IR 05000348/2024005

From kanterella
Jump to navigation Jump to search
Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005
ML24235A477
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/26/2024
From: Alan Blamey
Division Reactor Projects II
To: Coleman J
Southern Nuclear Company
References
IR 2024005
Download: ML24235A477 (1)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - REPORT 05000348/2024005 AND 05000364/2024005

Dear Jamie Coleman:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Joseph M. Farley Nuclear Plant. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4415 with any questions you have regarding this letter.

Sincerely, Alan J. Blamey, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8 Enclosure(s):

Inspection Plan cc w/ encl: Distribution via LISTSERV August 26, 2024 Signed by Blamey, Alan on 08/26/24

ML24235A477 X

SUNSI Review X

Non-Sensitive

Sensitive X

Publicly Available

Non-Publicly Available OFFICE RII/DRP RII/DRP NAME C. Scott A. Blamey DATE 08/26/24 08/26/24

Enclosure Farley 09/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count FARLEY REQUAL INSPECTION

1,2 9/9/2024 9/13/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance PROBLEM IDENTIFICATION AND RESOLUTION

1,2 10/7/2024 10/11/2024 IP 71152B 000747 Problem Identification and Resolution 1,2 10/28/2024 11/1/2024 IP 71152B 000747 Problem Identification and Resolution EMERGENCY PREPAREDNESS EXERCISE INSPECTION

1,2 10/21/2024 10/25/2024 IP 71114.01 000716 Exercise Evaluation 1,2 10/21/2024 10/25/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/21/2024 10/25/2024 IP 71151 001397 Performance Indicator Verification SECURITY BASELINE INSPECTION

1,2 11/4/2024 11/7/2024 IP 71130.02 000734 Access Control 1,2 11/4/2024 11/7/2024 IP 71130.09 001656 Security Plan Changes 1,2 11/4/2024 11/7/2024 IP 71151 001338 Performance Indicator Verification CYBER SECURITY INSPECTION

1,2 12/2/2024 12/6/2024 IP 71130.10 000741 Cybersecurity AGING MANAGEMENT OF AN ISFSI (change IP to 60859 when issued)

1,2 1/27/2025 1/31/2025 IP 60855 001001 Operation Of An ISFSI FOCUSED ENGINEERING INSPECTION (CGD)

1,2 2/24/2025 2/28/2025 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 3/10/2025 3/14/2025 IP 71111.21N.03 001808 Commercial Grade Dedication EMERGENCY PREPAREDNESS PROGRAM INSPECTION

1,2 3/17/2025 3/21/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 3/17/2025 3/21/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 3/17/2025 3/21/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification

Site Inspection Activity Plan

SECURITY BASELINE INSPECTION

1,2 3/17/2025 3/20/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 3/17/2025 3/20/2025 IP 71130.07 000739 Security Training UNIT 2 IN-SERVICE INSPECTION

2 3/24/2025 3/28/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RADIATION SAFETY AND TRANSPORTATION BASELINE INSPECTION

1,2 4/14/2025 4/18/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/14/2025 4/18/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 4/14/2025 4/18/2025 IP 71151 000746 Performance Indicator Verification TARGET SET INSPECTION

1,2 7/14/2025 7/18/2025 IP 71130.14 000743 Review of Power Reactor Target Sets FARLEY INITIAL EXAM

1,2 8/3/2025 8/9/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 9/7/2025 9/20/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

SECURITY BASELINE INSPECTION

1,2 8/4/2025 8/7/2025 IP 71130.02 000734 Access Control 1,2 8/4/2025 8/7/2025 IP 71130.09 001656 Security Plan Changes 1,2 8/4/2025 8/7/2025 IP 71151 001338 Performance Indicator Verification UNIT 1 IN-SERVICE INSPECTION +SG

1 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - FAR

1,2 1/12/2026 1/16/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing MATERIAL CONTROL AND ACCOUNTING

1,2 6/22/2026 6/26/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)