IR 05000282-08-009, 05000306-08-009 on 11/17/08 - 01/21/09 for Prairie Island Nuclear Power Station, Preliminary Yellow Finding
ML090410466
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/10/2009
From: Stephanie West
Division of Reactor Safety III
To: Wadley M
Northern States Power Co
References
EA-08-349 IR-08-009
Download: ML090410466 (24)


See also: IR 05000282/2008009

Text

February 10, 2009

EA-08-349

Mr. Michael D. Wadley

Site Vice President

Northern States Power - Minnesota

Prairie Island Nuclear Power Station

1717 Wakonade Drive East

Welch, MN 55089

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AND 2

NRC INSPECTION REPORT 05000282/2008009; 05000306/2008009

PRELIMINARY YELLOW FINDING

Dear Mr. Wadley:

On January 21, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection

at your Prairie Island Nuclear Power Station. The enclosed report documents the inspection

findings, which were discussed on January 21, 2009, with members of your staff.

The inspection examined activities conducted under your license as they relate to safety and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

The enclosed report presents the results of this inspection including a finding that has

preliminarily been determined to be Yellow, a finding with substantial safety significance that

may require additional NRC inspections. As described in Section 2PS2 of this report, the

finding involves an October 29, 2008, radioactive material shipment from your facility, via an

exclusive-use open transport vehicle that did not conform to the applicable Department of

Transportation (DOT) regulatory requirements when it arrived at the shipping destination.

The NRC requires licensees to comply with DOT regulations. Specifically, upon receipt, the

external radiation levels on the surface of the affected package were determined to exceed

DOTs regulatory specification. The apparent cause was ineffective radiological

characterization and packaging of the package contents to assure that, under conditions

normally incident to transport, the package would conform with DOTs radiation level limits

specified in 49 CFR 173.441(a). Additionally, workers involved in preparing the package were

not trained as required by 49 CFR 172.704. After the finding was identified, the licensees staff

evaluated the radiological impact to the public to ensure there was no immediate safety concern

and implemented corrective actions, including suspension of all radioactive material shipments

to prevent future incidents.

This finding was assessed based on the best available information, using the applicable

Significance Determination Process (SDP). The final resolution of this finding will be conveyed

in separate correspondence. Preliminarily, we consider this a self-revealing finding having

substantial safety significance because the external package radiation level was greater than

M. Wadley -2-

five, but less than ten times the radiation level limitation specified in the DOT regulatory

requirement. Although the surface of the package with elevated radiation levels would not be

routinely accessible to a member of the public during transport, that aspect was fortuitous and

not the result of design nor package preparation by the licensee. Additionally, the condition

had the potential to adversely affect personnel who would normally receive the package or

respond to an incident involving the package with the reasonable expectation that the

package conformed to DOT radiation limitations. Accordingly, the finding is also an apparent

violation of NRC requirements specified by 10 CFR 71.5, which requires licensees to comply

with 49 CFR 172.704 [and 173.441(a)], and is being considered for escalated enforcement

action in accordance with the NRC Enforcement Policy. The current policy is on the NRCs

website at http://www.nrc.gov/reading-rm/doc-collections/enforcement.

In accordance with NRC Inspection Manual Chapter (IMC) 0609, we intend to complete our

evaluation using the best available information and issue our final determination of safety

significance within 90 days of the date of this letter. The significance determination process

encourages an open dialogue between the NRC staff and the licensee; however, the dialogue

should not impact the timeliness of the staffs final determination. Before the NRC makes a final

decision on this matter, we are providing you an opportunity to: (1) attend a Regulatory

Conference where you can present to the NRC your perspectives on the facts and assumptions

the NRC used to arrive at the finding and its significance; or (2) submit your position on the

finding to the NRC in writing. If you request a Regulatory Conference, it should be held within

30 days of the receipt of this letter and we encourage you to submit supporting documentation

at least one-week prior to the conference in an effort to make the conference more efficient and

effective. If a Regulatory Conference is held, it will be open for public observation and a press

release will be issued to announce it. If you decide to provide a written response in lieu of the

Regulatory Conference, the submission should be sent to the NRC within 30 days of the receipt

of this letter. If you decline to request a Regulatory Conference or to submit a written response,

you relinquish your right to appeal the final SDP determination, in that by not doing either, you

fail to meet the appeal requirements stated in the Prerequisite and Limitation Section of

Attachment 2 of Inspection Manual Chapter 0609.

Please contact Steven K. Orth at 630-829-9827 within 10 days of the date of this letter to notify

the NRC of your intentions. If we have not heard from you within 10 days, we will continue with

our significance determination and enforcement decision. The final resolution of this matter will

be conveyed in separate correspondence.

Since the NRC has not made a final determination in this matter, no Notice of Violation is being

issued for this inspection finding at this time. In addition, please be advised that the number

and characterization of apparent violations described in the enclosed inspection report may

change as a result of further NRC review.

Additionally, based on the results of this inspection, one NRC-identified finding of very low

safety significance was identified. The finding involved a violation of NRC requirements.

However, because of its very low safety significance, and because the issue was entered into

your corrective action program, the NRC is treating the issue as an Non-Cited Violation (NCV) in

accordance with Section VI.A.1 of the NRC Enforcement Policy.

