Category:INSPECTION REPORT
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring IR 05000461/19970111997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure IR 05000461/19970131997-07-14014 July 1997 Insp Rept 50-461/97-13 on 970519-23.Violations Noted.Major Areas Inspected:Plant Support Performance & Effectiveness of RP & Chemistry Programs IR 05000461/19970051997-06-16016 June 1997 Insp Rept 50-461/97-05 on 970211-0514.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19970061997-05-16016 May 1997 Insp Rept 50-461/97-06 on 970215-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20138K1791997-05-0505 May 1997 Insp Rept 50-461/97-03 on 970106-0307.Violations Noted. Major Areas Inspected:Engineering,Engineering Procedures, Documentation & Condition Repts IR 05000461/19970021997-03-13013 March 1997 Insp Rept 50-461/97-02 on 960106-10 & 31.Violations Noted. Major Areas Inspected:Review of EP Program,An Aspect of Plant Support ML20147E4071997-02-11011 February 1997 Insp Rept 50-461/96-09 on 960730-1212.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19960101996-11-19019 November 1996 Insp Rept 50-461/96-10 on 960905-1004.No Violations Noted. Major Areas Inspected:Operations & Engineering IR 05000461/19940161994-11-10010 November 1994 Insp Rept 50-461/94-16 on 941003-07.No Violations Noted. Major Areas Inspected:Radiation Protection Program IR 05000461/19930241993-12-23023 December 1993 Insp Rept 50-461/93-24 on 931115-1203.Violations Noted.Major Areas Inspected:Licensee Incorporation of GL 89-04 IR 05000461/19930191993-11-11011 November 1993 Insp Rept 50-461/93-19 on 930914-1025.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000461/19930181993-09-23023 September 1993 Partially Withheld Physical Security Insp Rept 50-461/93-18 on 930913-17 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Vital Area Physical Barriers,Alarm Stations & Communications ML20057B8181993-09-16016 September 1993 Insp Rept 50-461/93-10 on 930706-0824.Violations Noted.Major Areas Inspected:Engineering & Technical Support & Mgt Activities IR 05000461/19930161993-08-19019 August 1993 Partially Deleted Insp Rept 50-461/93-16 on 930709-13,ref 10CFR73.21(c)(2).No Violations Noted.Major Areas Inspected: Mgt Support & Effectiveness,Protected & Vital Area Physical Barriers & Detection & Assessments Aids IR 05000461/19930131993-08-18018 August 1993 Insp Rept 50-461/93-13 on 930629-0809.No Violations Noted. Major Areas Inspected:Licensee Actions on Plant Operations IR 05000461/19930121993-06-19019 June 1993 Insp Rept 50-461/93-12 on 930621-25.No Violation Noted. Major Areas Inspected:Radiation Program,Organization,Mgt Controls,Planning & Scheduling,Audits,Surveillances & Maintaining Occupational Exposures ALARA IR 05000461/19930061993-04-12012 April 1993 Insp Rept 50-461/93-06 on 930302-0408.Non-cited Violations Noted.Major Areas Inspected:Actions on Operations, Radiological Controls,Maint & Surveillance,Engineering & Technical Support & Mgt Meetings IR 05000461/19930051993-04-0808 April 1993 Insp Rept 50-461/93-05 on Stated Date.No Violations Noted. Major Areas Inspected:Verification That EOPs Technically Correct & Useable & That Program Maintained Quality of EOPs & Weaknesses Noted in Previous Insp ML20035B9491993-03-31031 March 1993 Insp Rept 50-461/93-03 on 930118-0219.Violations Noted.Major Areas Inspected:Selective Review of Design Calculations, Relevant Procedures,Representative Records,Installed Equipment & Interviews W/Engineering & Technical Staff IR 05000461/19930041993-03-11011 March 1993 Insp Rept 50-461/93-04 on 930120-0301.Violations Noted But Not Cited.Major Areas Inspected:Plant Operations, Radiological Controls,Maintenance & Surveillance,Engineering & Technical Support & Safety Assessment IR 05000461/19920221993-01-26026 January 1993 Insp Rept 50-461/92-22 on 921208-930119.Non-cited Violation Noted.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance & Engineering & Technical Support IR 05000461/19920211992-12-22022 December 1992 Insp Rept 50-461/92-21 on 921130-1204.No Violations Noted. Major Areas Inspected:Radwaste Processing & Transportation Program W/Special Emphasis on 10CFR61 Requirements for Disposal of Radwaste IR 05000461/19910091991-06-0404 June 1991 Insp Rept 50-461/91-09 on 910422-26.No Violations Noted. Major Areas Inspected:Implementation of Licensee Fire Protection Program & General Observations of Fire Protection Equipment IR 05000461/19900221990-11-0202 November 1990 Insp Rept 50-461/90-22 on 901015-19.Violation Noted But Not Cited.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage IR 05000461/19900201990-10-18018 October 1990 Insp Rept 50-461/90-20 on 900924-28.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & QA & QC Programs in Labs IR 05000461/19900191990-10-0303 October 1990 Insp Rept 50-461/90-19 on 900922-1003.No Violations Noted. Major Areas Inspected:Operational Safety,Event follow-up, Radiological Controls,Maint & Surveillance,Emergency Preparedness & LERs IR 05000461/19900151990-08-0303 August 1990 Insp Rept 50-461/90-15 on 900723-27.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Involving Followup on Licensee Actions on Previously Identified Items IR 05000461/19900111990-07-25025 July 1990 Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings IR 05000461/19900101990-07-0606 July 1990 Partially Withheld Physical Security Insp Rept 50-461/90-10 on 900507-21.Violations Withheld.Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Physical Barriers.Withheld (Ref 10CFR73.21) IR 05000461/19900081990-04-26026 April 1990 Insp Rept 50-461/90-08 on 900410-12.No Violations Noted. Major Areas Inspected:Licensee Snubber Surveillance & Functional Testing Program & Actions Associated W/Snubber Reduction Program IR 05000461/19900021990-04-13013 April 1990 Special Team Insp Rept 50-461/90-02 on 900226-0306.Violation Noted.Major Areas Inspected:Maint,Operations Interface,Mgt Controls & post-trip Review Analysis for balance-of-plant Sys IR 05000461/19900071990-04-12012 April 1990 Safety Insp Rept 50-461/90-07 on 900326-29.Noncited Violation Noted Re Upgrading Environ Qualification Program. Major Areas Inspected:Corrective Actions Re Environ Qualification Program & Rosemount Transmitters IR 05000461/19890381990-02-16016 February 1990 Insp Rept 50-461/89-38 on 891219-900202.Violations Noted. Major Areas Inspected:Routine,Unannounced Safety Insp by Resident Inspectors of Licensee Action on Previous Insp Findings,Operational Safety & Followup IR 05000461/19890301990-01-22022 January 1990 Insp Rept 50-461/89-30 on 890925-1003.No Violations Noted. Major Areas Inspected:Licensee Integrated Plant Operations & Performance of Organizations That Control & Support Plant Operation IR 05000461/19890341990-01-17017 January 1990 Safety Insp Rept 50-461/89-34 on 891101-1218.