ML090921019

From kanterella
Revision as of 02:38, 27 August 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
03/19/2009 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss Nrc'S Reactor Oversight Process (ROP) & Nrc'S Annual Assessment of Plant Safety Performance at Joseph M. Farley for Period of 01/01/2008 - 12/31/
ML090921019
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/02/2009
From: Shaeffer S M
NRC/RGN-II/DRS/PSB2
To: Johnson J R
Southern Nuclear Operating Co
References
Download: ML090921019 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 2, 2009 Mr. J. Randy Johnson Vice President - Farley Southern Nuclear Operating Company, Inc.

7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT - DOCKET NOS. 50-348 AND 50-364

Dear Mr. Johnson:

This refers to the meeting conducted on March 19, 2009, in Dothan, AL. The purpose of this meeting was to discuss the NRC's Reactor Oversight Process (ROP) and the NRC's annual assessment of plant safety performance for the period of January 1, 2008 - December 31, 2008.

The major topics addressed were the NRC's assessment program and the results of the assessment. A listing of meeting attendees and information presented during the meeting are

enclosed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4521.

Sincerely,

/RA by Randy Musser for/

Scott M. Shaeffer, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8

Enclosures:

1. List of Attendees
2. Powerpoint Presentation

cc w/encls: (See page 2)

_________________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE /RA/ /RA by RMusser/ NAME TLighty SShaeffer DATE 4/ /2009 4/ /2009 4/ /2009 4/ /2009 4/ /2009 4/ /2009 4/ /2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO SNC, Inc 2 cc w/encls: Angela Thornhill Managing Attorney and Compliance Officer Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

B. D. McKinney Licensing Services Manager B-031 Southern Nuclear Operating Company, Inc. Electronic Mail Distribution

Jeffrey T. Gasser, Executive VP Southern Nuclear Operating Company, Inc. Electronic Mail Distribution William D. Oldfield Quality Assurance Supervisor Southern Nuclear Operating Company Electronic Mail Distribution L. Mike Stinson, Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution David H. Jones, Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. Electronic Mail Distribution Dr. D. E. Williamson State Health Officer Alabama Dept. of Public Health Electronic Mail Distribution Mr. Mark Culver Chairman Houston County Commission P. O. Box 6406 Dothan, AL 36302 Jim Sommerville (Acting) Chief Environmental Protection Division Department of Natural Resources Electronic Mail Distribution

Senior Resident Inspector Southern Nuclear Operating Company, Inc. Joseph M. Farley Nuclear Plant U.S. NRC 7388 N. State Highway 95 Columbia, AL 36319 SNC, Inc 3 Letter to J. Randy Johnson from Scott M. Shaeffer dated April 2, 2009

SUBJECT:

PUBLIC MEETING

SUMMARY

- JOSEPH M. FARLEY NUCLEAR PLANT - DOCKET NOS. 50-348 AND 50-364

Distribution w/encls:

Region II Administrator's Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Regional Counsel Region II State Liasison Officer Region II Public Affairs Officers Region II Resource Management Branch Chief Region II Receptionist Headquarters Operations Officer PMNS RidsNrrPMFarley Resource C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC Enclosure 1 Enclosure 1