M. Wadley -3-

If you contest the subject or severity of a NCV, you should provide a response within 30 days of

the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory

Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the

Regional Administrator, U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville

Road, Suite 210, Lisle, IL 60532-4352; the Director, Office of Enforcement, U.S. Nuclear

Regulatory Commission, Washington, DC 20555-0001; and the Resident Inspector Office at the

Prairie Island Nuclear Generating Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter,

its enclosure, and your response (if any), will be available electronically for public inspection in

the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's Agencywide Documents Access and Management System (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Steven West, Director

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosure: Inspection Report 05000282/2008009; 05000306/2008009

w/Attachment: Supplemental Information

cc w/encl: D. Koehl, Chief Nuclear Officer

Regulatory Affairs Manager

P. Glass, Assistant General Counsel

Nuclear Asset Manager

J. Stine, State Liaison Officer, Minnesota Department of Health

Tribal Council, Prairie Island Indian Community

Administrator, Goodhue County Courthouse

Commissioner, Minnesota Department

of Commerce

Manager, Environmental Protection Division

Office of the Attorney General of Minnesota

Emergency Preparedness Coordinator, Dakota

County Law Enforcement Center

M. Wadley -3-

If you contest the subject or severity of a NCV, you should provide a response within 30 days of the date

of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission,

ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator,

U.S. Nuclear Regulatory Commission - Region III, 2443 Warrenville Road, Suite 210, Lisle, IL 60532-

4352; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-

0001; and the Resident Inspector Office at the Prairie Island Nuclear Generating Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and

your response (if any), will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide

Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

RA/

Steven West, Director

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosure: Inspection Report 05000282/2008009; 05000306/2008009

w/Attachment: Supplemental Information

cc w/encl: D. Koehl, Chief Nuclear Officer

Regulatory Affairs Manager

P. Glass, Assistant General Counsel

Nuclear Asset Manager

J. Stine, State Liaison Officer, Minnesota Department of Health

Tribal Council, Prairie Island Indian Community

Administrator, Goodhue County Courthouse

Commissioner, Minnesota Department

of Commerce

Manager, Environmental Protection Division

Office of the Attorney General of Minnesota

Emergency Preparedness Coordinator, Dakota

County Law Enforcement Center

See Previous Concurrence

DOCUMENT NAME: G:\DRS/Workinprogress/Prairie Island 2008 009 DRS MJP.doc

G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME SOrth:ls JGiesner KOBrien SWest

DATE 02/04/09 02/04/09 02/06/09 02/10/09

OFFICIAL RECORD COPY

Letter to Mr. Michael Wadley from Mr. Steven West dated February 10, 2009.

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT 1 AND 2

NRC INSPECTION REPORT 05000282/2008009; 05000306/2008009

PRELIMINARY YELLOW FINDING

EA-08-349

DISTRIBUTION:

Tamara Bloomer

RidsNrrPMPrairieIsland

RidsNrrDorlLpl3-1

RidsNrrDirsIrib Resource

Cynthia Carpenter

Nick Hilton

Greg Bowman

Mary Ann Ashley

Mark Satorius

Kenneth OBrien

Patricia Lougheed

Jared Heck

Carole Ariano

Linda Linn

Cynthia Pederson

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports@nrc.gov

ADAMS (PARS)

RidsSecyMailCenter Resource

OCA Distribution

Bill Borchardt

Bruce Mallet

James Caldwell

Marvin Itzkowvitz

Catherine Marco

Daniel Holody

Carolyn Evans

William Jones

Eliot Brenner

Hubert Bell

Guy Caputo

Mona Williams

Paul Pelke

Patricia Lougheed

Magdalena Gryglak

Viktoria Mitlyng

Prema Chandrathil

Allan Barker

Harral Logaras

James Lynch

OEMAIL Resource

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Docket No.: 50-282; 50-306

Licensee No.: DPR-42; DPR-60

Report No.: 05000282/2008009; 05000306/2008009(DRS)

Licensee: Northern States Power - Minnesota

Facility: Prairie Island Nuclear Power Station

Location: Welch, MN

Dates: November 17, 2008 through January 21, 2009

Inspectors: Martin J. Phalen, Health Physicist, DRS

Mark W. Mitchell, Health Physicist, DRS

Peter J. Lee, PhD., CHP, Senior Health Physicist, DNMS

Approved by: Steven K. Orth, Chief

Plant Support Team

Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000282/2008009; 05000306/2008009; 11/17/08 - 01/21/09; Prairie Island Nuclear Power

Station; Radioactive Material Processing and Transportation.

This report covered a one-week period of on-site inspection followed by in-office reviews of

licensee documents and records by regional health physics inspectors. One potential Yellow

finding and one Green finding were identified. The significance of most findings is indicated

by their color (Green, White, Yellow, and Red) using inspection Manual Chapter (IMC) 0609,

Significance Determination Process (SDP). Findings for which the SDP does not apply

may be Green or be assigned a severity level after NRC management review. The NRC's

program for overseeing the safe operation of commercial nuclear power reactors is described

in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.

A. NRC-Identified and Self-Revealing Findings

Cornerstone: Public Radiation Safety

  • Preliminary Yellow: A self-revealing finding with an apparent violation of regulatory

requirements was identified involving a failure of the licensee to properly

radiologically characterize, prepare, and ship a package containing radioactive

material in a manner that assured, under conditions normally incident to transport,

conformance with Department of Transportation (DOT) radiation level limitations

specified by 49 CFR 173.441(a), (i.e., 200 millirem per hour (mrem/h)) on any external

surface of the package as required by 10 CFR 71.5 [and 49 CFR 173.441(a)].

Additionally, the licensee did not provide nor ensure that the individuals involved in

preparing this shipment were trained and qualified for the task as specified by

49 CFR 172.704, Training Requirements. The finding involved an October 29, 2008,

radioactive material shipment, via an exclusive-use open transport vehicle that was

determined to have radiation levels of 1630 mrem/h on the external surface of a

package upon receipt at the shipping destination. As immediate corrective actions, the

licensee suspended all radioactive shipment activities. The licensee entered this

performance deficiency in their corrective action program; initiated a root cause

evaluation; and initiated corrective measures, including various process improvements

to prevent recurrence.

