ML20141H232

From kanterella
Jump to navigation Jump to search
Revised Notification of 970717 Licensee Meeting W/Util in Arlington,Tx to Discuss Long Term Performance Improvement Plan.Date Changed from 970522
ML20141H232
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/20/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9705230228
Download: ML20141H232 (6)


Text

M 88%

UNITED STATES f

/

NUCLEAR REGULATORY COMMISSION f,13 i

3, R EGioN iv

- S I' J'

611 RY AN PLAZA DRIVE, SUITE 400

%,, ]>", /

AR LING NT X S7 11 8064 REVISED REVISED REVISED REVISED i

NOTICE OF LICENSEE MEETING Name of Licensee:

Entergy Operations, Inc. (EOl)

' Name of Facility:

River Bend Station Docket:

50-458 Date and Time July 17,1997 (This is a date change from 5/22/97) of Meeting:

1 p.m. (CDT)

~

Location of Meeting Region IV Training Conference Room Arlington, Texas Purpose of Meeting:

Discuss the Long Term Performance improvement Plan NRC Attendees:

E. Merschoff, Regional Administrator T. Gwynn, Director, Division of Reactor Projects (DRP)

A. Howell, Director, Division of Reactor Safety W. D. Beckner, Director, Project Directorate IV-1 (PDIV-1)

Office of Nuclear Reactor Regulation i

P. Harrell, Chief, Project Branch D, DRP G. Werner, Project Engineer, Project Branch D, DRP Licensee Attendees:

J. McGaha, Vice President, Operations R. King, Director, Nuclear Safety & Regulatory Aff airs D. Pace, Director, Engineering M. Bellamy, Director, Site Support i

R. Douet, Manager, Plant Maintenance W. O'Malley, Manager, Operations h

NOTE:

U (1)

This meeting is open to attendance by members of the general public.

(2)

NRC personnel, not listed above, that desire to attend this meeting should notify Greg Werner at 817-860-8269 by COB on July 14,1997.

q

,-m b~

((

Approved Bg homas P. Gwynn, Qiregor t

Division of Reactor PrWects DISTRIBUTION:

see next page -

innusum 6 4 5

A 0 8 9705230228 970520 U

zPDR ADOCK 05000458 P

PDR ja s

T

- Entergy ' Operations,- Inc.

2-cc:

John R. McGaha,'Vice President - Operations

. River Bend Station Entergy Operations, Inc.

P.0, Box 220 '

. St.' Francisville, Louisiana 70775 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995

' Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 General Manager Plant Operations River Bend Station '

Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Director - Nuclear Safety River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 Wise, Carter, Child & Caraway P.O. Box 651

. Jackson, Mississippi 39205 Mark J. Wetterhahn, Esq.

I

..Winston & Strawn 1401 L Street, N.W.

Washington, D.C. 20005 3502--

e Entergy Operations, Inc. Manager - Licensing River Bend Station Entergy Operations, Inc.

P.O. Box 220 St. Francisville, Louisiana 70775 The Honorable Richard P. leyoub Attorney General l

P.O. Box 94095 Baton Rouge, Louisiana 70804-9095 H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, Louisiana 70806 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, Louisiana 70775 Larry G. Johnson, Director Systems Engineering Cajun Electric Power Coop. Inc.

10719 Airline Highway i

P.O. Box 15540 Baton Rouge, Louisiana 70895 William H. Spell, Administrator Louisiana Radiation Protection Division P.O. Box 82135 1

Baton Rouge, Louisiana 70884-2135 1

s Entergy Operations, Inc. MAY 201997 E-Mail To:

E03 (6)

NRC Attendees PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDS DLW D. L. Wigginton, PM, NRR ACT A. C. Thadani, ADT/NRR -

RPZ R. P. Zimmerman, ADP/NRR OEMAIL J. Lieberman, D/OE

~

LJC L. J. Chandler, OGC

,CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO '

GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO

'[

4 JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG, DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley KEP K. E. Perkins, D! rector, WCFO WFS W. F. Smith, SRI, River Bend cc:

DMB (IE 45)

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File DOCUMENT NAME:

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

)

PE:DRP/D, C:DRP/D _

n PAO RSLO GEti D:DRP M

_n GEPick;cr@X PHHarreQM BWHenders6n CAHackney TPGwynn (/'/[

5/1 /97 5/ >*/97 V

5/20 /97 5/k /97 5/b4 /97 V

0

)

OFFIC AL RECORD COPY

?

