SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000348/2024401 AND 05000364/2024401

Dear Jamie M. Coleman:

On August 29, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Joseph M. Farley Nuclear Plant and discussed the results of this inspection with E. Dean III and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000348 and 05000364 License Nos. NPF-2 and NPF-8

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000348 and 05000364

License Numbers:

NPF-2 and NPF-8

Report Numbers:

05000348/2024401 and 05000364/2024401

Enterprise Identifier:

I-2024-401-0056

Licensee:

Southern Nuclear Operating Co., Inc.

Facility:

Joseph M. Farley Nuclear Plant

Location:

Columbia, AL

Inspection Dates:

August 26, 2024 to August 29, 2024

Inspectors:

M. Denman, Physical Security Inspector

D. Egelstad, Physical Security Inspector

R. Patterson, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Joseph M. Farley Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.05 - Protective Strategy Evaluation

The inspectors evaluated the licensee's protective strategy through completion of the following

procedure elements: Protective Strategy Evaluation

(1)

  • Tier I: All Requirements
  • Tier II: (02.05 a, 02.06 a-d, f, h, j, k, l, n, 02.07 b-d)
  • Tier III: (02.08, 02.09 b, 02.10, 02.11)

(2)

  • Observed a licensee-conducted Force-on-Force exercise.

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 29, 2024, the inspectors presented the security baseline inspection results to E. Dean III and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

10841886,

10841901,

10992925,

10992926,

10993461,

10993469,

11000059

Corrective Action

Documents

Resulting from

Inspection

11105678,

11106074,

11106066,

11106068,

11106038,

11106030,

11106049,

11106055,

11106059,

11106062,

11106027,

11106063,

11106070,

11106047,

11106050,

11106058,

11106338

Unattended Openings Analysis

3/14/2016

Blast Effects Vulnerability Assessment

2/30/2015

23 Annual Security Exercise Documentation

23 Quarterly Security Drill Documentation

24 Annual

Security Exercise

Documentation

71130.05

Miscellaneous

24 Quarterly

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Security Drill

Documentation

FNP-0-SP-10.0-

F01

Motor Patrol Checklist

Ver. 6.0

S-SE-LM-11700-

SNC Adversary Training

January 21,

20

S-SE-LM-11800-

Drill Controller Training

May 22,

2017

S-SE-LP-11700-

SNC Adversary Training

June 20,

2016

S-SE-LP-11800-

Drill Controller Initial/Continuing Training

Revision 7

Southern Nuclear Operating Company Physical Security

Plan

Ver. 18.0

FNP-0-SP-10

Patrol Procedures

Ver. 36.0

FNP-0-SP-20.0

Support from Local Law Enforcement Agencies

Ver. 13.0

FNP-0-SP-31.0

Vehicle Barrier System

Ver. 11.0

FNP-0-SP-33.0

FNP Target Sets

Ver. 14.0

FNP-0-SP-34.0

FNP Security Response

Ver. 30.0

NMP-AD-005

Insider Mitigation Program (IMP) Access Authorization

Ver. 9.2

NMP-AD-013

Control of Safeguards Information

Ver. 5.1

NMP-SE-006

Security Drill and Exercise Program

Version 10

NMP-SE-012

Safety/Security Interface

Ver. 7.0

NMP-SE-012-001

FNP Operations/Security Interface for Reporting Security

Diesel/UPS and SWIS UPS Deficiencies

Version 2

Procedures

NMP-SE-012-F01

Safety/Security Impact Checklist

Ver. 1.0