 DIS"RIBUTION-
- MeilMiMD" EMCB RF/PF PUBLIC JStrosnider MMayfield G:\\ LEE \\RIVERBND.P T
- See Previous Concurrence Toreceiveacopyofthisdocument.IndicateintheboxC-Copyw[dattachment/enclosureE-Copy with attachment / enclosure N - No copy
/
l OFFICE DE:EMCB*
DE:EMCB C
DEIEdik O
h NAME Alee BElliot fa%
K M an DATE 3/28/97 331/97 3SF97 I
l 03000 9704030109 970331 PDR ADOCK 05000458 l
P PDR