IR 05000348/2023006

From kanterella
Jump to navigation Jump to search
Annual Assessment Letter for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2023006 and 05000364/2023006
ML24052A387
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/28/2024
From: Laura Dudes
Region 2 Administrator
To: Coleman J
Southern Nuclear Company
References
IR 2023006
Download: ML24052A387 (6)


Text

February 28, 2024

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 - REPORT 05000348/2023006 AND 05000364/2023006

Dear Jamie Coleman:

The NRC has completed its end-of-cycle performance assessment of Joseph M. Farley Nuclear Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2023, through December 31, 2023. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Joseph M. Farley Nuclear Plant, Unit 1, during the most recent quarter was within the Regulatory Response Column (Column 2), the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on (1) one inspection finding having low to moderate safety significance (White) in the Mitigating Systems cornerstone originating at the end of the second quarter of 2023. A 95001 Supplemental Inspection was completed on December 14, 2023, and the report issued on January 24, 2024 (ADAMS Accession number ML24022A059). Based on the results of this inspection and our Action Matrix assessment, the NRC has determined that Joseph M.

Farley Nuclear Plant, Unit 1, would be transitioned to the Licensee Response Column (Column 1) of the Action Matrix as of December 14, 2023. All PIs were Green during the assessment period.

The NRC determined the performance at Joseph M. Farley Nuclear Plant, Unit 2, during the most recent quarter was within the Licensee Response Column (Column 1), the highest performance category of the NRCs ROP Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green).

Joseph M. Farley Nuclear Plant, Units 1 and 2, were in the Degraded Performance Column (Column 3), the middle of five performance categories of the NRCs ROP Action Matrix, during the first three quarters of Calendar Year (CY) 2023. This conclusion was based on one or more greater-than-Green inspection findings (or PIs) in the Security cornerstone that originated during the fourth quarter of 2022. The 95002 Supplemental Inspection was completed on September 1, 2023, and the report issued on October 12, 2023 (ML23285A206). Based on the results of this inspection and our Action Matrix assessment, the NRC determined that Joseph M.

Farley Nuclear Plant, Units 1 and 2, would be transitioned to the Licensee Response Column (Column 1) of the Action Matrix as of September 1, 2023. However, as communicated in NRC Inspection Report and Assessment Followup Letter 05000348/2023091, dated October 19, 2023 (ML23263B166), the NRC determined that Joseph M. Farley Nuclear Plant, Unit 1, would be transitioned to the Regulatory Response Column (Column 2) due to a White inspection finding in the Mitigating Systems cornerstone, as noted in the second paragraph of this letter.

Since the NRC determined the performance of Joseph M. Farley Nuclear Plant, Units 1 and 2, at the end of the assessment period was within the Licensee Response Column (Column 1), the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through December 31, 2025. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4411 with any questions you may have regarding this letter.

Sincerely, Laura A. Dudes Regional Administrator Docket Nos.: 05000348 and 05000364 License Nos.: NPF-2 and NPF-8 Enclosure:

Farley Inspection/Activity Plan (03/01/2024 - 12/31/2025)

cc: Distribution via ListServ Signed by Dudes, Laura on 02/28/24

ML24052A387

SUNSI Review X Non-Sensitive X Publicly Available X Sensitive Non-Publicly Available

OFFICE RII/DRP RII/DRP RII/DRP RII/ORA NAME A. Alen P. Meier A. Blamey L. Dudes DATE 2/20/2024 2/22/2024 2/23/2024 2/28/2024

Farley

03/01/2024 - 12/31/2025

Unit Start End Activity CAC Title Staff Count FOCUSED ENGINEERING INSPECTION (FPTI) 3

1,2 3/4/2024 3/8/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 3/18/2024 3/22/2024 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

RP OCCUPATIONAL RAD SAFETY BASELINE INSPECTION 3

1,2 3/25/2024 3/29/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 3/25/2024 3/29/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 3/25/2024 3/29/2024 IP 71124.04 000728 Occupational Dose Assessment

1,2 3/25/2024 3/29/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 3/25/2024 3/29/2024 IP 71151 000746 Performance Indicator Verification

