NL-24-0003, Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31

From kanterella
Jump to navigation Jump to search
Inservice Inspection Program Owners Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31
ML24047A205
Person / Time
Site:  Southern Nuclear icon.png
Issue date: 02/16/2024
From: Coleman J
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
NL-24-0003
Download: ML24047A205 (1)


Text

~ Southern Nuclear Regulatory Affairs 3535 Colonnade Parkway Birmingham , AL 35243

205 992 5000

February 16, 2024

Docket No.: 50-348 NL-24-0003

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001

Joseph M. Farley Nuclear Plant - Unit 1 lnservice Inspection Program Owner's Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31

Ladies and Gentlemen:

This letter supplements SNC letters NL-21-0646 (submitted July 16, 2021) and NL 0213 (submitted March 21, 2023). The attached information in Enclosure 1 supplements the information submitted as Table 1 for Unit 1 outages 1 R30 and 1 R31. Enclosure 2 contains the OAR-1 signature pages for the supplemental information.

This letter contains no NRC commitments. If you have any questions, please contact Ryan Joyce at 205.992.6468.

Respectfully submitted, 95~~

Jamie M. Coleman Director, Regulatory Affairs Southern Nuclear Operating Company

JMC/was/cbg

Enclosure 1: Owner's Activity Report (OAR) Table 1 Supplement Enclosure 2: Supplemental Form OAR-1 Owner's Activity Report Signature Pages

cc: Regional Administrator, Region II NRR Project Manager - Farley Nuclear Plant Senior Resident Inspector - Farley Nuclear Plant RTYPE: CFA04.054 Joseph M. Farley Nuclear Plant - Unit 1 lnservice Inspection Program Owner's Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31

Enclosure 1

Owner's Activity Report (OAR) Table 1 Supplement to NL-24-0003 Owner's Activity Report (OAR) Table 1 Supplement

Table 1 Supplement for Farley 1 R30 and 1 R31

Examination Item Description Evaluation Category and Item Description Number F-A A degraded pipe support , ALA2- CR 10781010 and WO F1 .20B 4600-SI-R299 , was noted on 16 " SNC1146984 document Chemical Volume Control System the engineering line, 16 " HCB-42. The evaluation. TE 1084317 floor/ground anchorage was found is tracking LT AM F degraded. 0018 to repair/replace pipe support ALA2-4600-SI-R299 to completion.

F-A A degraded pipe support , ALA2- CR 10781010 and WO F1 .20E 4600-SI-R298 , was noted on 16 " SNC1146984 document Chemical Volume Control System the engineering line, 16 " HCB-42. The evaluation. TE 1084317 floor/ground anchorage was found is tracking LT AM F degraded. 0018 to repair/replace pipe support ALA2-4600-SI-R298 to completion.

E1-1 Joseph M. Farley Nuclear Plant - Unit 1 lnservice Inspection Program Owner's Activity Report (OAR) Supplement for Outages 1 R30 and 1 R31

Enclosure 2

Supplemental Form OAR-1 Owner's Activity Report Signature Pages to NL-24-0003 Supplemental Form OAR-1 Owner's Activity Report Signature Pages

FORM OAR-1 OWNER'S ACTIVITY REPORT

Report Number_~ _.1 ... - s.-.2 .. - 2_, ... u ... n .... it .... 1,.., ... s .... th ........ lo .... te=rv"""""a...,1, ... 2=-n_d .... P ... e .... r""'io ... d..,, .... 2 .... n_d .... R..ae ... o.,.o..,rt_.l ____________ _

Plant Joseph M. Farley Nuclear ___ P~la=n~t~--------------------

Un it No *---- ~ --- Commercial service (ii app licable) date December 01, 1977 Refueling outage no .~1 .... R ___ 3~1~---

Current inspection interval __ .,,5c..th ________________________________ _

(1st, 2nd , 3rd, 4th, other)

Current inspection period __ -=2~nd ________________________________ _

(1st, 2nd , 3rd)

Edition and Addenda of Section XI applicable to the inspection plans  : The 2007 Edition through 2008 Addenda is a licable to the 5 th Ins ection Interval.