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Event Followup,Radiation Control,Maint/Surveillance, Security,Engineering/Technical Support & LERs IR 05000461/19890371990-01-12012 January 1990 Insp Rept 50-461/89-37 on 891211-15.Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operations,Audits & Surveillances,Changes in Organization Personnel or Facilities & Exposure Controls IR 05000461/19890291989-11-0909 November 1989 Table 2 to Insp Rept 50-461/89-29 Re Confirmatory Measurements Program for Facility 1999-04-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program IR 05000461/19980091998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000461/19980071998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000461/19970251998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980021998-02-0202 February 1998 Insp Rept 50-461/98-02 on 980105-09.No Violations Noted. Major Areas Inspected:Plant Support Performance & Specifically Evaluation of Effectiveness of RP Program IR 05000461/19970241998-01-0202 January 1998 Insp Rept 50-461/97-24 on 971201-05.No Violations Noted. Major Areas Inspected:Plant Support Activities.Selective Elements of Access Authorization Program,Security Communication Sys & Testing Were Reviewed & Evaluated IR 05000461/19970231997-12-23023 December 1997 Insp Rept 50-461/97-23 on 971103-07.No Violations Noted. Major Areas Inspected:Findings & Conclusions from Insp of Licensed RO & SRO Requalification Training Programs ML20198L2741997-12-22022 December 1997 Insp Rept for Clinton Power Station on 970923-1003 & 1020-31.Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000461/19970221997-12-22022 December 1997 Insp Rept 50-461/97-22 on 971007-1124.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS ML20199A8771997-11-12012 November 1997 Insp Rept 50-461/97-19 on 970826-1006.Violations Noted.Major Areas Inspected:Operations,Maint,Engneering & Plant Support IR 05000461/19970151997-11-12012 November 1997 Insp Rept 50-461/97-15 on 970707-0825.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970071997-09-29029 September 1997 Insp Rept 50-461/97-07 on 970313-0522.No Violations Noted. Major Areas Inspected:Licensee Operations & Surveillance Testing IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring IR 05000461/19970111997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure IR 05000461/19970131997-07-14014 July 1997 Insp Rept 50-461/97-13 on 970519-23.Violations Noted.Major Areas Inspected:Plant Support Performance & Effectiveness of RP & Chemistry Programs IR 05000461/19970051997-06-16016 June 1997 Insp Rept 50-461/97-05 on 970211-0514.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support 1999-08-19
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19970181997-11-24024 November 1997 AIT Insp Rept 50-461/97-18 on 970805-18.Violations Noted. Major Areas Inspected:Circumstances Surrounding 970805 & 970722 RHR Pump a Circuit Breaker Failures at CPS IR 05000461/19970201997-10-11011 October 1997 Insp Rept 50-461/97-20 on 970707-0829.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering & Maint IR 05000461/19970171997-08-25025 August 1997 Insp Rept 50-461/97-17 on 970714-18 & 27-28.No Violations Noted.Major Areas Inspected:Review of Gaseous & Liquid Radwaste Programs Including Effluent Releases & Monitoring IR 05000461/19970111997-07-25025 July 1997 Insp Rept 50-461/97-11 on 970407-0523.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20149J5211997-07-15015 July 1997 Insp Rept 50-461/97-12 on 961209-970703.No Violations Noted. Major Areas Inspected:Review of Specific Commitments Licensee Made in Response to Confirmatory Action Ltrs Associated w/960905 Reactor Recirculation Pump Seal Failure IR 05000461/19970131997-07-14014 July 1997 Insp Rept 50-461/97-13 on 970519-23.Violations Noted.Major Areas Inspected:Plant Support Performance & Effectiveness of RP & Chemistry Programs IR 05000461/19970051997-06-16016 June 1997 Insp Rept 50-461/97-05 on 970211-0514.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19970061997-05-16016 May 1997 Insp Rept 50-461/97-06 on 970215-0329.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20138K1791997-05-0505 May 1997 Insp Rept 50-461/97-03 on 970106-0307.Violations Noted. Major Areas Inspected:Engineering,Engineering Procedures, Documentation & Condition Repts IR 05000461/19970021997-03-13013 March 1997 Insp Rept 50-461/97-02 on 960106-10 & 31.Violations Noted. Major Areas Inspected:Review of EP Program,An Aspect of Plant Support ML20147E4071997-02-11011 February 1997 Insp Rept 50-461/96-09 on 960730-1212.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19960101996-11-19019 November 1996 Insp Rept 50-461/96-10 on 960905-1004.No Violations Noted. Major Areas Inspected:Operations & Engineering IR 05000461/19940161994-11-10010 November 1994 Insp Rept 50-461/94-16 on 941003-07.No Violations Noted. Major Areas Inspected:Radiation Protection Program IR 05000461/19930241993-12-23023 December 1993 Insp Rept 50-461/93-24 on 931115-1203.Violations Noted.Major Areas Inspected:Licensee Incorporation of GL 89-04 IR 05000461/19930191993-11-11011 November 1993 Insp Rept 50-461/93-19 on 930914-1025.Violations Noted.Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000461/19930181993-09-23023 September 1993 Partially Withheld Physical Security Insp Rept 50-461/93-18 on 930913-17 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Vital Area Physical Barriers,Alarm Stations & Communications ML20057B8181993-09-16016 September 1993 Insp Rept 50-461/93-10 on 930706-0824.Violations Noted.Major Areas Inspected:Engineering & Technical Support & Mgt Activities IR 05000461/19930161993-08-19019 August 1993 Partially Deleted Insp Rept 50-461/93-16 on 930709-13,ref 10CFR73.21(c)(2).No Violations Noted.Major Areas Inspected: Mgt Support & Effectiveness,Protected & Vital Area Physical Barriers & Detection & Assessments Aids IR 05000461/19930131993-08-18018 August 1993 Insp Rept 50-461/93-13 on 930629-0809.No Violations Noted. Major Areas Inspected:Licensee Actions on Plant Operations IR 05000461/19930121993-06-19019 June 1993 Insp Rept 50-461/93-12 on 930621-25.No Violation Noted. Major Areas Inspected:Radiation Program,Organization,Mgt Controls,Planning & Scheduling,Audits,Surveillances & Maintaining Occupational Exposures ALARA IR 05000461/19930061993-04-12012 April 1993 Insp Rept 50-461/93-06 on 930302-0408.Non-cited Violations Noted.Major Areas Inspected:Actions on Operations, Radiological Controls,Maint & Surveillance,Engineering & Technical Support & Mgt Meetings IR 05000461/19930051993-04-0808 April 1993 Insp Rept 50-461/93-05 on Stated Date.No Violations Noted. Major Areas Inspected:Verification That EOPs Technically Correct & Useable & That Program Maintained Quality of EOPs & Weaknesses Noted in Previous Insp ML20035B9491993-03-31031 March 1993 Insp Rept 50-461/93-03 on 930118-0219.Violations Noted.Major Areas Inspected:Selective Review of Design Calculations, Relevant Procedures,Representative Records,Installed Equipment & Interviews W/Engineering & Technical Staff IR 05000461/19930041993-03-11011 March 1993 Insp Rept 50-461/93-04 on 930120-0301.Violations Noted But Not Cited.Major Areas Inspected:Plant Operations, Radiological Controls,Maintenance & Surveillance,Engineering & Technical Support & Safety Assessment IR 05000461/19920221993-01-26026 January 1993 Insp Rept 50-461/92-22 on 921208-930119.Non-cited Violation Noted.No Violations or Deviations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance & Engineering & Technical Support IR 05000461/19920211992-12-22022 December 1992 Insp Rept 50-461/92-21 on 921130-1204.No Violations Noted. Major Areas Inspected:Radwaste Processing & Transportation Program W/Special Emphasis on 10CFR61 Requirements for Disposal of Radwaste IR 05000461/19910091991-06-0404 June 1991 Insp Rept 50-461/91-09 on 910422-26.No Violations Noted. Major Areas Inspected:Implementation of Licensee Fire Protection Program & General Observations of Fire Protection Equipment IR 05000461/19900221990-11-0202 November 1990 Insp Rept 50-461/90-22 on 901015-19.Violation Noted But Not Cited.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage IR 05000461/19900201990-10-18018 October 1990 Insp Rept 50-461/90-20 on 900924-28.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & QA & QC Programs in Labs IR 05000461/19900191990-10-0303 October 1990 Insp Rept 50-461/90-19 on 900922-1003.No Violations Noted. Major Areas Inspected:Operational Safety,Event follow-up, Radiological Controls,Maint & Surveillance,Emergency Preparedness & LERs IR 05000461/19900151990-08-0303 August 1990 Insp Rept 50-461/90-15 on 900723-27.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Involving Followup on Licensee Actions on Previously Identified Items IR 05000461/19900111990-07-25025 July 1990 Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings IR 05000461/19900101990-07-0606 July 1990 Partially Withheld Physical Security Insp Rept 50-461/90-10 on 900507-21.Violations Withheld.Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Physical Barriers.Withheld (Ref 10CFR73.21) IR 05000461/19900081990-04-26026 April 1990 Insp Rept 50-461/90-08 on 900410-12.No Violations Noted. Major Areas Inspected:Licensee Snubber Surveillance & Functional Testing Program & Actions Associated W/Snubber Reduction Program IR 05000461/19900021990-04-13013 April 1990 Special Team Insp Rept 50-461/90-02 on 900226-0306.Violation Noted.Major Areas Inspected:Maint,Operations Interface,Mgt Controls & post-trip Review Analysis for balance-of-plant Sys IR 05000461/19900071990-04-12012 April 1990 Safety Insp Rept 50-461/90-07 on 900326-29.Noncited Violation Noted Re Upgrading Environ Qualification Program. Major Areas Inspected:Corrective Actions Re Environ Qualification Program & Rosemount Transmitters IR 05000461/19890381990-02-16016 February 1990 Insp Rept 50-461/89-38 on 891219-900202.Violations Noted. Major Areas Inspected:Routine,Unannounced Safety Insp by Resident Inspectors of Licensee Action on Previous Insp Findings,Operational Safety & Followup IR 05000461/19890301990-01-22022 January 1990 Insp Rept 50-461/89-30 on 890925-1003.No Violations Noted. Major Areas Inspected:Licensee Integrated Plant Operations & Performance of Organizations That Control & Support Plant Operation IR 05000461/19890341990-01-17017 January 1990 Safety Insp Rept 50-461/89-34 on 891101-1218.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Event Followup,Radiation Control,Maint/Surveillance, Security,Engineering/Technical Support & LERs IR 05000461/19890371990-01-12012 January 1990 Insp Rept 50-461/89-37 on 891211-15.Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operations,Audits & Surveillances,Changes in Organization Personnel or Facilities & Exposure Controls IR 05000461/19890291989-11-0909 November 1989 Table 2 to Insp Rept 50-461/89-29 Re Confirmatory Measurements Program for Facility 1999-04-09
[Table view] Category:UTILITY
MONTHYEARIR 05000461/19900221990-11-0202 November 1990 Insp Rept 50-461/90-22 on 901015-19.Violation Noted But Not Cited.Major Areas Inspected:Radiation Protection Program During Refueling/Maint Outage IR 05000461/19900201990-10-18018 October 1990 Insp Rept 50-461/90-20 on 900924-28.No Violations Noted. Major Areas Inspected:Chemistry Program,Including Procedures,Organization & Training,Reactor Sys Water QC Programs & QA & QC Programs in Labs IR 05000461/19900151990-08-0303 August 1990 Insp Rept 50-461/90-15 on 900723-27.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise Involving Followup on Licensee Actions on Previously Identified Items IR 05000461/19900111990-07-25025 July 1990 Safety Insp Rept 50-461/90-11 on 900512-0703.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiological Controls,Maint/Surveillance,Lers,Tmi Items & Meetings IR 05000461/19900101990-07-0606 July 1990 Partially Withheld Physical Security Insp Rept 50-461/90-10 on 900507-21.Violations Withheld.Major Areas Inspected:Mgt Support,Security Program Plans & Audits,Protected & Vital Area Physical Barriers.Withheld (Ref 10CFR73.21) IR 05000461/19900131990-06-14014 June 1990 Enforcement Conference Rept 50-461/90-13 on 900531.Matters Discussed:Circumstances Surrounding Events on 900411 Which Led to Withdrawal of Control Rods While Main Turbine Bypass Valves Open in Violation of Tech Spec 3.1.4.1 IR 05000461/19900141990-06-11011 June 1990 Enforcement Conference Rept 50-461/90-14 on 900605.Major Areas Discussed:Failure to Ensure Operability of Svc Water Sys,Control Room Ventilation Sys & Divs I & II Diesel Generators IR 05000461/19900121990-06-0404 June 1990 Insp Rept 50-461/90-12 on 900518-31.Violations Noted.Major Areas Inspected:Design Deviation Which Occurred During Original Const & Errors in Repositioning Shutdown Svc Water Isolation Valves IR 05000461/19900061990-06-0101 June 1990 Insp Rept 50-461/90-06 on 900317-0511.Noncited Violations Noted.Major Areas Inspected:Previous Insp Findings, Operational Safety,Event Followup,New Fuel Receipt,Maint/ Surveillance & Mods & Changes to Facility IR 05000461/19900051990-05-30030 May 1990 Insp Rept 50-461/90-05 on 