This finding is more than minor since it was associated with the Public Radiation Safety

Cornerstone program and process attribute and affected the cornerstone objective to

ensure adequate protection of the public from exposure to radioactive materials given

that package radiation levels were elevated. Preliminarily, the significance of this finding

is considered as having a substantial safety significance (Yellow), since the radiation

level was greater than five times the limit (1000 mrem/h) but less than ten times the limit

(2000 mrem/h) specified by the DOT regulatory requirement. Although the surface of

the package with elevated radiation levels would not be routinely accessible to a

member of the public during transport, that aspect was fortuitous and not the result of

design nor package preparation by the licensee. The condition had the potential to

adversely affect personnel who would normally receive the package or respond to an

incident involving the package, with a reasonable expectation that the package

conformed to DOT radiation limitations.

1 Enclosure

Additionally, the cause of this finding had a cross-cutting aspect in the area of Human

Performance. Specifically, the licensee failed to appropriately plan the work activity by

incorporating risk insights and job site conditions, including conditions which may impact

radiological safety (H.3 (a)). This finding is documented within the licensees corrective

action system as RCE 1157726. (Section 2PS2)

Cornerstone: Occupational Radiation Safety

  • Green. An NRC-identified finding of very low safety significance with an associated

Non-Cited Violation (NCV) of Technical Specification 5.4.1 was identified in the area of

occupational radiation safety associated with the licensees failure to perform adequate

job planning to evaluate the radiological hazards, as required by station procedures.

Specifically, the licensee failed to properly assess the radiological hazards to workers

associated with the decontamination, demobilization and packaging of fuel sipping

equipment on the refuel floor. This issue has been entered into the licensees corrective

action program and implemented corrective actions that include changes to procedures

to include a holistic risk-based review of radiologically significant work.

The finding is more than minor because, given the radiological uncertainty of working

with fuel handling equipment, if left uncorrected the finding could become a more

significant safety concern. The finding was determined to be of very low safety

significance because it did not involve unintended collective dose (ALARA planning);

there was no overexposure, nor potential for overexposure; and the licensees ability

to assess dose was not compromised. Additionally, the cause of this finding had a

cross-cutting aspect in the area of Human Performance. Specifically, the licensee failed

to appropriately plan the work activity by incorporating risk insights and job site

conditions, including conditions which may impact radiological safety (H.3 (a)).

(Section 2OS2)

B. Licensee-Identified Violations

No findings of significance were identified.

2 Enclosure

REPORT DETAILS

2. RADIATION SAFETY

Cornerstone: Occupational Radiation Safety

2OS1 Access Control to Radiologically Significant Areas (71121.01)

.1 Job-In-Progress Reviews

a. Inspection Scope

Radiological work in high radiation work areas having significant dose rate gradients was

reviewed to evaluate the application of dosimetry to effectively monitor exposure to

personnel and to assess the adequacy of licensee controls.

Specifically, the inspectors reviewed the circumstances involving the decontamination,

demobilization, and preparation for shipment of fuel sipping equipment on October 23

and 24, 2008. The inspection was performed both on-site and through in-office reviews

of documents generated by the licensee. This review included discussion with various

members of the licensee staff, both in person and by teleconference, which provided a

common understanding of the events as they occurred. Additionally, select data

provided by the licensee was independently reviewed by a technical expert on the NRC

staff.

This inspection supplements the sample reported in Inspection Report 05000282/2008002; 05000306/2008002.

b. Findings

One finding of significance was identified.

Introduction: A Green NRC-identified finding of very low safety significance and

associated Non-Cited Violation (NCV) of Technical Specification 5.4.1 was identified in

the area of occupational radiation safety associated with the licensees failure to

perform adequate job planning to evaluate the radiological hazards, as required by

station procedures. Specifically, the licensee failed to properly assess the radiological

hazards to workers associated with the decontamination, demobilization and packaging

of fuel sipping equipment on the refuel floor.

Description: During a Unit 2 refueling outage in the fall of 2008, potentially degraded

fuel assemblies were tested for cladding integrity with vendor fuel sipping equipment.

The equipment was provided from the vendor as new, clean equipment. The tests were

performed under water in the spent fuel pool. After the outage, the equipment was

decontaminated, demobilized and packaged for shipment back to the vendor.

On October 23 and 24, 2008, the equipment was decontaminated at Prairie Island by

underwater hydro-lancing, demobilized by personnel, and prepared for shipment back to

the vendor. Personal accounts and record review of the work activity indicated that the

fuel sipping equipment was rinsed with water and surveyed for gross contamination and

3 Enclosure

radiological hazards when removed from the spent fuel pool. The staff used hand tools

for equipment disassembly. The fuel sipping equipment was then wrapped in plastic and

then placed into a designated laydown area near the pool. The radiation protection staff

initially posted and controlled the area as a Radiation Area and Contamination Area.

No extremity dosimetry nor additional controls were in place for controlling radiological

exposure during the hands-on demobilization of the equipment. After the fuel sipping

equipment was in the laydown area, the work group left the area. The next day the work

group loaded the fuel sipping equipment into a vendor supplied container in preparation

for shipment.

Station procedures, including FP-RP-JPP-01, RP Job Planning, Revision 04, required

formal job planning when removing items from the spent fuel pool. In the absence of

such a pre-job review, the potential exist for not performing the radiological surveys

necessary to properly assess the entire scope of radiological hazards present and,

subsequently to prescribe the appropriate supplemental dosimetry and/or dosimetry

placement requirements to workers associated with the decontamination, demobilization,

and preparation of the fuel sipping equipment.

