|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236Q9371998-07-13013 July 1998 Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M1961998-06-0808 June 1998 Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216B1391998-03-10010 March 1998 Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20202G1561997-12-0303 December 1997 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam,Administered on 970728-0801 at Plant,Unit 1 ML20202G1681997-12-0303 December 1997 Forwards SRO Exam Rept Key for Exams Administered on 970728-0801 at Plant ML20199E6851997-11-18018 November 1997 Notification of Licensee Meeting W/Util on 971202 to Discuss Circumstances Surrounding Two Incidents on 970913 & 971004 ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20141H8111997-07-31031 July 1997 Notification of 970819 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Open Issues from Fire Protection Functional Insp Conducted at River Bend Station During July 1997.Meeting Agenda Attached ML20141H2321997-05-20020 May 1997 Revised Notification of 970717 Licensee Meeting W/Util in Arlington,Tx to Discuss Long Term Performance Improvement Plan.Date Changed from 970522 ML20141A7191997-05-12012 May 1997 Notification of 970520 Meeting W/Util in Rockville,Md to Discuss Proposed Removal of Leakage Control Sys on Main Steam Lines & Other Penetrations & to Increase Allowable Leak Rate for MSIVs ML20138K0821997-05-0808 May 1997 Notification of Licensee Meeting W/Util on 970522 in Arlington,Tx to Discuss Long Term Performance Improvement Plan ML20141B9371997-05-0808 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970127-0214 ML20203C0921997-04-23023 April 1997 Discusses Initiation of OI Rept 4-97-003 Re Falsification of Fire Watch logs.EA-97-184 Assigned to Track Case.Viewgraphs from 970602 Predecisional Enforcement Conference Encl ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20203C0871997-04-15015 April 1997 Requests Review of OI Rept 4-97-003 Issued 970411.OI Has Concluded That Deliberate Violation of Requirements Occurred ML20137K5231997-04-0101 April 1997 Notification of 970414 Meeting W/Util in Arlington,Tx to Introduce Entergy Mgt ML20147H4131997-03-31031 March 1997 Forwards SE Accepting Proposed P-T Limits for Heatup, Cooldown,Inservice Leak & Hydrostatic Testing & Core Criticality Acceptable to 12 Efpy.Salp Input Also Encl ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20136D5531997-03-10010 March 1997 Notification of 970313 Meeting W/Util in Rockville,Md to Discuss Proposed Program & Design for ECCS Strainers for Plant,In Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20134P1751997-02-14014 February 1997 Notification of Licensee Meeting W/Licensee on 970318 in St Francisville,La to Present Results of SALP Rept ML20236M9111997-01-24024 January 1997 Describes Views on Broader Compliance Policy Concerns Associated W/River Bend Case Which Involves Complex Enforcement Policy Issues Associated W/Relationship Between Appropriate Use of Plant Administrative Controls 1999-08-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211H4441999-08-27027 August 1999 Notification of Significant Meeting with Util on 990916 & 17 in Arlington,Tx to Improve Utility & NRC Understanding of Industry & Regulatory Perspectives on Current Issues ML20211E1491999-08-23023 August 1999 Notification of Licensee Meeting with Util on 990830 to Discuss Recent Refueling Maint Outage ML20209G2421999-07-14014 July 1999 Notification of 990722 Meeting with License in Rockville, MD to Discuss Changes in EOI Licensing Organization Including Division of Responsibilities within New EOI Corporate Licensing Group ML20209D8271999-07-0707 July 1999 Notification of 990719 Licensee Meeting in Arlington,Tx to Discuss Failed Fuel Recovery Project ML20196G0321999-06-24024 June 1999 Notification of 990726 Meeting with Util to Discuss Radiation Protection Issues ML20195F8811999-06-10010 June 1999 Notification of 990622 Meeting with Util in Rockville,Md to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207E9231999-06-0202 June 1999 Notification of 990611 Meeting with EOI in Rockville, Maryland to Be Briefed by EOI & to Discuss Related Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation ML20207G3761999-06-0202 June 1999 Revised Notification of 990611 Meeting with EOI in Rockville,Maryland to Discuss Issues Associated with Fuel Integrity Problems Experienced During Recent Cycle 8 Operation.Meeting Cancelled ML20205R8871999-04-20020 April 1999 Notification of 990504 Meeting with Util in Rockville,Md to Discuss Proposal to Submit Consolidated Security Plan for Util