ML17298B822

From kanterella
Jump to navigation Jump to search
Forwards QA Program for Fire Protection & Detection Sys During Const & Startup Phases,Per NRC Deviation Item 50-528/84-25-03
ML17298B822
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/09/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17298B825 List:
References
ANPP-31658-EEVB, NUDOCS 8501230068
Download: ML17298B822 (2)


Text

Arizona Nuclear Poorer ProJect 1~.,'II 8 '7 P.O. BOX 52034 o PHOENIX, ARI2ONA 85072-2034 l;.b5 JllH January 9, 1985 ANPP-31658-EEVB/WEX/MFg U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. F. Kixsch, Acting Director Division of Reactor Safety and Projects Subj ect: NRC Deviation Item 50-528/84-25-03 Quality Assurance Program Applied To The Fire Protection/Detection Systems At PVNGS File: 85-019-026; D.4.33.2

Dear Sir:

Per your request, attached is the Quality Assurance Program Description which is applied to the Palo Verde Nuclear Generating Station's Fire Protection/Detection Systems during the construction and startup phases.

Very truly urs E. E.'Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVB/WEE/plk Attachment cc: R. Zimmerman P. Narbut A. Gehr 860 00b8 05OO 52

~ -~

I p.-=)

~

50i~~ocK PDR nomic PDR F

V I

)