Annual Assessment Letter, James A. FitzPatrick Nuclear Power Plant (Report 05000333/2009001)
ML090630638
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/04/2009
From: Gray M K
Reactor Projects Branch 2
To: Peter Dietrich
Entergy Nuclear Northeast
Gray M K
Shared Package
ML090630634 List:
References
IR-09-001
Download: ML090630638 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 March 4, 2009 Mr. Peter Site Vice President Entergy Nuclear Northeast James A. FitzPatrick Nuclear Power Plant Post Office Box 110 Lycoming, NY 13093

SUBJECT: ANNUAL ASSESSMENT LETTER - JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2009001)

Dear Mr. Dietrich,

On February 10, 2009, the NRC staff completed its performance review of the James A. FitzPatrick Nuclear Power Plant. Our technical staff reviewed performance indicators

for the most recent quarter and inspection results for the period from January 1 through

December 31, 2008. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A

separate letter designated and marked as "Official Use Only - Security Information" will include

the security cornerstone review and resultant inspection plan.

Overall, FitzPatrick operated in a manner that preserved public health and safety and fully met

all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first

three quarters of the assessment cycle, was within the Licensee Response column of the NRC's

Action Matrix, based on all inspection findings being classified as having very low safety

significance (Green) and all performance indicators indicating performance at a level requiring

no additional NRC oversight (Green). Therefore, we plan to conduct Reactor Oversight Process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2010. In addition to the baseline inspections, we plan to conduct

an inspection of your independent spent fuel storage installation. The inspection plan is

provided to allow for the resolution of any scheduling conflicts and personnel availability issues

well in advance of inspector arrival onsite. Routine resident inspections are not listed due to

their ongoing and continuous nature. The inspections in the last nine months of the inspection

plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Avail able Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5209 with any

questions you may have regarding this letter or the inspection plan.

Sincerely,/RA/ Original Signed By:

Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59

Enclosure:

FitzPatrick Inspection/ Activity Plan cc w/encl:

G. Taylor, Chief Executive Officer, Entergy Operations J. Wayne Leonard, Chairman & CEO, Entergy Operations M. Kansler, President & CEO / CNO, Entergy Nuclear Operations, Inc.

J. Herron, Senior Vice President, Engineering Nuclear Operations, Entergy Operations M. Balduzzi, Senior Vice President, Northeastern Regional Operations Senior Vice President of Engineering and Technical Services J. DeRoy, Vice President, Operations Support K. Mulligan, General Manager, Plant Operations O. Limpias, Vice President, Engineering (ENO)

J. Ventosa, General Manager, Engineering (ENO)

J. McCann, Director, Nuclear Safety and Licensing (ENO)

E. Harkness, Director of Oversight (ENO)

B. Finn, Director, Nuclear Safety Assurance J. Pechacek, Manager, Licensing W. Dennis, Assistant General Counsel (ENO)

P. Tonko, President and CEO, New York State Energy Research and Development Authority P. Eddy, New York State Department of Public Service P. Smith, President, New York State, Energy, Research, and Development Authority S. Lyman, Oswego County Administrator Supervisor, Town of Scriba C. Donaldson, Esquire, Assistant Attorney General, New York Department of Law S. Lousteau, Treasury Department, Entergy Services J. Spath, Program Director, New York State Energy Research and Development Authority Institute of Nuclear Power