900314-0514.Violations Noted.Major Areas Inspected:Licensee Reportable Event of Inadequate Design Flow Through Components Using Shutdown Svc Water Sys for Cooling Water & Actions Associated W/Generic Ltr 89-13 ML20043A5611990-05-16016 May 1990 Corrected Page 7 to Safety Team Insp Rept 50-461/90-09 IR 05000461/19900081990-04-26026 April 1990 Insp Rept 50-461/90-08 on 900410-12.No Violations Noted. Major Areas Inspected:Licensee Snubber Surveillance & Functional Testing Program & Actions Associated W/Snubber Reduction Program IR 05000461/19900021990-04-13013 April 1990 Special Team Insp Rept 50-461/90-02 on 900226-0306.Violation Noted.Major Areas Inspected:Maint,Operations Interface,Mgt Controls & post-trip Review Analysis for balance-of-plant Sys IR 05000461/19900071990-04-12012 April 1990 Safety Insp Rept 50-461/90-07 on 900326-29.Noncited Violation Noted Re Upgrading Environ Qualification Program. Major Areas Inspected:Corrective Actions Re Environ Qualification Program & Rosemount Transmitters IR 05000461/19900041990-04-0404 April 1990 Insp Rept 50-461/90-04 on 900313-15 & 20-21.No Violations Noted.Major Areas Inspected:Radiological Protection Program During Planned Outage,Including Changes,Audits & Appraisals, External Exposure Control & Control of Radioactive Matls IR 05000461/19900011990-04-0303 April 1990 Safety Insp Rept 50-461/90-01 on 900203-0316.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Operational Safety,Event Followup,Radiation Controls,Maint/Surveillance,Engineering & LERs ML20012F0721990-03-28028 March 1990 Insp Rept 50-461/90-03 on 900305-16.No Violations or Deviations Noted.Major Areas Inspected:Actions Taken in Response to IE Bulletin 85-003 & Generic Ltr 89-10, Including Technical Procedures & Performance of Testing IR 05000461/19890381990-02-16016 February 1990 Insp Rept 50-461/89-38 on 891219-900202.Violations Noted. Major Areas Inspected:Routine,Unannounced Safety Insp by Resident Inspectors of Licensee Action on Previous Insp Findings,Operational Safety & Followup IR 05000461/19890301990-01-22022 January 1990 Insp Rept 50-461/89-30 on 890925-1003.No Violations Noted. Major Areas Inspected:Licensee Integrated Plant Operations & Performance of Organizations That Control & Support Plant Operation IR 05000461/19890341990-01-17017 January 1990 Safety Insp Rept 50-461/89-34 on 891101-1218.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety,Event Followup,Radiation Control,Maint/Surveillance, Security,Engineering/Technical Support & LERs IR 05000461/19890371990-01-12012 January 1990 Insp Rept 50-461/89-37 on 891211-15.Violations Noted.Major Areas Inspected:Radiological Protection Program During Power Operations,Audits & Surveillances,Changes in Organization Personnel or Facilities & Exposure Controls IR 05000461/19890351989-12-0707 December 1989 Insp Rept 50-461/89-35 on 891113-17.Violations Noted.Major Areas Inspected:Emergency Preparedness Program,Including Followup on Actual Emergency Plan Activations & Operational Status of Emergency Preparedness Program IR 05000461/19890311989-11-29029 November 1989 Partially Withheld Insp Rept 50-461/89-31 on 891016-1031 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected: Closed Circuit Television Assessment Capability,Security Power Supply,Access Control Personnel & Mgt Support IR 05000461/19890361989-11-17017 November 1989 Insp Rept 50-461/89-36 on 891002-26 & 1108.No Violations Noted.Major Areas Inspected:Licensee Activities W/Respect to Inservice Testing of Selected Standby Liquid Control Sys Components IR 05000461/19890291989-11-0909 November 1989 Table 2 to Insp Rept 50-461/89-29 Re Confirmatory Measurements Program for Facility IR 05000461/19890271989-10-23023 October 1989 Safety Insp Rept 50-461/89-27 on 890818-1006.Violation Noted.Major Areas Inspected:Util Action on Previous Insp Findings,Onsite Followup of Written Repts,Nrc Compliance Bulletin Followup & Operational Safety Verification IR 05000461/19890281989-10-0404 October 1989 Insp Rept 50-461/89-28 on 890911-15.Violations Noted.Major Areas Inspected:Fire Protection Program,Including Review of Fire Protection Organization,Administrative Controls & Fire Protection Sys Surveillance Test Program IR 05000461/19890241989-08-17017 August 1989 Insp Repts 50-461/89-24 on 890801-04.No Violations Noted. Major Areas Inspected:Radiological Protecction,Radwaste & Transportation Programs Including,Aspects of Licensee Operational Radiation Protection IR 05000461/19890221989-07-27027 July 1989 Insp Rept 50-461/89-22 on 890619-0721.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing Activities Subsequent to Initial Refueling Outage,Areas of Core Performance & Nuclear Engineering IR 05000461/19890181989-07-18018 July 1989 Safety Insp Rept 50-461/89-18 on 890512-0707.Violations Noted.Major Areas Inspected:Previous Insp Findings,Onsite Followup of Written Repts,Allegation Followup,Operational Safety Verification & Monthly Maint Observation IR 05000461/19890211989-07-14014 July 1989 Insp Rept 50-461/89-21 on 890601-23.Violation Noted.Major Areas Inspected:Failure of Reactor Recirculation Pump B Seals & Subsequent Equipment Problems Which Occurred on 890601.Several Weaknesses Identified IR 05000461/19890201989-07-12012 July 1989 Insp Rept 50-461/89-20 on 890627-29.No Violations Noted. Major Areas Inspected:Annual Emergency Preparedness Exercise & Evaluation of 890601 Emergency Plan Activation IR 05000461/19890191989-06-23023 June 1989 Partially Withheld Safeguards Insp Rept 50-461/89-19 on 890206 & 0522-0607 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Protected & Vital Area Barriers, Access Control - Personnel,Packages & Vehicles & Testing IR 05000461/19890231989-06-21021 June 1989 Enforcement Conference Rept 50-461/89-23 on 890614.Matters Discussed:Apparent Violation of 10CFR50.49,Paragraphs (F) & (G) Re Hydrogen Igniter Field Connections,Instrument Circuits Landed on Terminal Blocks in GE Instrument Racks IR 05000461/19890161989-06-14014 June 1989 Safety Insp Rept 50-461/89-16 on 890227-0303 & 890316-17.No Violations Noted.Major Areas Inspected:Followup on Allegation RIII-87-A-0027,involving Containment Integrity & Inservice Testing Program IR 05000461/19890141989-06-0808 June 1989 Insp Rept 50-461/89-14 on 890316-0530.