Sites ML20196K9471999-04-0606 April 1999 Notification of Significant Licensee Meeting with Util on 990420 to Discuss Results of Most Recent NRC Plant Performance Review ML20205C4481999-03-29029 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990222-0303 IR 05000458/19993011999-03-29029 March 1999 Forwards NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222-0303 ML20207K9161999-03-11011 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss River Bend Station Engineering Program & Performance with Project,Maintenance & Engineering Branch Personnel ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20195G1121998-11-17017 November 1998 Notification of 981201-02 Meeting with Entergy Operations in Taft,Louisianna to Conduct Joint Workshop for Licensing Personnel from Entergy & Nrc,Project Directorate IV-1 ML20195F1691998-11-12012 November 1998 Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs ML20151U7971998-09-0808 September 1998 Notifies of 980929 Meeting with Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan ML20153H6671998-09-0808 September 1998 Revised Notification of 981007 Meeting with Util to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites to Std Program Plan at All Sites.Originally Scheduled for 980929 ML20151T6141998-09-0303 September 1998 Notification of Licensee Meeting W/Util on 980910 in Arlington,Tx to Discuss Plant Performance W/Regional Administrator & Division Directors ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20237A2811998-08-12012 August 1998 Notification of 980827 Meeting W/Nrc & Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring QA Plan Details from Current Program Plans at Four Sites ML20236Q9371998-07-13013 July 1998 Notification of Licensee Meeting W/Entergy Operations,Inc on 980729 in Arlington,Tx to Discuss Results of Plant Fire Protection Functional Insp ML20249A2101998-06-11011 June 1998 Notification of 980702 Meeting W/Util in Rockville,Md to Discuss Level of Instructions & Details for Transferring Quality Assurance Plan Details from Current Program Plans at Four Sites to Std Quality Assurance Program Plan for Site ML20248M1961998-06-0808 June 1998 Notification of Significant Licensee Meeting W/Util on 980626 in Arlington,Tx Re Predecisional EC to Discuss Apparent Violation of 10CFR50.9 ML20216D6351998-04-13013 April 1998 Notification of 980416 Meeting W/Util in Rockville,Md to Discuss Entergy Operations,Inc Initial Proposal to Standardize Security Plans for Listed Plants ML20217E8471998-03-26026 March 1998 Notification of Significant Licensee Meeting W/Util on 980402 to Discuss Entergy Operations,Inc Annual Performance Assessment ML20216B1391998-03-10010 March 1998 Notification of Significant Licensee Meeting W/Util on 980324 to Consider Licensee Assessment of Performance Since Feb 1997 & to Discuss Design Basis of Standby Gas Treatment Sys & Effect on Operator Access to Reactor Bldg ML20197B8721998-03-0505 March 1998 Notification of 980401 Meeting W/Util in Jackson,Ms to Discuss Licensing Issues & Regulatory Performance Efficiencies W/Licensing Staff for Plants.Meeting Agenda Encl ML20203B4131998-02-0505 February 1998 Notification of 980319 Meeting W/Entergy Operations,Inc,In Rockville,Md to Discuss Level of Instructions & Details of Transferring QA Plan Details from Current Program Plans at Four Sites to Standard QA Program Plan for Use at All Sites ML20198M8351998-01-12012 January 1998 Notification of 980122 Meeting W/Util in Rockville,Md to Discuss Site Licensing Status for Listed Plants & to Explore Ways to Standardize Licensing Submittals & Issuances ML20202G1561997-12-0303 December 1997 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam,Administered on 970728-0801 at Plant,Unit 1 ML20202G1681997-12-0303 December 1997 Forwards SRO Exam Rept Key for Exams Administered on 970728-0801 at Plant ML20199E6851997-11-18018 November 1997 Notification of Licensee Meeting W/Util on 971202 to Discuss Circumstances Surrounding Two Incidents on 970913 & 971004 ML20198K0791997-10-15015 October 1997 Notification of 971022 Meeting W/Entergy Operations,Inc in Rockville,Md Re Standard Quality Assurance Manual for Entergy Sites ML20141H8111997-07-31031 July 1997 Notification of 970819 Meeting W/Entergy Operations,Inc in Rockville,Md to Discuss Open Issues from Fire Protection Functional Insp Conducted at River Bend Station During July 1997.Meeting Agenda Attached ML20141H2321997-05-20020 May 1997 Revised Notification of 970717 Licensee Meeting W/Util in Arlington,Tx to Discuss Long Term Performance Improvement Plan.Date Changed from 970522 ML20141A7191997-05-12012 