In this case, the licensee planned hands-on work with fuel sipping equipment that had

a high potential for individuals to come in contact with discrete radioactive particles and

high contamination from the fuel sipping equipment. The licensee recognized that when

in use underwater, the fuel sipping equipment had detectable underwater contact dose

rates up to 40 rem/h on the inside of the fuel sipping canisters and up to 9 rem/h at

contact on the outside of the fuel sipping canisters. Radiological surveys taken in the

work area on the refuel floor detected discrete radioactive particles ranging from 800 to

35,000 disintegrations per minute (dpm) per 100 cm2. However, the inspectors identified

that the licensee had not performed adequate planning/evaluation to assess the hazard

and the potential radiological impact to the workers. As a result of this failure, the

licensee had not prescribed the appropriate dosimetry and monitoring commensurate

with the hazard, and the licensee had to perform a post-job dose evaluation to fully

assess the workers dose.

Several days later, after the fuel sipping equipment had been shipped off-site, more

detailed follow-up surveys of the equipment identified the presence of additional discrete

radioactive particles with gamma dose rates of up to 11 rem/h at contact. Isotopic

analysis of the particles determined that cobalt-60 was the dominant radionuclide of

interest. Once informed of the elevated dose rates of discrete radioactive particles, the

licensee performed extremity and whole body dose assessments to determine the actual

dose received by the workers that handled the equipment in order to confirm that no

significant radiological exposures had occurred.

Analysis: The inspectors identified a performance deficiency, in that, prior to the start of

work, the licensee failed to perform adequate radiological evaluations necessary to

properly assess the radiological hazards and to prescribe appropriate radiological

controls necessary to evaluate and minimize dose to workers. In accordance with

Inspection Manual Chapter (IMC) 0612, Power Reactor Inspection Reports,

Appendix B, Issue Screening, the inspectors determined that the issue was more than

minor because given the radiological uncertainty of working with fuel handling

equipment, if left uncorrected the finding could become a more significant safety

concern.

4 Enclosure

The finding does not involve the application of traditional enforcement, because it did not

result in actual safety consequences or the potential to impact the NRCs regulatory

function and because it was not the result of willful actions. The finding was evaluated

using the Significance Determination Process (SDP) in accordance with IMC 0609,

Appendix C, for the Occupational Radiation Safety cornerstone. The finding was

determined to be of very low safety significance (GREEN) because the finding did not

involve unintended collective dose (ALARA planning), there was no overexposure, nor

potential for overexposure, and the licensees ability to assess worker dose was not

compromised.

This finding was caused by inadequate planning of radiological work activities.

Consequently, the cause of this deficiency had a cross-cutting aspect in the area of

Human Performance. Specifically, the licensee failed to appropriately plan the work

activity by incorporating risk insights and job site conditions which may impact

radiological safety H.3(a).

Enforcement: Prairie Island Technical Specification 5.4.1 requires that written

procedures shall be established, implemented, and maintained covering the applicable

procedures recommended in Regulatory Guide 1.33, Revision 2, Appendix A,

February 1978. Regulatory Guide 1.33, Revision 2, Appendix A, Section 7, requires

procedures for the control of radioactivity, including limiting personnel exposure. Station

procedure FP-RP-JPP-01, RP Job Planning, Revision 04, Step 5.5.7, requires formal

job planning when removing items from the spent fuel pool.

Contrary to the above, the licensee failed to perform formal job planning when removing

items from the spent fuel pool. Specifically, on October 23 and 24, 2008, the licensee

disassembled, decontaminated, removed from the spent fuel pool, and packaged fuel

sipping equipment without a formal job plan to evaluate the radiological hazards

associated with these activities. The licensee documented this condition in its corrective

action program (AR 1162343) and instituted corrective measures including changes to

procedures to include a holistic risk-based review of radiological significant work.

(NCV 05000282/2008009-02; 05000306/2008009-02)

2OS2 As-Low-As-Reasonably-Achievable Planning And Controls (71121.02)

.1 Inspection Planning

a. Inspection Scope

The inspectors reviewed procedures associated with maintaining occupational

exposures as-low-as-is-reasonably-achievable (ALARA) and processes used to estimate

and track work activity specific exposures.

This inspection constituted one required sample as defined in IP 71121.02-5.

b. Findings

No findings of significance were identified.

5 Enclosure

.2 Radiological Work Planning

a. Inspection Scope

The inspectors reviewed the ALARA work activity evaluations for fuel sipping equipment

decontamination and shipping preparation activities. Specifically, the inspectors

reviewed the exposure estimates and exposure mitigation requirements in order to verify

that the licensee had established procedures and engineering and work controls that

were based on sound radiation protection principles in order to achieve occupational

exposures that were ALARA. The inspectors also determined if the licensee had

reasonably grouped the radiological work into work activities, based on historical

precedence, industry norms, and/or special circumstances.

This inspection constituted a partial sample as defined in IP 71121.02-5.

b. Findings

One finding of significance was identified, which is documented in Section 2OS1.1.

Cornerstone: Public Radiation Safety

2PS2 Radioactive Material Processing and Transportation (71122.02)

.1 Radioactive Waste System

a. Inspection Scope

The inspectors reviewed the liquid and solid radioactive waste system description in the

Updated Final Safety Analysis Report (UFSAR) for information on the types and

amounts of radioactive waste (radwaste) generated and disposed. The inspectors

reviewed the scope of the licensees audit program with regard to radioactive material

processing and transportation programs to verify that it met the requirements of

10 CFR 20.1101(c).

This inspection constituted one sample as defined in IP 71122.02-5.

b. Findings

No findings of significance were identified.