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Regional Request,Nrc Compliance Bulletin & Generic Ltr Followup & Monthly Maint Observation IR 05000461/19890171989-05-19019 May 1989 Insp Rept 50-461/89-17 on 890403-27.No Violations Noted. Major Areas Inspected:Field Alterations & Plant Mods & Dedication of commercial-grade Equipment for safety-related Applications IR 05000461/19890031989-05-10010 May 1989 Insp Rept 50-461/89-03 on 890123-26,0227-28 & 0313-0407. Violation Noted.Major Areas Inspected:Maint,Support of Maint & Related Mgt Activities IR 05000461/19890121989-04-14014 April 1989 Insp Rept 50-461/89-12 on 890301-03 & 31.No Violations or Deviations Noted.Major Areas Inspected:Verification That SSER6 Required Remote Shutdown Sys Mods Installed Prior to Startup from First Refueling IR 05000461/19890081989-04-0505 April 1989 Insp Rept 50-461/89-08 on 890127-0316.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings, Followup of Info Notices & Regional Requests,Refueling Activities & Operational Safety Verification IR 05000461/19890131989-04-0404 April 1989 Insp Rept 50-461/89-13 on 890308-21.No Violations Noted. Major Areas Inspected:Allegation & Associated Issue Re Staffing Provisions for Emergency Response Organization at Plant IR 05000461/19890051989-04-0303 April 1989 Insp Rept 50-461/89-05 on 890119-0323.No Violations Noted. Major Areas Inspected:Review of Programs,Procedures, Observation of Work Activities,Data Review,Mod Activities & Licensee Action on Info Notice 88-003 IR 05000461/19890151989-03-28028 March 1989 Enforcement Conference Rept 50-461/89-15 on 890321.Matters Discussed:Apparent Violation Re Inadequate Licensee Action to Correct & Prevent Recurrence of Previously Identified Environ Qualification Deficiencies IR 05000461/19890061989-03-16016 March 1989 Safety Insp Rept 50-461/89-06 on 890206-0303.Violation Noted:Failure to Perform Adquate Corrective Action on Kynar Butt Splices & Junction Boxes.Major Areas Inspected:Lers,Reg Guide 1.97 Commitments & Torque Switches IR 05000461/19890041989-03-10010 March 1989 Insp Rept 50-461/89-04 on 890103-06,10-20 & 0224.No Violations Noted.Major Areas inspected:fitness-for-duty Issue Involving Senior Manager,Including Adherence W/Licensee Procedures in Determining If Employee Fit IR 05000461/19880301989-02-15015 February 1989 Safety Insp Rept 50-461/88-30 on 881206-890127.Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Review of Info Notices & Preparation for Refueling & Refueling Activities IR 05000461/19880251988-10-21021 October 1988 Insp Rept 50-461/88-25 on 880926-1014.No Violations or Deviations Noted.Weaknesses Noted Re Training for non-operating Personnel Performing safety-related Activities.Major Areas Inspected:Generic Ltr 83-28 IR 05000461/19880261988-10-19019 October 1988 Insp Rept 50-461/88-26 on 880926-30.Violations Noted. Major Areas Inspected:Radiological Protection & Radwaste Mgt Programs,Including Organization & Mgt Controls,Internal Exposure Controls & Control of Radioactive Matls IR 05000461/19880201988-10-18018 October 1988 Insp Rept 50-461/88-20 on 880727-28 & 1018.Violations Noted. Major Areas Inspected:Followup on Allegation RIII-87-A-0027 IR 05000461/19880241988-10-0606 October 1988 Insp Rept 50-461/88-24 on 880114-16 & 19-20.No Violations Noted.Major Areas Inspected:Chemistry & Environ Radiological Monitoring Programs,Qa Program,Audits & Appraisals & Changes in Organization 1990-08-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000461/19990191999-10-15015 October 1999 Insp Rept 50-461/99-19 on 990913-17.Noncited Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of Radiation Protection Program IR 05000461/19990141999-10-0101 October 1999 Insp Repts 50-461/99-14 & 50-461/98-12 on 990729-0908.Two Violations Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20217J1481999-09-30030 September 1999 Notice of Violation from Investigation Conducted from 991028-980921.In Jan 1997,CH Tewksbury Engaged in Deliberate Misconduct That Caused Util to Be in Violation of 10CFR50.7 ML20217J1361999-09-30030 September 1999 Notice of Violation from Investigation on 971028-980921. Violation Noted:During Jan 1997,QV Dept Discriminated Against Qv Inspector,For Having Engaged in Protected Activities IR 05000461/19990131999-08-19019 August 1999 Insp Rept 50-461/99-13 on 990611-0728.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000461/19990101999-07-16016 July 1999 Insp Rept 50-461/99-10 on 990422-0610.Noncited Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000461/19990171999-07-0909 July 1999 Insp Rept 50-461/99-17 on 990607-11.No Violations Noted. Major Areas Inspected:Review of Access Authorization Program,Communications,Protected Areas Access Control of Personnel,Packages,Matl & Vehicles & Testing & Maint IR 05000461/19990121999-07-0707 July 1999 Insp Rept 50-461/99-12 on 990607-11.No Violations Noted. Major Areas Inspected:Evaluation of Effectiveness of Aspects of Chemistry & Radiation Protection Programs Including Quality Control of Lab & Inline Instrumentation PNO-III-99-028, on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed1999-05-28028 May 1999 PNO-III-99-028:on 990506,reactor Achieved Criticality Starting Up from Sept 1995 Outage.Region III Maintained Continuous Insp Coverage Throughout Restart Period.Info in Preliminary Notification Reviewed IR 05000461/19990041999-05-0505 May 1999 Insp Rept 50-461/99-04 on 990301-0407.Non-cited Violations Noted.Major Areas Inspected:Effectiveness of Operators to Safely Operate Facility ML20206G9821999-04-30030 April 1999 Notice of Violation from Insp on 990408-21.Violation Noted:Licensee,Despite Having Considered Issue Closed in Corrective Action Program,Failed to Correct Condition Adverse to Quality IR 05000461/19990011999-04-30030 April 1999 Insp Rept 50-461/99-01 on 990208-0325.Noncited Violation Noted.Major Areas Inspected:Operations,Maint & Plant Support IR 05000461/19990031999-04-21021 April 1999 Insp Rept 50-461/99-03 on 990208-0318.Eight Violations Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Engineering Organization Effectiveness & Readiness for Restart Through in-depth Review of Calculations IR 05000461/19990061999-04-21021 April 1999 Insp Rept 50-461/99-06 on 990217-0407.Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000461/19990081999-04-0909 April 1999 Insp Rept 50-461/99-08 on 990309-12.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19990071999-04-0101 April 1999 Insp Rept 50-461/99-07 on 990301-05.No Violations Noted. Major Areas Inspected:Review of Alarm Stations,Protected Area Detection & Assessment Aids IR 05000461/19980291999-03-24024 March 1999 Insp Rept 50-461/98-29 on 981214-990217.No Violations Noted. Major Areas Inspected:Review of Circumstances Surrounding High Number of Licensed Operator Failures That Occurred as Result of 1998 Annual Operator Requalification Exam IR 05000461/19990021999-03-18018 March 1999 Insp Rept 50-461/99-02 on 990107-0216.