Date and revision of inspection plans  : 5 th Inspection Interval Inspection Plans - Volume 1- 08/25/2022 {Version 6.0), Volume 3 - 04/07/2022 /Version 5.0), Volume 4 - 12/27/2022 /Version 4.0), and Volume 5 -

06/09/2022 /Version 4.0) . 1 R31 Outage Plan - 05/19/2022 /Version 1.0) with 1 R31 Outage Plan Scope Change SC-001 - 9/19/2022 and 1 R31 Outage Plan Scope Change SC-002 - 10/26/2022

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans  : Same

Code Cases used for inspection and evaluation: N-729-6, N-716-1, N-776, N-532-5, and N-805 (ii applicable. including cases modified by Case N-532 and tater revisions)

CERTIFICATE OF CONFORMANCE

I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 1 R~31~------

conform lo the requirements of Section XI. (rerueling outage number)

Director Date

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT. have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

~ -z/w/j}/

Jeffer Sn der Commission --c'1c:=2.,,8'""4,_.3'::""'-l <Nationa1 Board Number and Endorsement) -'-:-N:,.,'-'R'-c--,--::---:----,,------

Date

E2-1 to NL-24-0003 Supplemental Form OAR-1 Owner's Activity Report Signature Pages

FORM OAR-1 OWNER'S ACTIVITY REPORT

Report Number __ ..... 1--'-5""*=2'--1-'--'-(U=-'-'n "'""it--'1'"'"1 --=5'-th_ l"-n  ;=.te=rv""'""'a ""'l,--=2"-n_d--'-p--=e"'"r""io"""d'-'-1_st___, R""'"e=p.,_ o=rt'"")..__ _____________ _

1 ---'

Plant _____ J=--o=s=e'""p"-h'"""M"""'". -'--F=a ~rl=e.,_y--'-N=u=c~le=a=r--'-P___, l=a ~nt~--------------------

Unit No* -------,~~--c,1 applic able ) Commercial service date December 01, 1977 Refueling outage no . ~ 1--'-R~3~0~---

Current inspection interval __ .,.,5c..th ________________________________ _

(1st. 2nd . 3rd. 4th. other)

Current inspection period __ _._ n_ d ________________________________ _

(1st. 2nd . 3rd)

Edition and Addenda of Section XI applicable to the inspection plans  : The 2007 Edition through 2008 Addenda is a pp!jcable to the 5th Inspection Interval

Date and revision of inspection plans  : 5th Inspection Interval Inspection Plans - Volume 1- 10/11/2020 (Version 5.0). Volume 3 - 3/17/2021 (Version 4 .0). Volume 4 - 3/18/2021 (Version 3.0). and Volume 5 - 3/2/2021 (Version 3.0). 1 R30 Outage Plan - 3/18/2021 (Version 1.0) with 1 R30 Outage Plan Scope Change SC-001

- 4/8/2021 and 1R30 Outage Plan Scope Change SC-002 - 4/16/2021

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans  : Same

Code Cases used for inspection and evaluation  : N-716-1, N-722-1, N-776, N-513-4, N-532-5, N-648-2, and N-770-5 (d applicable , includ ing cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE

I certify that (a) the statements made in this report are correct; {b) the examinations and tests meet the Inspection Plan as requ ired by the ASME Code, Section XI  ; and (c) the repair/replacement activities and evaluations supporting the completion of ___ --'-1 ~R=3~0~-----

conform to the requirements of Section XI. (refueling outa ge num b er)

Signed J . W . Carroll Director Date 2-113/2.i:>-i.'4,

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford, CT. have inspected the items described in this Owner ' s Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty , expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind ar ising from or connected with this inspection .

Jeffery Snyder /)~ )____ ~- Commission _,1""2""8'"'4"""3'---'-1 _,_N-'--'-'R,..___ _________ _

Inspector's S~ ~ (National Board Number and Endorsement)

Date .,), IY .,_,;.

E2-2