.i-

- \\

l Entergy. Operations, inc. MAY 201997 E-Mail To:

. f_03 (6)

NRC Attendees j

. PMNS Mtg Announcement Coordinator JKR E. L. Jordan, DEDO PAB H. L. Thompson, DEDS.

DLW D. L. Wigginton, PM, NRR ACT A. C. Thadani, ADT/NRR RPZ.

R. P. Zimmerman, ADP/NRR OEMAll J. Lieberman, D/OE

~

LJC L. J. Chandler, OGC

~CAH C. A. Hackney, RSLO DMK1 D. M. Kunihiro, WCFO GFS G. F. Sanborn, EO BWH B. Henderson, PAO MFH2 M. Hammond, PAO JAC1, CMS, CJG RA Secretaries LAT, DLF, CAM 3 DRP Division LMB, CLG, DXY DRS Division CLS1, NLH, WSW DNMS Division LSO Linda Ousley KEP K. E. Perkins, Director, WCFO WFS W. F. Smith, SRI, River Bend r'

cc:

(DMB_ (IE'46);

OEDO RIV Coordinator (17G21)

Receptionist ORA File RIV File t

9 DOCUMENT NAME:

To receive copy of document. Indicate in box: "C" = Copy without enclosures "E" a Copy wth enclosures "N" = No copy lPE:DRP/D C:DRP/D,

n PAO M

RSLO Qggj D:DRP g

n l GEPick;cr@'

PHHarreQK BWHenders6n CAHackney TPGwynn y]

l5/39 /97 ~

5/ A*/97 J

5/3B /97 5/Je /97 5124 /97 OFFICIAL RECORD COPY n

v

~_

I e

g>"

  • f %i UNITED STATES e

NUCLEAR REGULATORY COMMISSION

+

REGloN IV

?s

,p 611 RYAN PLAZA DRIVE, SulTE 400 he,......F AR LINGToN, TEXAS 760118064 May 8,1997 NOTICE OF LICENSEE MEETING Name of Licensee:

Entergy Operations, Inc. (EOI)

Name of Facility:

River Bend Station Docket:

50-458 I

Date and Time May 22,1997 of Meeting:

1 p.m. (CDT)

Location of Meeting Region IV Training Conference Room Arlington, Texas Purpose of Meeting:

Discuss the Long erm erfor ance improvement Plan NRC Attendees:

J. Dyer, Dep e

na ministrator T. Gwynn, irect r,

on of Reactor Projects (DRP)

W. D. Bec 1er, Di ecto, Project Directorate IV-1 (PDIV-1)

Office of uclea R ctor Regulation P. Hartpit, C 'ef, r ject Branch D, DRP Senio ject Engineer, Project Branch D, DRP G. Pic G. W rner Pro' ct Engineer, Project Branch D, DRP Licensee Attendees:

M 1a ice President, Operations

+

Kin ector, Nuclear Safety & Regulatory Affairs D.

ace irector, Engineering

?.

I my, Director, Site Support

[

D et, Manager, Plant Maintenance

) 'Malley, Manager, Operations NOTE:

(1)

This t eetin. is n to attendance by members of the general public.

(2)

NC rson e, not listed above, that desire to attend this meeting should notify reg Wern at 817 860-8269 by COB on May 15,1997.

//s//

Approved By:

Thomas P. Gwynn, Director Division of Reactor Projects DlS IBUTION:

s next page 1