.2 Radioactive Waste System Walkdowns

a. Inspection Scope

The inspectors performed walkdowns of the liquid and solid radwaste processing

systems to verify, that the systems agreed with the descriptions in the UFSAR, and the

Process Control Program, and to assess the material condition and operability of the

systems. The inspectors reviewed the status of radwaste processing equipment that

was not operational and/or was abandoned in place. The inspectors reviewed the

licensees administrative and physical controls to ensure that the equipment would not

6 Enclosure

contribute to an unmonitored release path nor be a source of unnecessary personnel

exposure.

The inspectors reviewed changes to the waste processing system to verify that the

changes were reviewed and documented in accordance with 10 CFR 50.59 and to

assess the impact of the changes on radiation dose to members of the public. The

inspectors reviewed the current processes for transferring waste resin into shipping

containers to determine if appropriate waste stream mixing and/or sampling procedures

were utilized. The inspectors also reviewed the licensees methods for waste

concentration averaging to determine if representative samples of the waste product

were provided for the purposes of waste classification, as required by 10 CFR 61.55.

This inspection constituted one sample as defined in IP 71122.02-5.

b. Findings

No findings of significance were identified.

.3 Waste Characterization and Classification

a. Inspection Scope

The inspectors reviewed the licensees radiochemical sample analysis results for each of

the licensees waste streams, including dry active waste (DAW), spent resins, and filters.

The inspectors also reviewed the licensees use of scaling factors to quantify difficult-to-

measure radionuclides (e.g., pure alpha or beta emitting radionuclides). The reviews

were conducted to verify that the licensees program assured compliance with

10 CFR 61.55 and 10 CFR 61.56, as required by Appendix G of 10 CFR Part 20. The

inspectors also reviewed the licensees waste characterization and classification

program to ensure that the waste stream composition data accounted for changing

operational parameters and thus remained valid between the annual sample analysis

updates.

This inspection constituted one sample as defined in IP 71122.02-5.

b. Findings

No findings of significance were identified.

.4 Shipment Preparation and Shipping Manifests

a. Inspection Scope

The inspectors reviewed the documentation of shipment packaging, radiation surveys,

package labeling and marking, vehicle inspections and placarding, emergency

instructions, determination of waste classification/isotopic identification, and licensee

verification of shipment readiness for five non-excepted material and radwaste

shipments made from 2006 to 2008. The shipment documentation reviewed consisted

of:

7 Enclosure

  • One LSA-I Shipment of Resins to a Radwaste Vendor; and
  • Four SCO-II Shipments to a Fuel Analysis Vendor.

For each shipment, the inspectors determined if the requirements of 10 CFR Parts 20

and 61 and those of the Department of Transportation (DOT) in 49 CFR Parts 170-189

were met. Specifically, records were reviewed and staff involved in shipment activities

was interviewed to determine if packages were labeled and marked properly, if package

and transport vehicle surveys were performed with appropriate instrumentation, if

radiation survey results satisfied DOT requirements, and if the quantity and type of

radionuclides in each shipment were determined accurately. The inspectors also

determined whether shipment manifests were completed in accordance with DOT and

NRC requirements, if they included the required emergency response information, if the

recipient was authorized to receive the shipment, and if shipments were tracked as

required by 10 CFR Part 20, Appendix G.

This inspection constitutes one sample as defined by IP 71122.02-5.

Selected staff involved in shipment activities were observed and interviewed by the

inspectors to determine if they had adequate skills to accomplish shipment related

tasks and to determine if the shippers were knowledgeable of the applicable regulations

to satisfy package preparation requirements for public transport with respect to NRC

Bulletin 79-19, Packaging of Low-Level Radioactive Waste for Transport and Burial,

and 49 CFR Part 172 Subpart H.

This inspection constitutes one sample as defined by IP 71122.02-5.

b. Findings

One finding of significance was identified.

Introduction: A preliminary Yellow self-revealing finding of substantial safety significance

with associated apparent violation was identified involving the licensees failure to

properly prepare and ship a package containing radioactive material in a manner that

assured, under conditions normally incident to transport, conformance with Department

of Transportation (DOT) radiation level limitations specified by 49 CFR 173.441(a), (i.e.,

200 millirem per hour (mrem/h)) on any external surface of the package.

Description: On October 29, 2008, a Surface Contaminated Object (SCO) shipment of

fuel sipping equipment was surveyed, radiologically characterized, prepared, packaged

and shipped from the licensees site to Westinghouse Corporation in Waltz Mill,

Pennsylvania. The shipment was made on an exclusive use open transport vehicle with

no over-pack, barrier, or barricade restricting access to the radioactive package

(transport box). Prairie Islands final shipment surveys indicated that all applicable

survey parameters were below required DOT regulatory limits, with the maximum

radiation level on any package surface at 170 mrem/h (telepole measurement).

However, upon receipt at Waltz Mill, Pennsylvania, the package containing the fuel

sipping equipment was surveyed and found to have surface radiation levels on the

package underside (bottom) in excess of DOT regulatory limits. Westinghouse

Corporation notified the licensee and the State of Pennsylvania.

