ML23320A247
From kanterella
Letter Sequence Meeting | |
---|---|
EPID:L-2023-LRM-0098, TSTF-591 (Open) | |
MONTHYEARML23320A2472023-11-17017 November 2023
[Table View]Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 Project stage: Meeting 2023-11-17 |
ML23320A247 | |
Person / Time | |
---|---|
Site: | Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle |
Issue date: | 11/17/2023 |
From: | Scott Wall Plant Licensing Branch III |
To: | Rhoades D Constellation Energy Generation |
Wall, SP | |
References | |
EPID L-2023-LLR=0098 | |
Download: ML23320A247 (1) | |
Similar Documents at Calvert Cliffs, Dresden, Peach Bottom, Nine Mile Point, Byron, Braidwood, Limerick, Ginna, Clinton, Quad Cities, FitzPatrick, LaSalle | |
---|---|
Category:Meeting Summary
MONTHYEARML24270A2612024-10-17017 October 2024
[Table view]Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24277A2972024-10-10010 October 2024 October 2, 2024, Summary of Pre Submittal Public Meeting with Constellation Fitzpatrick, LLC to Discuss Future Amendment on Main Steam Line Radiation Monitor High Radiation System Isolations ML24275A0302024-10-0707 October 2024 Summary of Meeting with Constellation Energy Generation, LLC, Related to the Planned Amendment Request to Allow Modification of the Standby Gas Treatment System ML24261B7722024-09-18018 September 2024 Summary of Partially Closed Observation Meeting with Constellation Energy Generation, LLC, Related to the License Amendment Request to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital PPS ML24232A1532024-08-21021 August 2024 Summary of the August 8, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Plant, Units 2 and 3 ML24214A1402024-08-0505 August 2024 July 24, 2024, Summary of the Public Meeting Regarding Clinton Power Station, Unit 1, Partial Site Release ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24193A3432024-07-12012 July 2024 Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML24192A2122024-07-10010 July 2024 Summary of the May 22, 2024, Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Lasalle County Station, Units 1 and 2 ML24183A1642024-07-0202 July 2024 June 27, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML24162A2212024-06-24024 June 2024 Summary of April 11, 2024, Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (EPID L-2022-LLA- ML24170A8392024-06-18018 June 2024 June 12, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Byron Station, Units 1 and 2 ML24164A0182024-06-12012 June 2024 May 29, 2024, Summary of the Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2 ML24152A1852024-06-0404 June 2024 Summary of March 28, 2024, Closed Hybrid Pre-Submittal Meeting Between Constellation Energy Generation, LLC and the U.S. Nuclear Regulatory Commission Regarding a Future Amendment Request for Fuel Transition ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24151A2592024-06-0303 June 2024 May 22, 2024, Summary of Closed Meeting with Constellation Energy Generation, LLC, Related to the LAR to Support Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24135A3722024-05-22022 May 2024 Enclosure 1 - Meeting Summary for May 7 and May 9 2024 Public Scoping Meetings ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24079A2382024-03-19019 March 2024 Summary of March 7, 2024 Regulatory Conference with Constellation Nuclear Regarding Braidwood Station, Unit 2 ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML24009A0552024-01-24024 January 2024 Summary of January 8, 2024, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Removal of the Power Distribution Monitoring System from Technical Specifications ML24018A1772024-01-19019 January 2024 Summary of August 30, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Relaxation of Inspection Requirements for the Head Penetration P-75 Flaw ML23352A0592024-01-0909 January 2024 Summary of December 11, 2023, Meeting with Constellation on Alternative Request Involving Carbon Fiber Reinforced Polymer Composite ML23363A0942024-01-0303 January 2024 Summary of October 4, 2023, Pre Submittal Meeting Between the U.S. NRC and Constellation Energy Generation, LLC, Regarding Revising Technical Specification 3.7.9. Ultimate Heat Sink (UHS) ML23362A0042024-01-0202 January 2024 Documentation of Cancelled September 1, 2023, Presubmittal Meeting Between the NRC and Constellation Energy Generation, LLC, Regarding 6-Month Extension of Certain Reactor Pressure Vessel Weld Inspections ML23352A3822023-12-19019 December 2023 Summary of December 11, 2023, Presubmittal Meeting Between the U.S. Nuclear Regulatory Commission and Constellation Energy Generation, LLC, Regarding Deletion of Technical Specification 5.6.5.b.5 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23236A5132023-08-31031 August 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request ML23234A2342023-08-29029 August 2023 Summary of August 18, 2023, Meeting with Constellation Energy Generation, LLC, Related to the LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23237A2692023-08-25025 August 2023 Summary of the August 23, 2023 Public Outreach to Discuss the NRC 2022 End-of Cycle Plant Performance Assessment of Quad Cities Nuclear Power Station, Units 1 and 2 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23198A0152023-07-27027 July 2023 License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23200A2592023-07-24024 July 2023 June 27, 2023, Clinton Power Station License Renewal Environmental Pre-application Public Meeting-Meeting Summary ML23181A0612023-06-30030 June 2023 Summary of the June 15, 2023 Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23173A0072023-06-22022 June 2023 Summary of the Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23173A0142023-06-22022 June 2023 Summary of the June 14, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Clinton Power Station, Unit 1 ML23164A2112023-06-14014 June 2023 Summary of the June 1, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Braidwood Station, Units 1 and 2; and Byron Station, Units 1 and 2 ML23156A2472023-06-0909 June 2023 Summary of Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23118A3752023-06-0909 June 2023 Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23145A0352023-05-31031 May 2023 Summary of May 17, 2023, Meeting with Constellation Energy Generation, LLC Regarding Digital Modernization License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23129A0202023-05-30030 May 2023 Summary of March 22, 2023, Closed Meeting with Constellation Energy Generation, LLC, to Discuss a Future License Amendment Request That Allows Byron Station and Braidwood Station to Utilize a New Citicality Analysis for the Spent Fuel Pools ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23132A3082023-05-18018 May 2023 Summary of May 3, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23076A0132023-05-12012 May 2023 March 15, 2023, Summary of Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 ML23121A0022023-05-12012 May 2023 Summary of March 29, 2023, Audit Meeting with Constellation Energy Generation Concerning a Digital Instrumentation and Control Upgrade License Amendment Request for Limerick Generating Station, Units 1 and 2 2024-09-18 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23320A247&oldid=3643762"