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering, & Plant Support ML20204E6931999-03-10010 March 1999 Notice of Violation from Insp on 990208-12.Violtion Noted: Licensee Did Not Make Adequate Surveys to Assure Compliance with 10CFR20.1902(b) Requiring Posting of Each High Radiation Area with Signs Displaying Listed Words IR 05000461/19990051999-03-10010 March 1999 Insp Rept 50-461/99-05 on 990208-12.Violation Noted.Major Areas Inspected:Evaluation of Effectiveness of Aspects of RP Program IR 05000461/19980281999-02-0101 February 1999 Insp Rept 50-461/98-28 on 981214-18.No Violations Noted. Major Areas inspected:follow-up Review of Licensee Program for Implementating 10CFR50.65,maint,quality Assurance Program & Engineering IR 05000461/19980201999-01-22022 January 1999 Insp Rept 50-461/98-20 on 981118-990106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support PNO-III-99-002, on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump1999-01-0808 January 1999 PNO-III-99-002:on 990106,partial Loss of Offsite Power Occurred.Power Lost to Rhrs,Normal Shutdown Cooling Sys & in Svc at Time of Event.Plant Three EDGs Started Automatically & Provided Power to Safety Sys.Power Restored to Rhrs Pump IR 05000461/19980271998-12-31031 December 1998 Insp Rept 50-461/98-27 on 981117-20.No Violations Noted. Major Areas Inspected:Licensee Performance During Exercise of Emergency Plan IR 05000461/19980181998-12-17017 December 1998 Insp Rept 50-461/98-18 on 981002-1117.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000461/19980261998-12-13013 December 1998 Insp Rept 50-461/98-26 on 981013-30.Violations Were Identified,But No Notice Was Issued.Major Areas Inspected: Engineering & Plant Support IR 05000461/19980191998-11-25025 November 1998 Insp Rept 50-461/98-19 on 980914-1009.No Violations Noted. Major Areas Inspected:Engineering ML20155E7131998-10-30030 October 1998 Notice of Violation from Insp on 980819-1001.Violation Noted:On 980909,operator Responding to Alarming Annunciator on Area Radiation Monitoring Sys Did Not Announce Annunciator to Control Room Supervisor IR 05000461/19980171998-10-30030 October 1998 Insp Rept 50-461/98-17 on 980819-1001.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000461/19980241998-10-29029 October 1998 Insp Rept 50-461/98-24 on 980921-1001.No Violations Noted. Major Areas Inspected:Review of Licensee Radiological Planning for ECC Suction Strainer Mod IR 05000461/19980251998-10-28028 October 1998 Insp Rept 50-461/98-25 on 981005-09.No Violations Noted. Major Areas Inspected:Portion of EP Program,Review of Documentation,Tours & Observations of Emergency Response Facilities & Equipment & Follow Up on Previous Findings IR 05000461/19983011998-10-0909 October 1998 NRC Operator Licensing Retake Exam Rept 50-461/98-301(OL) Administered to One Applicant Requesting SRO License on 980831-0904.Applicant Passed Operating Retake Exam But Not Issued SRO License to Operate Plant IR 05000461/19980141998-09-17017 September 1998 Insp Rept 50-461/98-14 on 980707-0818.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support ML20237B1531998-08-11011 August 1998 Notice of Violation from Insp on 980521.Violation Noted:On 980119,individual Exited RCA Utilizing Point Other than Designated Areas W/O Obtaining Approval from Radiological Operations Supervisor IR 05000461/19980111998-08-0707 August 1998 Insp Rept 50-461/98-11 on 980527-0710.Enforcement Discretion Being Exercised for Six Violations Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000461/19980131998-07-0808 July 1998 Insp Rept 50-461/98-13 on 980622-25.No Violations Noted. Major Areas Inspected:Effectiveness of Aspects of RP Program IR 05000461/19980091998-07-0707 July 1998 Insp Rept 50-461/98-09 on 980504-08.No Violations Noted. Major Areas Inspected:Review of Documentation Re Actual EP Activation,Evaluation of Quality of EP Program Related Audits & Reviews & Effectiveness of Mgt Controls ML20236L3071998-07-0707 July 1998 Notice of Violation from Insp on 980504-08.Violation Noted: on 980213,ERDS Not Initiated within 1 H of Declaration of Alert & Only One Electrical Maint Personnel on Shift Trained & Assigned as Member of Emergency Response Organization IR 05000461/19980081998-06-25025 June 1998 Insp Rept 50-461/98-08 on 980414-0528.Enforcement Discretion Has Been Authorized for Listed Violations.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20237E6641998-06-0505 June 1998 EN-98-044:informs Commission That NRC Intends to Exercise Enforcement Discretion & Not Issue Citation or Propose Civil Penalty for Four Violations of Maint Rule.Ltr Describing Action Will Be Issued on or About 980612 ML20248J8641998-06-0303 June 1998 Notice of Violation from Insp on 980511-15.Violation Noted: Between 980429 & 980513,control Rod Drive Filter Area on 712 Elevation of Turbine Building,Radiation Area W/Radiation Dose of 8 Mrem Per Hour,Was Not Posted W/Warning Sign IR 05000461/19980101998-06-0303 June 1998 Insp Rept 50-461/98-10 on 980511-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000461/19980061998-05-11011 May 1998 Insp Rept 50-461/98-06 on 980304-0414.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000461/19980071998-04-22022 April 1998 Insp Rept 50-461/98-07 on 980323-27.Violations Noted.Major Areas Inspected:Plant Support ML20217F4431998-04-22022 April 1998 Notice of Violation from Insp on 980323-27.Violation Noted: Description of Facility in USAR Not Accurate in All Matl Respects IR 05000461/19980031998-03-27027 March 1998 Insp Rept 50-461/98-03 on 980123-0303.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000461/19973131998-03-24024 March 1998 NRC Operator Licensing Exam Rept 50-461/97-313OL Conducted on 980126-0205.Exam Results:Exam Was Administered to Two RO & Seven SRO Applicants.Five SRO & Two RO Applicants Passed All Portions of Exam & Two SRO Applicants Failed ML20217D8511998-03-20020 March 1998 EN-98-014:informs Commission That NRC Will Exercise Enforcement Discretion Per Section VII.B.2 of Enforcement Policy & Not Issue NOV to Il Power Co for Several Violations Associated W/Loss of Shutdown Cooling Event on 980213 IR 05000461/19980041998-03-20020 March 1998 Insp Rept 50-461/98-04 on 980213-16.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000461/19970251998-02-13013 February 1998 Insp Rept 50-461/97-25 on 971125-980122.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support 1999-09-30
[Table view] |
Inspection Report - Clinton - 1987040 |
---|
|
|
Text
_ _ _ __ _
__
U.S. NUCLEAR REGULATORY COMMISSION l
REGION III
Report No. 50-461/87040(DRSS)
Docket No. 50-461 License No. NPF-62 Licensee:
Illinois Power Company 500 South 27th Street Decatur, IL 62525 Facility Name: Clinton Nuclear Power Station, Unit 1.