1,2 4/8/2024 4/12/2024 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1,2 4/8/2024 4/12/2024 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 4/8/2024 4/12/2024 IP 71124.04 000728 Occupational Dose Assessment

1,2 4/8/2024 4/12/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 4/8/2024 4/12/2024 IP 71151 000746 Performance Indicator Verification

UNIT 1 IN-SERVICE INSPECTION 1

1 4/15/2024 4/19/2024 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

OPERATION OF AN ISFSI 2

1,2 7/22/2024 7/26/2024 IP 60855 001001 Operation of an ISFSI

RP PUBLIC RAD SAFETY BASELINE INSPECTION 2 1,2 8/19/2024 8/23/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

1,2 8/19/2024 8/23/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

1,2 8/19/2024 8/23/2024 IP 71151 000746 Performance Indicator Verification

SECURITY BASELINE INSPECTION 3

1,2 8/26/2024 8/29/2024 IP 71130.02 000734 Access Control

1,2 8/26/2024 8/29/2024 IP 71130.05 000737 Protective Strategy Evaluation

1,2 8/26/2024 8/29/2024 IP 71130.09 001656 Security Plan Changes

1,2 8/26/2024 8/29/2024 IP 71151 001338 Performance Indicator Verification

FARLEY REQUAL INSPECTION 2

1,2 9/9/2024 9/13/2024 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

PROBLEM IDENTIFICATION & RESOLUTION 4

1,2 10/7/2024 10/11/2024 IP 71152B 000747 Problem Identification and Resolution

1,2 10/28/2024 11/1/2024 IP 71152B 000747 Problem Identification and Resolution

Page 1 of 3 EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1,2 10/21/2024 10/25/2024 IP 71114.01 000716 Exercise Evaluation

1,2 10/21/2024 10/25/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 10/21/2024 10/25/2024 IP 71151 001397 Performance Indicator Verification CYBER SECURITY INSPECTION 4

1,2 12/2/2024 12/6/2024 IP 71130.10 000741 Cybersecurity

FOCUSED ENGINEERING INSPECTION (CGD) 3

1,2 2/24/2025 2/28/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

1,2 3/10/2025 3/14/2025 IP 71111.21N.03 001808 Commercial Grade Dedication

SECURITY BASELINE INSPECTION 2

1,2 3/17/2025 3/20/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 3/17/2025 3/20/2025 IP 71130.07 000739 Security Training

UNIT 2 IN-SERVICE INSPECTION 1

2 3/24/2025 3/28/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RADIATION SAFETY AND TRANSPORTATION BASELINE INSPECTION 2 1,2 4/14/2025 4/18/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/14/2025 4/18/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1,2 4/14/2025 4/18/2025 IP 71151 000746 Performance Indicator Verification

FARLEY INITIAL EXAM 4

1,2 4/27/2025 5/3/2025 OV 000956 FB-OR-Onsite Validation of Initial License Examination (OV)

1,2 6/1/2025 6/14/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1,2 6/2/2025 6/6/2025 IP 71114.02 000717 Alert and Notification System Testing

1,2 6/2/2025 6/6/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 6/2/2025 6/6/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 6/2/2025 6/6/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 6/2/2025 6/6/2025 IP 71151 001397 Performance Indicator Verification

TARGET SET INSPECTION 2

1,2 7/14/2025 7/18/2025 IP 71130.14 000743 Review of Power Reactor Target Sets

AGING MANAGEMENT OF AN ISFSI 2 1,2 7/21/2025 7/25/2025 IP 60859 Independent Spent Fuel Storage Installation (ISFSI) License Renewal Inspection

SECURITY BASELINE INSPECTION 1 1,2 8/4/2025 8/7/2025 IP 71130.02 000734 Access Control

1,2 8/4/2025 8/7/2025 IP 71130.09 001656 Security Plan Changes

1,2 8/4/2025 8/7/2025 IP 71151 001338 Performance Indicator Verification

Page 2 of 3 UNIT 1 IN-SERVICE INSPECTION 1

1 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Page 3 of 3