ML17298B822
| ML17298B822 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/09/1985 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17298B825 | List: |
| References | |
| ANPP-31658-EEVB, NUDOCS 8501230068 | |
| Download: ML17298B822 (2) | |
Text
Arizona Nuclear Poorer ProJect P.O. BOX 52034 o
PHOENIX, ARI2ONA85072-2034 l;.b5 JllH 1~.,'II 8 '7 January 9,
1985 ANPP-31658-EEVB/WEX/MFg U.
S. Nuclear Regulatory Commission Region V
1450 Maria Lane Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. D. F. Kixsch, Acting Director Division of Reactor Safety and Projects Subj ect:
NRC Deviation Item 50-528/84-25-03 Quality Assurance Program Applied To The Fire Protection/Detection Systems At PVNGS File:
85-019-026; D.4.33.2
Dear Sir:
Per your request, attached is the Quality Assurance Program Description which is applied to the Palo Verde Nuclear Generating Station's Fire Protection/Detection Systems during the construction and startup phases.
Very truly urs E. E.'Van Brunt, Jr.
APS Vice President, Nuclear Projects Management ANPP Project Director EEVB/WEE/plk Attachment cc:
R.
Zimmerman P. Narbut A. Gehr
~-~
~
50i~~ocK 05OO 52 00b8 860 I p.-=)
V I
)