Inspection At: Clinton Nuclear Power Station, Clinton, Illinois Joint Public Information Center, Decator, Illinois Back-up Emergency Operations Facility, Decatur, Illinois Inspection Conducted:
December 8, 9, and, 16, 1987 Inspectors:
Ga L
1/r/ss
Date Ru L
iere
//f/AS'
Date Approved By: Wi m
, Chief
/k/oo Emergency Preparedness Date Section i
Inspection Sunnary
!
Inspection on December 8, 9, and 16,1987 (Report No. 50-461/87040(DRSS))
Areas Inspected: Special, announced inspection of the Clinton Nuclear Power Station emergency response facilities in regards to the NRC Site Team, incuding:
available facility space; facility layout; communications; and NRC computer compatibility.
Results:
For the areas inspected no violations, deficiencies, or deviations were identified.
$$hl$O0K h
G
,
_ mum __._m_____m.___--__mm
_. - _. _ _
-
.
_
-
- - - _ _ _ _ - - - - _ _ _ _ _ _ _ _ _ _ _ _
[:.
'-
,
t DETAILS 1.
Persons Contacted i
!
I Illinois Power Company l
l
- J. Perry, Manager, Nuclear Program Coordination
'
- E. Till, Emergency Preparedness. Coordinator R. Gardner, Supervisor, Emergency Planning B. Paulson, Media Relations Representative
- Denotes individuals that attended the exit interview on December 9, 1987.
2.
Available Facility Space
'
Emergency Operations Facility (EOF)
The EOF is located outside the station protected area fence approximately 1500 feet east of the Main Control Room (MCR) and Technical Support Center (TSC).
The EOF is contained within a metal Butler building, the E0F area being further enclosed by a perimeter wall of eight inch thick reinforced concrete.
The EOF is composed of a number of subareas, as follows:
(1) a personnel entrance / monitoring / holding area; (2) a Security Office located at the EOF entrance; (3) a personnel monitoring and decontamination room; (4) a storage area for radiation monitoring equipment, kits, instruments, supplies, and clothing; (5) a Radiation Protection Office; (6) an Environmental Sampling Analysis Laboratory; (7) a sample counting room; (8) a sample storage room; (9) a document room; (10) a NRC Office area; (11) the Emergency Managers' Of fice; (12) an E0F Conference Room; (13) an Offsite Dose Calculation Room; and (14) a Decision-making Area.
The space t.urrently available to the NRC in the EOF is adequate for the Expanded Activation Site Team (EAST) EOF component.
The Decision-making Area is sufficient in size for the NRC to collocate key response personnel with their licensce counterparts.
The document room would provide adequate space for several administrative personnel.
In addition, the NRC Office area could be made available to administrative personnel or protective measures staff if required.
The E0F Conference Room could also be used by NRC staff for conferences and briefings, when available.
The building which houses the EOF could provide additional space to the NRC if radiologic conditions did not render the space uninhabitable.
The E0F is a hardened facility and therefore can be occupied under conditions which would necessitate evacuation of the rest of the building.
If there is no release or if a release occurred and the plume did not travel over the E0F, space would be available to the NRC outside of the EOF but within j
the building.
I
-
E
-
_
._
-
_-_
- - _ _
- - - - -
'
,
Technical Support Center (TSC)
- The TSC is located between and immediately adjacent to the Main Control Room (MCR)'and the Operational Support Center (OSC), and on the same level..Two doors in the TSC (on opposite sides) exit to corridors which
,
'
lead to both the MCR and the OSC.
The TSC is located in a single room with several satellite offices available within the same shielding and ventilation envelope.
Available space in the TSC for the NRC is marginal.
The NRC would anticipate bringing a contingent of five to seven people to the TSC and would require space to accommodate a group of this size.
The NRC's goal
'is to be able to locate key NRC TSC response personnel with their licensee counterparts.
The TSC currently appears marginally capable of accommodating a contingent of this size.
Located across from the TSC is the NRC Consultation Room which is designated as office space for NRC personnel.
The room is designed to accommodate up to three people.
This area could be used by the NRC as space for communicators or other staff if necessary.
Backup Emergency Operations Facility (BEOF)
The BE0F is located in the city of Decatur, Illinois, approximately twenty miles from the plant site.
The BE0F would perform the functions of the EOF in the event the EOF were unavailable.
Space available to the NRC in the BEOF weJld be considered adequate in consideration of the fact that it is a backup facility.
The facility is considerably smaller than the E0F and therefore would present some difficulty in interfacing the NRC EAST EOF contingent.
Additional space is available to the NRC, within the building, in office areas near and adjacent to the BE0F.
This additional space coupled with the available space in the BE0F would provide adequate space for the NRC EAST EOF contingent.
Joint Public Information Center (JPIC)
The JPIC is located in Decatur, Illinois, approximately twenty miles from the plant.