May 1997 Notification of 970520 Meeting W/Util in Rockville,Md to Discuss Proposed Removal of Leakage Control Sys on Main Steam Lines & Other Penetrations & to Increase Allowable Leak Rate for MSIVs ML20138K0821997-05-0808 May 1997 Notification of Licensee Meeting W/Util on 970522 in Arlington,Tx to Discuss Long Term Performance Improvement Plan ML20141B9371997-05-0808 May 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 970127-0214 ML20203C0921997-04-23023 April 1997 Discusses Initiation of OI Rept 4-97-003 Re Falsification of Fire Watch logs.EA-97-184 Assigned to Track Case.Viewgraphs from 970602 Predecisional Enforcement Conference Encl ML20137W6841997-04-15015 April 1997 Notification of 970502 Meeting W/Listed Attendees in Jackson,Mi.Meeting Agenda Encl ML20203C0871997-04-15015 April 1997 Requests Review of OI Rept 4-97-003 Issued 970411.OI Has Concluded That Deliberate Violation of Requirements Occurred ML20137K5231997-04-0101 April 1997 Notification of 970414 Meeting W/Util in Arlington,Tx to Introduce Entergy Mgt ML20147H4131997-03-31031 March 1997 Forwards SE Accepting Proposed P-T Limits for Heatup, Cooldown,Inservice Leak & Hydrostatic Testing & Core Criticality Acceptable to 12 Efpy.Salp Input Also Encl ML20137C9201997-03-20020 March 1997 Forwards Documentation of Meeting Conducted in Region 4 Office on 970225 to Discuss NRC Enforcement Policy as Applied to Nonescalated Enforcement ML20136D5531997-03-10010 March 1997 Notification of 970313 Meeting W/Util in Rockville,Md to Discuss Proposed Program & Design for ECCS Strainers for Plant,In Response to NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs ML20134P2231997-02-20020 February 1997 Discusses Ti 2515/122 Evaluation or Rosemount Pressure Transmitter Performance & Licensee Enhanced Surveillance Programs multi-plant Action B-122 ML20134M2471997-02-14014 February 1997 Submits List of Plants Not Meeting Selection Criteria for Ti 2515/118 Insp on Basis of Factors Such as SWS Operating Experience,Contribution of SWS to Plant Risk Assessment, Licensee Programs in Response to GL-89-13 ML20134P1751997-02-14014 February 1997 Notification of Licensee Meeting W/Licensee on 970318 in St Francisville,La to Present Results of SALP Rept ML20236M9111997-01-24024 January 1997 Describes Views on Broader Compliance Policy Concerns Associated W/River Bend Case Which Involves Complex Enforcement Policy Issues Associated W/Relationship Between Appropriate Use of Plant Administrative Controls 1999-08-27
[Table view] |
Text
. MEMORANDUM T0: James W. Clifford, Acting Director July 31, 1997 Project Directorate IV-1, DRPW FROM:
David L. Wigginton, Senior Project Manager ORIG SIGNED BY:
Project Directorate IV-1, DRPW
SUBJECT:
FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC. REGARDING FIRE PROTECTION FUNCTIONAL INSPECTION ISSUES DATE & TIME:
August 19, 1997 9:00am until 4:00pm LOCATION:
U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike Rockville, Maryland 20852-2738 Room T-2 B 3 PURPOSE:
To discuss the open issues from the Fire Protection Functional Inspection conducted at the River Bend Station during July 1997.
The meeting agenda is attached.
PARTICIPANTS:* MC UTILITY T. Martin John McGaha G. Holahan Rick King T. Marsh Dan Pace S. West Vince Bacanskas P. Madden Paul Sicard P. Qualls Bryan Ford D. Wigginton Bill O'Malley C. Vandenburgh Docket No.
50-458
Attachment:
Meeting Agenda cc w/att:
See next page CONTACT:
D. Wigginton, NRR
\\
301-415-1301 I
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.
QLSlRIBUTION:
See next page Document Name:
RB081997.HTR OFC PMkD4tl/
NAME DWikdMon/vw DATE 7 R [/97
[E3/N0 COPY E
0FFICIAL' RECORD COPY DR DO 05000458 G
PDR
- "'%g k
UNITED STATES g
g j
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2006 Hoot
'+9*****
July 31, 1997 MEMORANDUM T0: James W. Clifford, Acting Director Project D rectorat, IV-1, DRPW FRON:
David L.
ggtnton?SeniorProjectManager Project Directorate IV-1, DRPW
SUBJECT:
FORTHCOMING MEETING WITH ENTERGY OPERATIONS, INC. REGARDING l
FIRE PROTECTION FUNCTIONAL INSPECTION ISSUES 1
DATE & TIME:
August 19, 1997 9:00am until 4:00pm LOCATION:
U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Rockville, Maryland 20852-2738 Room T-2 B 3
)
PURPOSE:
To discuss the open issues from the Fire Protection Functional Inspection conducted at the River Bend Station during July i
1997. The meeting agenda is attached.
PARTICIPANTS:* NK UTILITY T. Martin John McGaha G. Holahan Rick King T. Marsh Dan Pace S. West Vince Bacanskas P. Madden Paul Sicard P. Qualls Bryan Ford
- 0. Wigginton Bill O'Malley C. Vandenburgh Docket No.