8 Enclosure

On November 3-4 and 12-14, 2008, Prairie Island Nuclear Generating Plant personnel

were on-site at the Waltz Mill facility to facilitate incident investigation. Members of the

Prairie Island and corporate health physics staff detected similar radiological conditions

as those initially reported by Westinghouse Corporation surveys. Final survey results

determined that the package surface radiation levels were 1630 mrem/h (telepole

measurement). Under controlled conditions at the Waltz Mill facility and under the

observation of Prairie Island radiation protection personnel, qualified individuals opened

the package containing the fuel sipping equipment to determine the source of the

elevated radiation levels. Upon examination, the licensees staff identified that a small

radioactive particle was embedded into the umbilical cable to the lid of the fuel sipping

canister. The fuel sipping equipment (lid and umbilical cable) was found to be not

properly braced, nor secured as required; apparently, the lid and the umbilical cable

shifted from the time of the Prairie Island shipping package departure survey to the time

of the Westinghouse Waltz Mill shipping package receipt survey (i.e., during transport).

Additionally, two other discrete radioactive particles were detected inside the shipping

box. Radiological surveys indicated that the particle embedded into the lids umbilical

cable exhibited a radiation level of about 11,000 mrem/h; and the two other discrete

radioactive particles exhibited radiation levels at a nominal 2000 mrem/h. Isotopic

analyses of the discrete radioactive particles identified cobalt-60 as the sole radioactive

isotope. The licensees staff found the fuel sipping canister lid and associated umbilical

cable in a location in the shipping package, that coincided with the elevated radiation

levels on the external surfaces of the package, as identified on the Westinghouse Waltz

Mill receipt radiation survey.

The detection of the highly radioactive fuel sipping canister lid umbilical cable and the

associated discrete radioactive particles indicated that Prairie Islands on-site efforts to

decontaminate and radiologically characterize the fuel sipping equipment prior to

shipment was not completely successful. The on-site radiological surveys were not

sufficient for detecting highly radioactive small particles; and that the fuel sipping

equipment was not properly braced nor secured in its package for shipment under

conditions normally incident to transport. Additionally, the phenomena of the

redistribution of highly radioactive particles and the potential for loads shifting during the

transportation of radioactively contaminated equipment are neither uncommon or

unknown to the industry.

The inspectors determined that, in the configuration used to transport the package, the

elevated radiation levels on the bottom external surface of the package would not be

routinely accessible to a member of the public. However, the licensee determined

through event reconstruction, that there were elevated radiation levels on the underside

of the transport trailer, that were unanticipated by the licensee at time of transport.

Further, the NRC concluded, that the elevated radiation levels, although on the

underside of the package, had the potential to adversely affect personnel who would

normally receive the package and/or respond to an incident involving the package with

the reasonable expectation that the package conformed to DOT radiation limitations.

Redistribution of the canister lid and associated umbilical cable likely occurred as a

result of conditions normally incident to transport. The inspectors concluded that it was

fortuitous and not the result of design nor package preparation, that the material was

deposited in such manner that effectively limited the potential for public exposure.

9 Enclosure

The inspectors identified issues associated with the surveying, preparation, and

packaging of the fuel sipping equipment. In addition to the ineffective radiological

characterization and packaging of the fuel sipping equipment, the inspectors determined

that the licensee did not provide nor ensure that the individuals involved in packaging the

shipment were trained and qualified for the task as required by 49 CFR 172.704

Training Requirements. None of the licensees staff involved in the loading and

preparation were trained, and only some of the Westinghouse personnel involved in

loading, preparing, and packaging of the fuel sipping equipment for transport were

trained and qualified for the task. Specifically, nine of the thirteen people involved in

preparing this package for radioactive shipment and transport had not received the

required function specific training. Two of the remaining four individuals had not

received the required recurrent training within the last three years.

As a follow-up to this issue, the licensee performed a dose assessment to evaluate

potential effective dose to a member of the public for a person reasonably close to the

radioactive point source. This review concluded that the potential for an exposure above

the NRC annual limit for a member of the public was minimal given the radiation

sources location and an individuals necessary orientation to come in sustained contact

with the radiation field. The inspectors reviewed the licensees data and concluded that

an overexposure to a member of the public would not be plausible based on the location

of the radiation levels and the corresponding dose rates. However, the inspectors

concluded that the licensees assessment did not provide any information that applied to

the applicable regulatory requirement concerning radiation levels on the surface of the

package.

Analysis: The inspectors concluded that the issues concerning the shipment constituted

a performance deficiency. Specifically, the licensee failed to characterize the distribution

of radioactive material on the equipment and to package the equipment in such a

manner that radioactive material would not shift nor redistribute within the package

under normal transportation conditions as required by 10 CFR 71.5 and 49 CFR 173.441

for the transportation of radioactive licensed materials. Additionally, the licensee did not

provide nor ensure that the individuals involved in this shipment were trained and

qualified for the task as required by 49 CFR 172.704.

The inspectors concluded that the failures were within the licensees ability to foresee,

correct, and should have been prevented, particularly, since the potential for loads to

shift and the redistribution of highly radioactive particles during transportation of

radioactively contaminated equipment is not uncommon and is known to the industry.

However, the matter had no actual safety consequence (i.e., no overexposure to any

member of the public) or impact on the NRCs ability to perform its regulatory function,

and there were no willful aspects associated with this finding. Also, after the finding was

identified, the licensees staff evaluated the radiological impact to the public for the

event, and implemented corrective actions including the suspension of all radioactive

material shipments to ensure that the finding did not present an immediate safety

concern. This finding was considered more than minor since it was associated with the

Public Radiation Safety Cornerstone program and process attribute relative to DOT

package radiation limits and affected the cornerstone objective to ensure adequate

protection of the public from exposure to radioactive materials released into the public

domain in that package radiation levels were elevated. Application of Manual Chapter

0609, Appendix D, the Public Radiation Safety Significance Determination Process is

10 Enclosure

applicable since the finding involved an occurrence in the licensees radioactive material

transportation program that was contrary to DOT regulations, (i.e., 49 CFR 173.441(a)).

