IR 05000346/2015405; on 05/18/2015 - 05/21/2015; Davis-Besse Nuclear Power Station; Routine Security Baseline Inspection. (Cover Letter Only)
ML15167A357
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/16/2015
From: Orth S K
Plant Support Branch II
To: Lieb R
FirstEnergy Nuclear Operating Co
References
IR 2015405
Download: ML15167A357 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 June 16, 2015 Mr. Raymond Lieb Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A

-DB-3080 Oak Harbor, OH 43449

-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000346/2015405

Dear Mr. Lieb:

On May 21 , 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection

, at your Davis-Besse Nuclear Power Station. On May 21, 2015, the NRC inspectors discussed the results of this inspection with Mr. D. Saltz, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No NRC-identified or self

-revealing findings were identified during this inspection.

However, the inspectors documented one licensee-identified violation, which w as determined to be of very low security significance in this report. The NRC is treating this violation as a Non-Cited Violation (NCV) consistent with Section 2.3.2a of the Enforcement Policy.

If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis of your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555

-0001; with copies to the Regional Administrator

, Region III

the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555

-0001; and the NRC Resident Inspector at the Davis-Besse Nuclear Power Station. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Enclosure contains Sensitive Unclassified Non

-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerability.

Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security

-Related Information is necessary to provide an acceptable response, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/

Steven K. Orth

, Chief Plant Support Branch Division of Reactor Safety Docket No.

50-346 License No. NPF-3 Nonpublic

Enclosure:

Inspection Report 05000346/201 5 40 5

w/Attachment:

Supplemental Information cc w/encl:

N. Simonian, NSIR/DSO/DDSO/ST E. Wharton, NSIR IR T. Dimitriadis, RI B. Desai, RII C. Pederson, RIII D. Roberts, RIII M. Haire, RIV M. Bear, State Liaison Officer, Ohio Emergency Management Agency

cc w/o encl: Distribution via LISTSERV