50-458
Attachment:
Meeting Agenda cc w/att: See next page CONTACT:
D. Wigginton, NRR 301-415-1301
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.
i
Entergy Operations, Inc; River Bend Station ec:
)
Winston & Strawn-Executive Vice President and 1400 L Street, N.W.
Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 Manager - Licensing Jackson, MS 39286 i
Entergy Operations, Inc.
River Bend Station General Manager - Plant Operations i
P. O. Box 220 Entergy Operations, Inc.
St. Francisville, LA 70775 River Bend Station i
P. O. Box 220 Director St. Francisv111e, LA 70775 Joint Operations Cajun 10719 Airline Highway Director - Nuclear Safety P. O. Box 15540 Entergy Operations, Inc.
Baton Rouge, LA 70895 River Bend Station P. O. Box 220 j
Senior Resident Inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.
President of West Feliciana P. O. Box 31995 Police Jury Jackson, MS 39286-1995 P. O. Box 1921 St. Francisville, LA 70775 Attorney General State of Louisiana Regional Administrator, Region IV P. O. Box 94095 i
U.S. Nuclear Regulatory Commission Baton Rouge, LA 70804-9095 j
i 611 Ryan Plaza Drive, Suite 1000
{
Arlington, TX 76011 Wise, Carter, Child & Caraway P. O. Box 651 Ms. H. Anne Plettinger Jackson, MS 39205 1
3456 Villa Rose Drive i
Baton Rouge, LA 70806 Vice President & Controller l
Cajun Electric Power Cooperative Administrator 10719 Airline Highway Louisiana Radiation Protection Division P.O. Box 15540 P. O. Box 82135 Baton Rouge, LA 70895 4
j Baton Rouge, LA 70884-2135 1
Mr. John R. McGaha Vice President - Operations
).
Entergy Operations, Inc.
River Bend Station P.O. Box 220 St. Francisville, LA 70775 i
FIRE PROTECTION FUNCTIONAL INSPECTION RIVER BEND STATION POST-FIRE SAFE SHUTDOWN CAPABILITY ISSUES AUGUST 19. 1997 WASHINGTON DC AGENDA I.
OPENING REMARKS II.
RIVER BEND STATION (RBS) LICENSING AND DESIGN BASIS FOR SAFE SHUTDOWN ANALYSIS (SSA)
III.
FIRE-INDUCED CIRCUIT FAILURES AND COMPLIANCE WITH NRC GUIDANCE AND REQUIREMENTS IV.
RBS SSA AND ALTERNATIVE SAFE SHUTDOWN CAPABILITY V.
MECHANISTIC SSA VI.
SAFETY RELIEF VALVE SYSTEM CONDITION DESCRIPTION, LOSS-0F-0FFSITE-POWER DESIGN, AND FUNCTION VII. STANDBY SERVICE WATER PUMP CONDITION DESCRIPTION, DESIGN, AND FUNCTION VIII. ADDITIONAL RBS ACTIONS IX.
SUMMARY
X.
CLOSING REMARKS
)
ATTACHMENT
-~
~
Meetina Notice - For Meeting Notice dated E-Mail HARD COPY S. Collins /F. Miraglia (SJC1/FJM) 1 Docket File R. Zimmerman (RPZ)
PUBLIC J. Roe (JWR)
PDIV-1 r/f E. Adensam (EGA1)
OGC J. Clifford (JWC)
ACRS D. Wigginton (DLW)
Receptionist (0WFN & TWFN)
C. Hawes (CMH2)
D. Ross (SLM3)
OPA' T. P. Gwynn (TPG)
B. Henderson (BWH)
M. Hammond (MFH2)
T. Martin (TTM)
G. Holahan (GMH)
T. Marsh (LBM)
S. West (KSW)
P. Madden (PMM)
P. Qualls (PMQ)
C. Vandenburgh (CAV)
PMNS T. Hiltz (TGH)
-