The facility provides smple space for the NRC Public Affairs contingent in one of four offices located on the southeast side of the JPIC.
The licensee has purchased an additional building which, when remodeled, will house the JPIC.
The move from the current JPIC to the new facility is anticipated to take place in the next one to two years.
3.
Facility Layout Emergency Operations Facility (E0F)
i The layout of the E0F is structured to be functional and to give the
,
licensee the most efficient use of available space.
The current facility
layout does not specifically address positioning of the NRC EOF l
3 j
_ _ _ _ - _ _ _ - _ _ _
w contingent in the EOF Decision-making Area other than designating a position for the Director of Site Operations (D50).
Additional locations for NRC EOF response personnel would have to be designated and modifications made to the existing layout in order to accommodate NRC responders.
Minor modifications in seating arrangements and positioning would allow for the accommodation of the NRC EOF contingent in the EOF Decision-making Area.
The NRC Office area in the E0F is located adjacent to the EOF Decision-making Area and contains a window for viewing the decision-making area and status boards.
The NRC Office is not large enough nor is it structured to accommodate the E0F EAST contingent but could be used as an NRC management meeting area or as office space for a portion of the EOF contingent such as the Administrative Team or the Protective Measures
. Team.
The NRC Office space plus space available in the Decision-making Area and vicinity of the EOF will provide adequate space for a functional working layout.
Backup Emergency Operations Facility (BEOF)
The BEOF-is structured to accommodate key members of the utility EOF staff and the NRC DSO.
The current layout of the BEOF does not provide space for the NRC E0F contingent, other than the DSO.
As mentioned in Section 2 of this report, the BEOF itself is smaller in size than the EOF and would not be able to accommodate both the utility and the NRC EOF contingents.
Therefore, only key members of the NRC EOF staff would be able to collocate with their licensee counterparts.
Again, minor modifications in seating arrangements and positioning would be required j
to collocate the key E0F response personnel with their licensee counterparts in the BEOF.
Technical Support Center (TSC)
The layout of the TSC is currently designed to accommodate only licensee TSC staff.
It did not appear that any arrangements had been made for an NRC TSC contingent.
Modifications to the existing layout design would be required to collocate even a portion of the NRC TSC contingent with their licensee counterparts.
The NRC Consultation Room is located across from the TSC.
This room is designed to accommodate three individuals and has two desks located in it.
A portion of the NRC TSC staff could utilize this space under the current design.
Consideration should be given to layout design modifications in the TSC so that the NRC TSC staff can be more readily accommodated.
Joint Public Information Center (JPIC)
The layout of the JPIC is designed to provide ample working space for
,
public information officers and their staffs.
Consideration was given, in the design process, to the needs of the various federal, state, and
_ - _ _ _ _ _ _ _ __ _- __.. _ _ _ _ _ _ _ _ - _ _ - _ _ _ -
W media personnel stationed in the JPIC.
A general assembly room was designed to facilitate video camera work and has a public address system.
Provisions for security and the separation of the media from the PI0s had been made.
Separate office areas for federal, state, and utility personnel are designated within the JPIC.
Adjacent to these office areas is the administrative area where copy machines, facsimile telecopiers, and a word processor are located and available for use by all agencies.
Also, the administrative staff in this area may be utilized to till the needs of the federal and state public affairs staff.
No change or modifications to the existing layout design of the JPIC would be required to accommodate the NRC Public Affairs staff.
i 4.
Communications l
The Illinois Power Company's (IPC) dial telephone service is provided by the General Telephone Company of Illinois.
The dial telephone system consists of PBX equipment and numerous telephones located throughout the emergency response facilities.
Regular and WATS line service are included in this system. A microwave system is also incorporated into the dial telephone system.
Additional communications capabilities are available to certain areas through the ability to access remote IPC service area PBXs, the CPS PBX, and the Decatur PBX.
The system referred to by the licensee as the Centrex System is a touch tone system which would provide the primary communication system for NRC use.
This system is available at all facilities and is compatible with the NRC portable computer system.
Another system called the Focus System is available at the site and can be used to access outside lines.
This system, however, is not touch tone capable and is not compatible with the NRC portable computer system.
The licensee has plans to upgrade the Focus System to a touch tone system in the future Telephones available for use by the NRC at the EOF, BEOF, TSC, and JPIC are limited.
The DSO has telephones designated for his use at his desk in the EOF Decision-making Area.
The 050 has one Centrex line, one Focus line, and the ENS red phone is located at his desk.
The NRC Office has approximately three phones with multiple line capability located in it.
Also, several additional phones for NRC use will be available in the
,
Document Room.
The number of telephones available to the NRC in the
!
Decision-making Area of the E0F is currently inadequate.
The NRC would require access to additional phones in this area in order to function effectively.
The licensee stated that additional phones could be provided in the E0F but was not sure of the number that could be made available.
l
!
The licensee has not designated any telephones as NRC telephones in the TSC.
The NRC consultation Room, which is located across from the TSC, has two telephones available for NRC use.
The NRC would require additional telephones in the TSC to function effectively.
I q
1
, _ _ - - - _ _ _ _ _ _ _ _ _ _ _ _ _ __
-.
-
- - - - - - - - -
-
_ _ _ _ _ -_
_
__
_
_ _ _ _ _ _ _ _ _ _ _ _ _
..
The BEOF currently has only one telephone designated for the NRC at the DSO's desk.
Additional telephones for NRC use could be provided in areas outside of the BEOF if necessary. With the BE0F functioning as a backup-facility access to te'ephones outside of the BEOF would satisfy the NRC's needs.
The NRC would require additional telephones in the NRC Office area of the JPIC.
The office area has only one telephone available.
The NRC would require a minimum of three lines in this area to meet the needs of the Public Affairs staff.
Overall the NRC would require access to additional telephones in all of the ERF's'to meet it's needs.
This problem will need to be discussed in more detail in the future.
5.
NRC Computer Compatibility The COMPAQ portable. computer was tested for compatibility with both the Centrex and Focus telephone systems.
The computer can be used with the Centrex system but not with the Focus system because the Focus system is not touch tone capable.
Messages were sent and received from the site to the Region III office over the Centrex system with no problems experienced.
6.
Conclusion Space available to the NRC in the emergency response facilities (ERFs')
at the Clinton Power Station is adequate for the Expanded Activation Site Team (EAST).
Modifications to current facility layouts would be required to accommodate the EAST and to allow for collocation of key response personnel with their licensee counterparts in the E0F and the TSC.
Communications also appear to be adequate in the ERFs but the NRC would rned access to additional telephones to be most effective.
7.
Exit Interview The inspectors met with licensee representatives denoted in Section 1 on December 9, 1987.