Comanche Peak Nuclear Power Plant, Units 1 and 2, NRC Security Inspection Report 05000445/2017404 and 05000446/2017404
ML17342B410
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/07/2017
From: Groom J R
Plant Support Branch-1
To: Peters K J
Vistra Operations Company
References
IR 2017404
Download: ML17342B410 (3)


Text

December 7, 2017

Mr. Ken J. Peters, Senior Vice President and Chief Nuclear Officer Attention: Regulatory Affairs

Vistra Operations Company LLC P.O. Box 1002 Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000445/2017404 AND

05000446/2017404

Dear Mr. Peters:

On November 16, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Comanche Peak Nuclear Power Plant, Units 1 and 2. The NRC inspectors discussed the results of this inspection with Mr. J. Dreyfuss, Plant Manager, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any finding or violation of more than minor significance. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89

Nonpublic

Enclosure:

Inspection Report 05000445/2017404,

05000446/2017404

w/Attachment:

Supplemental Information

cc w/o encl: Electronic Distribution

ML17342B407

Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17342B410 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By: Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen RLanfear JGroom MHaire JGroom SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

DATE 12/06/17 11/27/17 12/6/17 12/6/17 12/7/17