ML20138K082

From kanterella
Jump to navigation Jump to search
Notification of Licensee Meeting W/Util on 970522 in Arlington,Tx to Discuss Long Term Performance Improvement Plan
ML20138K082
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/08/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9705120136
Download: ML20138K082 (5)


Text

- . .. ~- . - . . . - . . . . - - - - - . . - . - - . - - . - - ~ - - - - - ,

I p" " %4 UNITED ST 4TES

  • f q y,j 4 *
NUCLEAR REGULATORY COMMISSION [

5 4

.! [ .1c g',.

RecioN iv S f* ^ [ 611 RYAN PL AZA DRIVE, SUITE 400 k

  • 8 ARLING TEX 7e 8064 NOTICE OF LICENSEE MEETING Name of Licensee: Entergy Operations, Inc. (EOl) 1 Name of Facility: River Bend Station Docket: 50-458 l

Date and Time May 22,1997 j j of Meeting: 1 p.m. (CDT) '

4 i Location of Meeting Region IV

Training Conference Room l Arlington, Texas j Purpose of Meeting: Discuss the Long Term Performance Improvement Plan 1

NRC Attendees: J. Dyer, Deputy Regional Administrator i T. Gwynn, Director, Division of Reactor Projects (DRP)

W. D. Beckner, Director, Project Directorate IV-1 (PDIV-1)

Office of Nuclear Reactor Regulation j P. Harrell, Chief, Project Branch D, DRP G. Pick, Senior Project Engineer, Project Branch D, DRP G. Werner, Project Engineer, Project Branch D, DRP Licensee Attendees: J. McGaha, Vice President, Operations l

- R. King, Director, Nuclear Safety & Regulatory Affairs

. D. Pace, Director, Engineering M. Bellamy, Director, Site Support 4

R. Douet, Manager, Plant Maintenance W. O'Malley, Manager, Operations

, NOTE:

(1) This meeting is open to attendance by members of the general public.

I (2) NRC personnel, not listed above, that desire to attend this meeting should notify l Greg Werner at 817-860-8269 by COB on May 15,1997.

l

/ ,.- ,

Approv .

Thomas P. Gwy n, D' ec r >

Division of Reac roje ts 4 i

DISTRIBUTION:

see next page 4

9705120136 970508 PDR ADOCK 05000458 P PDR

,,m . . -- ,

. . . - . . . . . _ _ . . . . . . . _ . - - - - . - - - - . _ _ _ _ _ . . .. ...... .. ~ . . . .. -. .

i 1

5 j i j Entergy Operations, Inc. j i

i 1 1-l' cc: '

i. John R. McGaha, Vice President - Operations l River Bend Station Entergy Operations, Inc.

P.O. Box 220

St. Francisville, Louisiana 70775 i

j Executive Vice President and

, Chief Operating Officer  !

i Entergy Operations, Inc.

P.O. Box 31995 ,

. Jackson, Mississippi 39286-1995 i

! Vice President i Operations Support  :

Entergy Operations, Inc.

j P.O. Box 31995 .

j Jackson, Mississippi 39286 1995 l l General Manager

!- Plant Operations River Bend Station

! Entergy Operations, Inc.

P.O. Box 220 l St. Francisville, Louisiana 70775

! Director - Nuclear Safety l 1 Rr;sr Bend Station l Entergy Operations, Inc.  !

i P.O. Box 220 l St. Francisville, Louisiana 70775 1

i Wise, Carter,. Child & Caraway l P.O. Box 651 i

! ' Jackson, Mississippi 39205 )

! Mark J. Wetterhahn, Esq.- l 4 Winston & Strawn  !

- 1401 L Street, N.W.
. Washington, D.C. 20005-3502 i

i 1

i.

J T

. _ _ _ . , - . . . _ , ~ , _ _ _ _ _ . _ _ , . ~ . , . , , _ . _ _

Entergy Operations, Inc. l l

Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub  ;

Attorney General P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 H. Anne Plettinger 3456 Villa Rose Drive i Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury i P.O. Box 1921 '

St. Francisville, Louisiana 70775 l

l l Larry G. Johnson, Director I

Systems Engineering Cajun Electric Power Coop. Inc.

10719 Airline Highway l P.O. Box 15540 Baton Rouge, Louisiana 70895 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 i Baton Rouge, Louisiana 70884-2135 i

l l

l i-

Entergy Operations, Inc. MAY 8 1997 E-Mail To: FOR (6) NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DED0 PAB H. L. Thompson, DEDS DLW D. L. Wigginton, PM, NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAIL J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB,CLG,DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley

- KEP K. E. Perkins, Director, WCF0 WFS W. F. Smith, SRI, River Bend cc:

D;1B (IE 45)

OED0 RIV Coordinator (17G21)

Receptionist ORA File RIV File 1

DOCUMENT NAME:

To receive copy of dgument. Indicatop box: "pk = opy without enclosures "E" = Copy with enclosures "N" = No copy PE:DRD ,M C:DK/qjgPAO gl. RSLO (Du D:DRP A/

GEV9eir R$fi f f PHH)rg BWHenderson CAHackney TPGwynn (/7 5/(-/9J \' g@ 5/@% ' 5/~//97 5/7/97 5$/97 (/

\

\ ' OFFICIAL RECORD COPY

Entergy Operations, Inc. 4 MAY 8 1997 E-Mail To: FOR (6) NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DED0 PAB H. L. Thompson, DEDS DLW D. L. Wigginton, PM, NRR ACT A. C. Thadani, ADT/NRR RPZ R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE LJC L. J. Chandler, OGC CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG, DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley KEP K. E. Perkins, Director, WCF0 WFS W. F. Smith, SRI, River Beno cc:

D*18 (IE 45)

OEDO RIV Coordinator (17G21) /

Receptionist j/

ORA File p RIV File DOCUMENT NAME:

To receive copy of dgument. indicate 3 box: "d = opy without enclosures "E" = Copy with enclosures "N" = No copy PE:DMD ,M. C:DK/Q jgPAO lyk RSLO % D:DRP A/

GEVfejrgjdfi f f PHH$rg BWHenderson CAHackney TPGwynn ((7 5/(./9)(' g@ 5/(g% ' 5/7/97 5/7/97 SQ/97 (/

\

\ ' OFFICIAL RECORD COPY j l

12000~ l I.llll!I.l!I,IllI,llll 1.1

. _ _ . . _ _ . . . .