ML20195F169

From kanterella
Jump to navigation Jump to search
Notification of 981123 Meeting with Entergy Operations,Inc in Arlington,Tx to Discuss Apparent Inoperability of Divs I & II Emergency DGs
ML20195F169
Person / Time
Site: River Bend 
Issue date: 11/12/1998
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
EA-98-478, NUDOCS 9811190205
Download: ML20195F169 (4)


Text

,

  1. psergk UNITED STATES

[

g NUCLEAR REGULATORY COMMISSION

.D E

REGION IV P4

(;

611 RYAN PLAZA DRIVE, SUITE 400 g * * * * *,o ARLINGTON, TEXAS 76011-8064 November 12, 1998 NOTICE OF LICENSEE MEETING i

Name of Licensee:

Entergy Operations, Inc.

Name of Facility:

River Bend Station Docket:

50-458 E A N o.:

98-478 Date and Time November 23,1998, at 12:30 p.m. CDT of Meeting:

Location of Meeting:

Region IV Office, Arlington, Texas 4th floor, Training Conference Room Purpose of Meeting:

Predecisional Enforcement Conference to Discuss Apparent l

inoperability of Division I and II Emergency Diesel Generators NRC Attendees:

Ellis Merschoff, Regional Administrator Dwight Chamberlain, Deputy Director, Division of Reactor Safety Charles Marschall, Chief, Project Branch C l

Lawrence Ellershaw, Senior Reactor Inspector i

George Replogie, Senior Resident inspector Michael Vasquez, Enforcement Specialist Licensee Attendees:

Randall Edington, Vice President, Operations Dwight Mims, General Manager, Plant Operations Danny Pace, Director Design Engineering i

Rick King, Director-Nuclear Safety & Regulatory Affairs j

William O'Malley, Manager-Operations Paul Sicard, Manager-Safety & Engineering Analysis i

Daniel Dormady, Manager-Performance & System Engineering David Lorfing, Supentisor-Licensing William Brian, Manager-Mechanical / Civil Engineering Joseph Mead, Supervisor-System Engineering Mike Krupa, Manager-Corporate Assessments Brian Fichtenkort, Senior Engineer I

i 9811190205 981112 PDR ADOCK 05000458 P

PI)R A

Entergy Operations, Inc. NOTE:

(1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Dr.

Dale Powers at 817/860-8195 by COB on November 18,1998.

Approved By:

Arth&r T. Howell, Ill, Director, Division of Reactor Safety cc:

- Randall K. Edington, Vice President - Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiaan 70775 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety.

River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 L _......

Entergy Operations, Inc. 1 Wise, Carter, Child & Caraway P.O. Box 651 Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

t Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005-3502

. Manager - Licensing River Bend Station Entergy Operations, Inc.

.P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General Department of Justice State of Louisiana P.O. Box 94005 Baton Rouge, Louisiana 70804-9005 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 l

William H. Spell, Administrator Louisiana Radiation Protection Division i

P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 1

i

^

l Entergy Operations, Inc. l E-Mail To:

FOR (DDC, LEE 1, CM, EM, GR, GS, GMV)

NRC Attendees PMNS Mtg Announcement Coordinator l

JKR DEDE i

i PAB DEDR l

FJM A/D/NRR BWS Acting, ADT/NRR BAB2 Acting ADP/NRR (RF )

Rober Fretz, Project Manager, NRR l

OEMAIL D/OE l

CAH C. A. Hackney, RSLO GFS G. F. Sanborn, EO BWH B. Henderson, PAO JAC1,CJG RA Secretaries LAT, DLF, JES4 DRP Division CLG, LMB, NLH DRS Division CMS, WSW DNMS Division PDP Dean Papa LPL P.Longdo i

Cc:

DMB (IE 45)

OEDO RIV Coordinator (16E15)

ORA File RIV File l

\\

g I

DOCUMENT ME: R:\\_RB\\RB813MN. LEE To receive copy ument, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy l

RIV: SRI:MB @g fcMB l6 PAO 8h# RSLO I

D:DR5\\fjf l /

I LEEllershahW DAPowers nd['

BWHendersW CAHackneyCM ATHofelllid 11/j298 119/98 11 6/98 11/f98 11/U98 U

OFFICIAL RECORD COPY t

I

  1. , I, z.,~v t

.