The cause of this finding had a cross-cutting aspect in the area of Human Performance.

Specifically, the licensee failed to appropriately plan the work activity by incorporating

risk insights and job site conditions, including conditions which may impact radiological

safety (H.3 (a)). This finding is documented within the licensees corrective action

system as RCE 01157726.

Preliminarily, the significance of this finding is considered as having a substantial safety

significance, since the radiation level was greater than five times the limit (1000

mrem/h), but less than ten times the limit (2000 mrem/h) specified by the DOT regulatory

requirement. This determination is also reinforced by the determination that, though the

potential for public exposure was limited during transportation, that aspect was

fortuitous, and not the result of design nor package preparation by the licensee, and that

the condition had the potential to adversely affect personnel who would normally receive

the package or respond to an incident involving the package with a reasonable

expectation, that the package conformed with DOT radiation limitations.

Enforcement: An apparent violation associated with the preliminary Yellow performance

deficiency in the public radiation safety cornerstone was identified. Title 10 CFR 71.5,

Transportation of Licensed Material, requires licensees to comply with the Department

of Transportation (DOT) regulations in Title 49 CFR Parts 170 through 189 relative to the

transportation of licensed material. Specifically:

(1) Title 49 CFR 173.441(a) requires that each package of radioactive material offered

for transportation must be designed and prepared for shipment, so that under

conditions normally incident to transportation, the radiation level does not exceed

2 mSv/h (200 mrem/h) at any point on the external surface of the package.

Contrary to these requirements, on October 29, 2008, Northern States Power -

Minnesota (Prairie Island) shipped a package containing radioactive material that

was not sufficiently designed nor prepared to assure that, under conditions normally

incident to transportation, the radiation level on the external surface of the package

would not exceed 200 mrem/hour. When received and surveyed at the shipping

destination (Westinghouse in Waltz Mill, Pennsylvania), on October 31, 2008, the

external surface of the package exhibited radiation levels of 1630 mrem/h [i.e.,

package radiation levels greater than five and less than ten times the regulatory

limit].

(2) Title 49 CFR 172.704 Training Requirements requires that individuals involved in

the transport of hazardous materials receive function specific training relative to

their specific tasks, and that these individuals receive recurrent training at least

once every three years.

Contrary to the above, nine of the thirteen people involved in preparing this

package for radioactive shipment and transport had not received the required

function specific training. Also, two of the remaining four individuals had not

received the required recurrent training within the last three years.

11 Enclosure

Following identification of the apparent violation, Prairie Island Nuclear Generating Plant

documented the condition and initiated a root cause review (RCE 01157726); and

instituted corrective measures, including the suspension of radioactive material

shipments that were susceptible to discrete radioactive particle contamination. Pending

determination of a final safety significance, this finding is identified as an apparent

violation, (AV)05000282/2008009-01; 05000306/2008009-01, Radioactive Material

Shipment Package Radiation Levels Exceeded.

.5 Identification and Resolution of Problems

a. Inspection Scope

The inspectors reviewed condition reports, audits and self-assessments that addressed

radioactive waste and radioactive materials shipping program deficiencies since the last

inspection, to verify that the licensee had effectively implemented the corrective action

program, and that problems were identified, characterized, prioritized and corrected.

The inspectors also verified that the licensee's self-assessment program was capable of

identifying repetitive deficiencies or significant individual deficiencies in problem

identification and resolution.

The inspectors reviewed corrective action reports from the radioactive material and

shipping programs since the previous inspection, interviewed staff and reviewed

documents to determine if the following activities were being conducted in an effective

and timely manner commensurate with their importance to safety and risk:

  • Initial problem identification, characterization, and tracking;
  • Disposition of operability/reportability issues;
  • Evaluation of safety significance/risk and priority for resolution;
  • Identification of repetitive problems;
  • Identification of contributing causes;
  • Identification and implementation of effective corrective actions;
  • Resolution of NCVs tracked in the corrective action system; and
  • Implementation/consideration of risk significant operational experience feedback.

This inspection constituted one sample as defined in IP 71122.02-5.

b. Findings

No findings of significance were identified.

12 Enclosure

4. OTHER ACTIVITIES

4OA6 Management Meetings

.1 Exit Meeting Summary

On January 21, 2009, via a telephone conference call, the inspectors presented the

inspection results to Mr. M. D. Wadley, Site Vice President, and other members of the

licensee staff. The licensee acknowledged the issues presented. The inspectors

confirmed that none of the potential report input discussed was considered proprietary.

ATTACHMENT: SUPPLEMENTAL INFORMATION

13 Enclosure

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

S. Derleth, Radiation Protection Specialist

B. Hite, Station Radiation Protection/Chemistry Manager

M. Kent, Radiation Protection Supervisor

K. Kono, Radiation Protection Specialist

S. Nelson, Corporate Radiation Protection Manager

S. Rupp, Radiation Protection Specialist

C. Sweet, Radiation Protection Specialist

LIST OF ITEMS OPENED, CLOSED AND DISCUSSED

Opened

05000282/2008009-01; AV Radioactive Material Shipment Package Radiation Levels05000306/2008009-01 Exceeded. (Section 2PS2)05000282/2008009-02; NCV Failure to Perform Formal Job Planning to Evaluate the

05000306/2008009-02 Radiological Hazards. (Section 2PS2)

Closed

05000282/2008009-02; NCV Failure to Perform Formal Job Planning to Evaluate the

05000306/2008009-02 Radiological Hazards.

Discussed

None

1 Attachment

LIST OF DOCUMENTS REVIEWED

The following is a list of documents reviewed during the inspection. Inclusion on this list does not

imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected

sections of portions of the documents were evaluated as part of the overall inspection effort.

Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it,

unless this is stated in the body of the inspection report.

2OS1 Access Control to Radiologically Significant Areas

AR 1123112; Various Boxes in Radiological Controlled Area Not Labeled; January 8, 2008

AR 1126185; 121 Spent Resin Tank Inlet Wont Open; February 5, 2008

AR 1144127; Two Gauges Found in Hot Instrument Shop without RAM Labels; July 14, 2008

AR 1127294; Safety and Radiation Issues Regarding Resin Sluices; February 14, 2008

AR 1131225; Accumulated Trash Results in Increased Dose Rates; March 15, 2008

AR 1131673; Adverse Trend - Resin Sluicing Issues, March 19; 2008

AR 1137541; Continued Issues with Waste Gas System; May 13, 2008

AR 1145069; Elevated Dose Rates on Resin Sluice Line; July 23, 2008

AR 1150471; Unexpected Dose Readings During Resin Sluice; September 12, 2008

AR 1150626; Iron-55 Elevated In Rad Waste Tanks; September 15, 2008

AR 1151006; Pressurized Drums of Floor Mop Slop; September 18, 2008

AR 1152117; 2R-25 Personnel Contamination Event During Steam Generator Manway Insert

Removal; September 25, 2008

AR 1152179; Radiation Protection Sign-Off Steps Missed in D67 Incore Instrumentation;

September 26, 2008

AR 1156041; Workers Entered High Radiation Area Without Required Brief; October 17, 2008

AR 1157246; Frisker Source Removed From Site; October 29, 2008

AR 1162343; ALARA Planning Not Performed for 2R25 Fuel Sipping; December 12, 2008

FP-RP-BP-01; Bioassay Program; Revision 05

FP-RP-JPP-01; RP Job Planning; Revision 04

FP-RP-RWP-01; Radiation Work Permit; Revision 06

FP-RP-SD-01; Special Dosimetry; Revision 04

2 Attachment

Fuel Sipper Lid Hot Particle Extremity and Whole Body Dose Evaluation; December 12, 2008

Fuel Sipping Removal Sentinel Exposure Tracking for 22-25 October 2008; dated

December 12, 2008

RPIP 1121; RWP Issue; Revision 23

RPIP 1122; Hot Particle Program; Revision 13

RPIP 1126; Contamination Monitor Alarm Response and Personnel Decontamination:

Revision 24

RPIP 1130; On the Job Dose Monitoring and Timekeeping; Revision 19

RPIP 1135; RWP Coverage; Revision 19

Qualification History Reports; December 08, 2008

Work Order Package 00367253; September 24, 2008

2PS2 Radioactive Material Processing and Transportation

Shipment Number 06-026; Refueling Equipment to Westinghouse; May 26, 2006

Shipment Number 06-028; Refueling Equipment to Westinghouse; June 5, 2006

Shipment Number 06-066; Refueling Equipment to Westinghouse; December 13, 2006

Shipment Number 070-011; Spent Resin to Studsvik; July 10, 2007

Shipment Number 08-069; Refueling Equipment to Westinghouse; October 29, 2008

AR 1119827; NRC Radioactive Materials Inspection: Process Control Program and Updated

Safety Analysis Report Do Not Accurately Reflect Current Plant Practice; December 3, 2007

AR 1121239; Effluent and Waste Disposal Annual Report; December 14, 2007

AR 1121243; D59, Revision 8 Process Control Program for Solidification; December 14, 2007

AR 1157726; PI Shipment Arrives at Consignee Above DOT Rad Limits; October 31, 2008

AR 1158879; Sea land Dose Rates; November 12, 2008

AR 1160011; Radiation Survey Not Complete; November 21, 2008

AR 1160060; NRC Observation - D11 Procedures Need Work; November 11, 2008

C21.1.3.7; Spent Resin; Revision 15

D11; Radioactive Material Shipment; Revision 16

3 Attachment

D11.4; Radioactive Material Shipment Greater Than Type A Quantities in Exclusive Use

Vehicle to Barnwell, SC Using RWE Nukem Cask and High Integrity Container Liner;

Revision 23

D11.7; Radioactive Material Shipment LSA/SCO/LDT Quantity to a Licensed Facility;

Revision 15

D20.12; Sluicing Resin From 11 Mixed Bed Ion Exchanger to 121 Spent Resin Tank;

Revision 19

D20.24; Sluicing Resin From 11 Steam Generator Blowdown Ion Exchanger to Barrels;

Revision 16

D20.17; Sluicing Resin From 11 Evaporator Feed Ion Exchanger to Low Level Resin Liner;

Revision 11

Radiological Survey Records; Various Dates

RPIP 1310; RadWaste Streams Scaling Factors; Revision 8

RPIP 1314; Solid Radioactive Waste Annual Report; Revision 9

RPIP 1319; Loading LSA Boxes/Sealand Containers; Revision 10

RPIP 1325; Shipping RAM using Radman/Radship Software; Revision 3

RPIP 1322; Radman for Windows to Generate Scaling Factors; Revision 5

RPIP 1721; Resin Sluice; Revision 17

4 Attachment

LIST OF ACRONYMS USED

ALARA As-Low-As-Is-Reasonably-Achievable

AR Action Request

AV Apparent Violation

CFR Code of Federal Regulation

DOT Department of Transportation

FP Fleet Procedure

IMC Inspection Manual Chapter

IP Inspection Procedure

NCV Non-Cited Violation

NRC Nuclear Regulatory Commission

RP Radiation Protection

RPIP Radiation Protection Implementing Procedure

RWP Radiation Work Permit

SDP Significance Determination Process

5 Attachment